Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.7 LAdmitted-Finance 302 SHIV SADAN OPP ANAND MILAN SOC NEAR FIVE SHOP BHATIA CHOWK ULHASNAGAR 421004 | THANE | MAHARASHTRA | 421004 | -26.27% | ₹6.7 L | L1 | Admitted-Finance |
| 2 | L2₹7.8 L+₹1.1 L (16.6%)Admitted-Finance | -14.00% | ₹7.8 L+₹1.1 L (16.6%) | L2 | Admitted-Finance |
| 3 | L3₹8.0 L+₹1.3 L (19.2%)Admitted-Finance | -12.13% | ₹8.0 L+₹1.3 L (19.2%) | L3 | Admitted-Finance |
| 4 | L4₹8.5 L+₹1.8 L (26.5%)Admitted-Finance | -6.70% | ₹8.5 L+₹1.8 L (26.5%) | L4 | Admitted-Finance |
Tender Value
₹9.9 L
EMD Value
₹19,800
Closing Date
12 Aug 2026, 6:00 pmClosed
EXECUTIVE OFFICER
nagar palika neemrana
REPAIR AND CONSTRUCTION WORK OF WALL AT PARK SHAMSHAN GHAT IN MUNICIPAL BOARD AREA IN NEEMRANA
2026_DLB_579943_7
npn/1210
Open Tender
Civil Works
Percentage
365 days
nagar palika neemrana
Please refer Tender documents
2 documents required · 2 mandatory
₹1,000
EO, MDRISL
₹19,800
Yes
18 Aug 2026
31 Jul 2026
13 Aug 2026
31 Jul 2026
12 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.In all type of soil | 20.7 | Cum | 235.5 | ₹4,874.85 |
| 2 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete. | 92 | Sqm | 236.5 | ₹21,758 |
| 3 | Random rubble stone masonry work in cement mortar with mechanical mixer in foundation (at any level) complete as per drawing and technical specification and as per clause 1000 and 1400 of MoRT&H specification including all scaffolding material,
labour, machinery but excluding pointing and plastering. In cement mortar 1:4 (1 cement : 4 coarse sand) cum 5,270.00 | 135 | Cum | 5,270 | ₹7,11,450 |
| 4 | Brick work with FPS bricks of class designation 75 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 34.5 | Cum | 4,955 | ₹1,70,947.5 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
ANNUXURE_merged.pdf
Tender Documents • 8.60 MB
BOQ_1030530.xls
BOQ • 0.27 MB
CORRI09.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .