| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85.1 LAccepted-Finance FLAT NO S 1 NEAR JAMIYA MASJID COTTOWADA PONDA GOA | SOUTH GOA | GOA | 403103 | ₹85.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹91.8 LRejected-Finance HOUSING BOARD COLONY BORDEM BICHOLIM GOA | NORTH GOA | GOA | 403001 | ₹91.8 L | L2 | Rejected-Finance WORK RECOMMENDED TO Noorul construction |
| 3 | L3₹95.8 LRejected-Finance | ₹95.8 L | L3 | Rejected-Finance WORK RECOMMENDED TO Noorul construction |
| 4 | L4₹99.6 LRejected-Finance | ₹99.6 L | L4 | Rejected-Finance WORK RECOMMENDED TO Noorul construction |
| 5 | L5₹1.1 CrRejected-Finance | ₹1.1 Cr | L5 | Rejected-Finance WORK RECOMMENDED TO Noorul construction |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
22 Apr 2026, 3:00 pmClosed
EXECUTIVE ENGINEER,DIV .XXIII(R)
Bicholim Goa
Construction of culvert for diverting monsoon water entering market area near V.P. Pale-Kothambi in Sankhali Constituency of Bicholim Taluka.
2026_PWD_28649_1
PWDWDXXIII/ASW/26-27/F10/01/L2
Open Tender
Civil Works - Roads
270 days
Bicholim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹2.1 L
15 May 2026
13 Apr 2026
24 Apr 2026
13 Apr 2026
22 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete wood work, steel work, including T & P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metresas per MORTH 202 XIII)Removing all types of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works as per MORTH specification202
Above 600 mm to 900 mm dia | - | cum | - | - |
| 2 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.as per MORTH Specification 301 | - | cum | - | - |
| 3 | Earthwork in excavation of foundation of structures of culverts,abntments piers, retaining walls etc. as per drawing and technical specification, including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavation earth to the extent required and utilising the remaning earth locally for road work upto 3.00 m depth as per MORTH Specification 304
EXCLUDING DEWATERING
Ordinary soil
Mechanical Means | - | cum | - | - |
| 4 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | - | cum | - | - |
| 5 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :
a)All works upto plinth level | - | cum | - | - |
| 6 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :
b)In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.l. | - | cum | - | - |
| 7 | Providing and laying in position (1: 1½/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size)
All works upto plinth level | - | cum | - | - |
| 8 | Centering & shuttering including Strutting, Propping & removal of forms for :
Foundations, Footings, Bases for columns | - | Sqm | - | - |
| 9 | Centering & shuttering including Strutting, Propping & removal of forms for :
Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like | - | Sqm | - | - |
| 10 | Centering & shuttering including Strutting, Propping & removal of forms for : Suspended floors, roofs landings, shelves & their supports | - | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
Tendernotice_2.pdf
PDF • 0.80 MB
Tendernotice_3.pdf
PDF • 0.49 MB
BOQ_29088.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid