Loading…
Loading…
Tender Value
₹84.7 L
EMD Value
₹84,673
Closing Date
24 Aug 2026, 5:00 pmDue tomorrow
COMMISSIONER, SMC
Commissioner Sambalpur Municipal Corporation
Construction of Boundary wall and leveling of Kainsir play ground (Improvement of Kanisir Play Field) ward no- 20, under SMC Sambalpur
2026_ORULB_138060_1
24/SMC_SBP/2026-27
National Competitive Bid
Civil Works - Others
Percentage
Sambalpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹84,673
Yes
7 Aug 2026
7 Aug 2026
25 Aug 2026
7 Aug 2026
24 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in hard or gravelly soil with initial lead & lift including rough dressing & levelling the bed etc. complete. | 268 | cum | 235.7 | ₹63,167.6 |
| 2 | Filling in foundation and plinth with excavated materials including watering ramming etc complete S/R P-8 item No.14 | - | cum | 170 | - |
| 3 | By Mechanical Transport including loading unloading & Stacking. | 550 | cum | 320 | ₹1,76,000 |
| 4 | Supplying , filling Sand in F & P including cost, Conveyance & royalty of sand, cost of all labour, T & P, labour cess, watering, ramming etc. complete. | 42.2 | cum | 857.3 | ₹36,178.06 |
| 5 | Preparation and consolidation of sub grade with power with power road roller of 8 to 12 tonne capacity after excavating earth to an avarage of 22.5 cm depth,dressing to camber & undulations etc. and re-rolling the sub grade and disposal of surpus earthwith lead upto 50 metres. | 50 | cum | 148.01 | ₹7,400.5 |
| 6 | Cement Concrete (1:4:8) using 4cm size B.H.G. (C. B.) Metal including cost, conveyance , royalty & taxes of all materials etc. complete | 32 | cum | 5,626.3 | ₹1,80,041.6 |
| 7 | Supplying fitting fixing and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification | 14.9 | Qntl. | 9,534.7 | ₹1,42,067.03 |
| 8 | Rigid & smooth centering & shuttring for RCC works including false work & dismentling them after casting including cost of materials complete | 864 | cum | 249.8 | ₹2,15,827.2 |
| 9 | Rigid & smooth centering & shuttring for RCC works including false work & dismentling them after casting including cost of materials complete A).R.C.C. work in column base, foundation and plinth band:- | 57 | cum | 6,040 | ₹3,44,280 |
| 10 | B.R.C.C Column and Beam:- | 68 | cum | 17,862.2 | ₹12,14,629.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_604980.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].