| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.1 LAdmitted-Finance 3 JAINANDAN NIWAS NEAR MITALI APARTMENT OPP KORUM MALL KHOPAT THANE 400602 | THANE | THANE | MAHARASHTRA | 400602 | ₹40.1 L | L1 | Admitted-Finance |
| 2 | L2₹41.9 LAdmitted-Finance | ₹41.9 L | L2 | Admitted-Finance |
| 3 | L3₹42 LAdmitted-Finance N 4 NS 4 PLOT NO 6 7 OPP PUNDLIK NAGAR WATER TANK AURANGABAD 431 001 | AURANGABAD | AURANGABAD | MAHARASHTRA | 431001 | ₹42 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Tirupati Electricals Sales & Services L3 | Kevla Engineering L1 | Controlflow Solutions Private Limited L2 |
|---|---|---|---|---|---|---|
| 1.00Sub Estimate M&R to EDS in Taloja Indl Area.... Providing of 22 KV HT Panel along with TCMU at EDS Taloja phase-II pumping station.. | ||||||
| 2.00 | 1. Dismantling of 6 pole substation structure etc. complete to clear the site. | 1 | Job | 20,000 ₹20,000 | 15,000 ₹15,000 | 19,000 ₹19,000 |
| 3.00 | 2. Supplying, installing, testing and commissioning HT Panel outdoor type 22kV, 630A VCB, 21kA/3sec, incomer 1 No. 2 No. 22kV, 630A, VCB 21kA/3sec 2 nos. outgoing feeder with VCB compliant to IEC 62271-100, 200 and 102 as per specification no. SW-HTS. including all Accessories. 2 | 1 | Job | 37,10,000 ₹37.1 L | 36,50,000 ₹36.5 L | 37,00,000 ₹37 L |
| 4.00 | 3. Providing, supplying, erecting & commissioning of Transformer condition monitoring unit ( TCMU) comprising of sensor for transformer oil level , oil temperature , lug temperature , Humidity, Voltage ,current and ambient noise on real time. | 1 | Number | 2,65,000 ₹2.6 L | 2,40,000 ₹2.4 L | 2,63,000 ₹2.6 L |
| 5.00 | 4. HT Cables (CB-HT)
4.1. Supplying , erecting & terminating XLPE insulated, galvanised steel formed wire armoured (strip) cable 22 kV(E), 3 x 300 sq. mm. aluminium conductor laid in provided trench / pipe as per specification no. CB-HT | 40 | Meter | 4,000 ₹1.6 L | 3,500 ₹1.4 L | 3,900 ₹1.6 L |
| 6.00 | 5. Cable Joints & End Termination Kits (HT Cables) (CB-JT/HT)
5.1. Providing and erecting Heat shrinkable indoor termination kit for 11 kV (UE)/ 22 kV ( E ) XLPE HT cable 3x240 to 400 sq. mm. with necessary material as per specification no. CB-JT/HT | 3 | each | 17,500 ₹52,500 | 16,000 ₹48,000 | 19,000 ₹57,000 |
| 7.00 | 6. Rebate for Released for material of 6 pole substation structure etc.at site EDS Taloja phase-II pump house (Minimum rebate of Rs 25000.00 will be recovered irrespective of quoted amount) | 1 | Lumpsum | 7,500 -₹7,500 | 83,000 -₹83,000 | 10,000 -₹10,000 |
Tender Value
₹40.1 L
EMD Value
₹40,200
Closing Date
21 May 2026, 5:00 pmClosed
SE E and M Comm Mumbai
Office of the Superintending Engineer (E and M) (comm.), MIDC Udyog Sarthi, Andheri (E), Mumbai-93.
DD TALOJA INDUSTRIAL AREA M and R to EDS in Taloja Indl Area Providing of 22 KV HT Panel along with TCMU at EDS Taloja phase-II pumping station
2026_MIDC_1300960_1
MIDC/E and M/AMB/38567/13/2026-27
Open Tender
Electrical and Maintenance Works
180 days
Taloja
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,030
₹40,200
25 May 2026
7 May 2026
25 May 2026
7 May 2026
21 May 2026
13 May 2026
7 May 2026 - 11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sub Estimate
M&R to EDS in Taloja Indl Area.... Providing of 22 KV HT Panel along with TCMU at EDS Taloja phase-II pumping station.. | - | - | - | - |
| 2 | 1. Dismantling of 6 pole substation structure etc. complete to clear the site. | 1 | Job | - | - |
| 3 | 2. Supplying, installing, testing and commissioning HT Panel outdoor type 22kV, 630A VCB, 21kA/3sec, incomer 1 No. 2 No. 22kV, 630A, VCB 21kA/3sec 2 nos. outgoing feeder with VCB compliant to IEC 62271-100, 200 and 102 as per specification no. SW-HTS. including all Accessories. 2 | 1 | Job | - | - |
| 4 | 3. Providing, supplying, erecting & commissioning of Transformer condition monitoring unit ( TCMU) comprising of sensor for transformer oil level , oil temperature , lug temperature , Humidity, Voltage ,current and ambient noise on real time. | 1 | Number | - | - |
| 5 | 4. HT Cables (CB-HT)
4.1. Supplying , erecting & terminating XLPE insulated, galvanised steel formed wire armoured (strip) cable 22 kV(E), 3 x 300 sq. mm. aluminium conductor laid in provided trench / pipe as per specification no. CB-HT | 40 | Meter | - | - |
| 6 | 5. Cable Joints & End Termination Kits (HT Cables) (CB-JT/HT)
5.1. Providing and erecting Heat shrinkable indoor termination kit for 11 kV (UE)/ 22 kV ( E ) XLPE HT cable 3x240 to 400 sq. mm. with necessary material as per specification no. CB-JT/HT | 3 | each | - | - |
| 7 | 6. Rebate for Released for material of 6 pole substation structure etc.at site EDS Taloja phase-II pump house (Minimum rebate of Rs 25000.00 will be recovered irrespective of quoted amount) | 1 | Lumpsum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.74 MB
TenderDocument.pdf
Tender Documents • 0.31 MB
ItemSpecification.pdf
Other Document • 0.03 MB
BOQ_2233918.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid