Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
18 Sept 2026, 2:00 pm
SE,PWD Northern Electrical Circle, Malda
Superintending Engineer, P.W. Dte., Northern Electrical Circle, Mangalbari, Malda - 732142.
Balance work for SITC of Air Conditioning System at Modular OT at IPD building of the newly constructed 250 bedded building under Kaliyaganj SGH, Uttar Dinajpur.
2026_WBPWD_5019527_1
WBPWD/SE/NEC/NIT-08/2026-27
Open Tender
ELECTRICAL WORKS ORG
Item Rate
Kaliyaganj SGH, Uttar Dinajpur
Please refer Tender documents.
5 documents required · 5 mandatory
₹2.0 L
O/O, SE/NEC, Mangalbari, Malda.
20 Aug 2026
20 Aug 2026
21 Sept 2026
21 Aug 2026
18 Sept 2026
2 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.01 | Condensor Unit | - | - | - | - |
| 1 | Condensor Unit for Minimum Cooling Capacity 29.75 KW system :-
SITC of 8.5 TR Capacity Microprocessor based air cooled Condensing Unit Eco Friendly refrigerant (R32/R410A), variable speed , thermostatic expansion valve, multiple scroll/screw compressor, arrangement for operation with Dx type AHU, and suitable for operation on 415+/-10% Volt, 50Hz, 3 PH AC supply with adequate auxilary protection like oil heater with thermostat for prevention of ingress of liquid refrigerent in the compressor piston chamber, over current, HP/LP Cut outs, Power contactors & control logic circuit for periodic operation of working & standby Condenser fans, Compressors and matching condensing units. Outdoor Air cooled Condenser unit shall comprise multi row Copper coil with Aluminium fins and Axial fan as required, housed in a sheet metal chamber with adequate ventilation as per OEM standard.
(Make: General/ Hitachi / Voltas/ Daikin/ Bluestar/Carrier/ Mitshubishi Electric)
No extra shall be payable for refrigerant gas & transportation/ shifting work.
( IPD Building-1st- Fracture Cum Casuality OT, Eye OT, Orthopaedic OT & Pre-Post OT) | 4 | Set | 10 | ₹40 |
| 3Air Handling Unit | |||||
| 4Floor Mounted Indoor type Air Handling Unit - | |||||
| 5SITC of site assembled type modular Single skinned construction with continuous insulation with thermal break. Outer skin has to be polymer coated and insulation panel should be made of thermal break profile - PUF insulation with thickness of at least 40mm or better. The AHU should have a module / arrangement for extracting @ 330 CFM stale air with the arrangement of VCD and injection of fresh air @330 CFM with VCD and mixing chamber for balance return air and fresh air with 03 (Three) stage filtration system (Prefilter having efficiency (EU - 4/MERV7) 90% down to10 micron & Fine Filter having efficiency 95% down to 5 micron (MERV-14) (Make - FMI/ Spectrum/ Thermi) . The AHU Coil to be with hydrofolic coating. The addon suitable gadgets shall be a set of control valve with pressure gauge & temparature gauge each AHU. | |||||
| 7SITC of site assembled type modular Single skinned construction with continuous insulation with thermal break. Outer skin has to be polymer coated and insulation panel should be made of thermal break profile - PUF insulation with thickness of at least 40mm or better. The AHU should have a module / arrangement for extracting @ 540 CFM stale air with the arrangement of VCD and injection of fresh air @540 CFM with VCD and mixing chamber for balance return air and fresh air with 03 (Three) stage filtration system (Prefilter having efficiency (EU - 4/MERV7) 90% down to10 micron & Fine Filter having efficiency 95% down to 5 micron (MERV-14) (Make - FMI/ Spectrum/ Thermi). The AHU Coil to be with hydrofolic coating. The addon suitable gadgets shall be a set of control valve with pressure gauge & temparature gauge each AHU. | |||||
| 11�ԁЀᘀ䥓䍔漠䰠浡湩牡䈠湥档Ĺ匀呉⁃景䄠畬業楮浵氠浡湩牡戠湥档眠瑩数晲牯瑡摥猠敨瑥†潣敶潴愠捣浯潭慤整椠獮摩䕈䅐映汩整慢歮愠潬杮眠瑩敮散獳牡⁹畳灰牯⁴獡瀠牥猠慴摮牡景洠湩浩浵㘠映⁴⁘昸⁴楤敭獮潩潦呏䄠敲獡瀠牥愠灰潲敶牤睡湩敮散獳牡⁹汦湡敧樠楯瑮景愠物搠捵⁴桳污慨敶琠敢映硩摥眠瑩敳污湡⁴摡敨楳敶琠牰癥湥⁴敬歡条匀呉⁃䙏删䙅䥒䕇䅒呎倠偉义⁇ϛ匀灵汰ⱹ椠獮慴汬瑡潩Ɱ琠獥楴杮☠挠浯業獳潩楮杮漠潣灰牥爠晥楲敧慲楴湯瀠灩楬敮映牯氠煩極湡畓瑣潩楬敮椠据畬楤杮瘠捡畣業穡瑡潩湡楎牴杯湥漠整瑳湩景映汯潬楷杮渠浯湩污猠穩景猠景⽴栠牡牤睡潣灰牥爠晥楲敧敲瑮瀠灩湩潦慐正条⽥䐠捵慴汢⽥䌠湯散污摥匠汰瑩 潒浯䄠⁃祳瑳浥潣灭敬整眠瑩楦瑴湩獧眠瑩愠橤獵慴汢楲杮琠灹慨杮牥猠灵潰瑲ⱳ樠楯瑮湩⽧戠慲楺杮椠据畬 | |||||
| 12 | equately required. The entire structure should be fabaricated & safe for ODU maintenance. Area & design of the platform should be as per Machines' Outdoor unit's dimension & load with adequate movement access for maintenance as per direction of EIC.
The M.S. Angles of sizes (75 mm x 75 mm x 5 mm) (50 mm x 50 mm x 6 mm) , (40 mm x 40 mm x 6 mm) , (25 mm x 25 mm x 5 mm) minimum and M.S u-channel of 5 mm thick of size (75 mm x 40 mm x 40 mm) may be used for making platform. (Structural design should be approved by E.I.C.) 0SITC OF DRAIN PIPING WITH INSULATION - PVC PipesÝSupply & laying of rigid PVC drain pipe (Medium class) with necessary fitting proper supports at 5 ft interval and duly insulated with 9 mm thk. Nitrile Rubber Insulation having weather protective coating as per drawing."32 mm dia PVC pipe with insulation"40 mm dia PVC pipe with insulationHCondensor Unit for Minimum Cooling Capacity 38.5 KW system :-
SITC of 11 TR Capacity Microprocessor based air cooled Condensing Unit Eco Friendly refrigerant (R32/R410A), variable speed , thermostatic expansion valve, multiple scroll/screw compressor, arrangement for operation with Dx type AHU, and suitable for operation on 415+/-10% Volt, 50Hz, 3 PH AC supply with adequate auxilary protection like oil heater with thermostat for prevention of ingress of liquid refrigerent in the compressor piston chamber, over current, HP/LP Cut outs, Power contactors & control logic circuit for periodic operation of working & standby Condenser fans, Compressors and matching condensing units. Outdoor Air cooled Condenser unit shall comprise multi row Copper coil with Aluminium fins and Axial fan as required, housed in a sheet metal chamber with adequate ventilation as per OEM standard.
(Make: General/ Hitachi / Voltas/ Daikin/ Bluestar/Carrier/ Mitshubishi Electric)
No extra shall be payable for refrigerant gas & transportation/ shifting work.
(IPD Building- 1st Fl- General Surgery & ENT OT)>´The AHU Fan assembly should be either motor directly coupled with Impeller or Belt driven as per OEM standard suitable for air velocity range 7.3 - 8.2 ft./Sec through the multi-layer (6-8 row)12 mm - 19 mm dia Copper tubes with Alluminium Fins (as per OEM standard). There should be AHU fans of Forward/ Backward Curve, with discharge not less than 3400 CFM, compatable for 415V, 50 Hz supply continuous duty Class IE 1 (Make for Fan Unit - Nicotra/ Kruger/ Caryaire) (Make for Motor - Crompton / Kirloskar/ NEC/ ABB/ Siemens).External Static pressure shall be within 10 - 20 mm Wg +obstruction to overcome hepa filter at laminer bench. There should be electrical interlocking/switching arrangement for running the system in possitive or negetive pressure mode as per requirement. (Make : Zeco / System Air/ Edgetech/Daikin/Jaypee/Carrier India) (AHRI/EUROVENT CERTIFIED)
(IPD Building-1st- Fracture Cum Casuality OT, Eye OT & Orthopaedic OT )mïSITC of site assembled type modular single skinned construction with continuous insulation with thermal break. The AHU enclosure's outer skin has to be polymer coated and insulation panel should be made of thermal break profile - PUF insulation with thickness of at least 40mm or better. Extracting stale air @ 345 CFM with the arrangement of VCD and injection of fresh air @ 345 CFM with VCD and mixing chamber for return air and fresh air with 03 (Three) stage filtration system (Prefilter having efficiency (EU - 4/MERV7) 90% down to10 micron & Fine Filter having efficiency 95% down to 5 micron (MERV-14) (Make - FMI/ Spectrum/ Thermi). The addon suitable gadgets shall be a set of control valve with pressure gauge & temparature gauge each AHU.The AHU Fan assembly should be either motor directly coupled with Impeller or Belt driven as per OEM standard suitable for air velocity range 7.3 - 8.2 ft./Sec through the multi-layer (6-8 row)12 mm - 19 mm dia Copper tubes with Alluminium Fins (as per OEM standard). There should be AHU fans of Forward/ Backward Curve, with discharge not less than 4400 CFM, compatable for 415V, 50 Hz supply continuous duty Class IE 1 (Make for Fan Unit - Nicotra/ Kruger/ Caryaire) (Make for Motor - Crompton / Kirloskar/ NEC/ ABB/ Siemens).External Static pressure shall be within 10 - 20 mm Wg +obstruction to overcome hepa filter at laminer bench. There should be electrical interlocking/switching arrangement for running the system in possitive or negetive pressure mode as per requirement. (Make : Zeco / System Air/ Edgetech/Daikin/Jaypee/Carrier India) (AHRI/EUROVENT CERTIFIED)
(IPD Building- 1st Fl- General Surgery & ENT OT)AfmThe AHU Coil to be with hydrofolic coating. The AHU Fan assembly should be either motor directly coupled with Impeller or Belt driven as per OEM standard suitable for air velocity range 7.3 - 8.2 ft./Sec through the multi-layer 12 mm - 19 mm dia Copper tubes with Alluminium Fins (as per OEM standard). There should be AHU fans of Forward/ Backward Curve, with discharge not less than 3400 CFM, compatable for 415V, 50 Hz supply continuous duty Class IE 1 (Make for Fan Unit - Nicotra/ Kruger/ Caryaire) (Make for Motor - Crompton / Kirloskar/ NEC/ ABB/ Siemens). External Static pressure will be within 10 - 20 mm Wg. (Make : Zeco / System Air/ Edgetech/ Daikin/ Jaypee/ Carrier India )(AHRI EUROVENT CERTIFIED) (For IPD Building- 1st Fl.- Pre Operative & Recovery )cÏRMKgs.SQMSq MtrMajor & minor civil works required to execute before and after the HVAC works for mending good damages to original finish paintingJobTContract No: WBPWD/SE/NEC/e-NIT-08/2026-27. ØName of Work: Balance work for SITC of Air Conditioning System at Modular OT at IPD building of the newly constructed 250 bedded building under Kaliyaganj SGH, Uttar Dinajpur. RN26000050.,Project ID:- HF252649630S000 | 5 | No | 10 | ₹50 |
| 50TERMS & CONDITIONS | |||||
| 51(i) The Agency must procure the materials from the Manufacturer / OEM or from their authorised sales channel so that the standard warranty / support of the Manufacturer / OEM becomes applicable to the products to be delivered and installed by them. (ii) Documents that authenticates such procurement from the Manufacturer / OEM or from their authorized sales channel and standard warranty / support should be sent from the e-mail of the Manufacturer / OEM / authorized sales channel to the e-mail of Engineer-in-Charge and hard copy of it to be submitted during execution, of work/submission of bill. (iii) If any refurbished material is supplied and installed, penal action will be taken as per existing rules. General Guideline: 1) LED Lights must confirm the safety requirements as specified in IS16102 (Part 1) 2) LED light should meet the harmonics requirement as per IS14700 (Part 3/Sec 2) 3) LED products should meet the power factor requirements as per IS16102 (Part 2) 4) Lighting must confirm the photo biological test as specified in IS 16108. 5) LM 79 report needs to be submitted to BEE 6) Luminious efficacy of electric appliances must not drop to 5% after 1000 hour of service life. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.41 MB
Tendernotice_2.pdf
PDF • 0.55 MB
BOQ_5092045.xls
BOQ • 6.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].