| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-Finance SHANKAR HOUSE TOTU SHIMLA HP 171011 | SHIMLA | SHIMLA | HIMACHAL PRADESH | 171011 | L1 | Accepted-Finance ok | |
| 2 | L2₹5.3 L+₹23,401 (4.60%)Rejected-Finance BANSAL NIWAS RAM NAGAR SHIMLA 171004 HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 171004 | L2 | Rejected-Finance ok |
Tender Value
₹5.2 L
EMD Value
₹10,400
Closing Date
26 Feb 2026, 2:00 pmClosed
XEN Electrical Division No. 1 Shimla
The Executive Engineer Electrical Division No-1 HPPWD Shimla-9
AMC of 100 KV,KW UPS installed at Nirman Bhawan Building at Nigam Vihar Shimla 10.1.2026 to 09.01.2027
2026_PWD_128996_1
Electrical Division-I dated 20.02..2026
Open Tender
Electrical Works
Percentage
365 days
SHIMLA
As per bidding document
13 documents required · 13 mandatory
₹350
₹10,400
13 Mar 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
Annual Maintenance contract for 100KVA/100KW type online UPS (Eaton Make) including preventive and breakdown maintenance as per follwing conditions:
Preventive Maintenance
i)Preventive Maintenance will be done on quarterly basis
ii)Preventive Maintenance to be carried during working hours (Monday to Saturday) from 09:30am to 6:00PM or at times planned in advance.
iii)Preventive Maintenance includes functional checking,terminal connections (not loose and corrosion free) input and output voltages,load balancing, necessary adjustments of UPS systems etc.
iv)Preventive Maintenance includes cleaning,tightening ,inspection & Health checkup of batteries (battery discharge test if required)
v)Preventive Maintenance includes testing alarms,indicators, by pass operation and communication ports.
Breakdown Maintenance
Breakdown Maintenance work shall be carried out throughout the AMC period and attend the fault complaint whenever called upon.
Breakdown Maintenance includes fault finding, repair or replacement of defective parts if required.(exluding batteries and electrical switchgear items only) Spare Parts replaced/removed must be of the same or equivalent make and will be property of the contractor/firm after replacement.
Conditions:-
Rates should be quoted for all heights including all leads and lifts for internal and external works for all floor levels.
Useful materials should be handed over to the Assistant Engineer Electrical Sub Division No.II, Sectt. Shimla, otherwise credit for useful materials will be charged.
Sample of all the material to be used on work shall be got approved from the Engineer-in-charge in advance before actual use on work and any or all of the material which are available as per Indian standard in the market should confirm to bureau of indian standards.
It is certify that the tender is being called on emergentnature in exigency of Public insterest.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
SBD_1_mc.pdf
Tender Documents • 3.92 MB
DeclarationNEW.pdf
Additional Documents • 0.01 MB
BOQ_190700.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .