Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.4 Cr+₹17.0 L (3.98%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.4 Cr+₹17.9 L (4.19%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical Non-Responsive | ||
| 5 | Rejected-Technical CHINAR COMMERCIAL COMPLEX THE BUND RESIDENCY ROAD SRINAGAR 190 001 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | - | Rejected-Technical Non-Responsive |
Tender Value
₹4.6 Cr
EMD Value
₹9.2 L
Closing Date
5 Apr 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Coordinator, CAT, WUCMA, Rajbagh, Srinagar
Office of the Project Coordinator CAT Wular Conservation and Management Authority, Forest Complex Rajbagh (Near Silk Factory), Srinagar, Kashmir, Jammu and Kashmir - 190001
Upgradation of Gurura Park, near vantage, S.K Payeen (CAPEX)
2025_FD_273744_2
e-NIT NO 09 OF 2024-25 DATED 04-03-2025 (WUCMA)
Open Tender
Civil Works
Percentage
520 days
Gurura Park, near vantage, S.K Payeen
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Government Treasury under Account Head 0406-Forest
₹9.2 L
28 May 2025
6 Mar 2025
7 Apr 2025
6 Mar 2025
5 Apr 2025
6 Mar 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation,for levelling etc. complete. | 4,304.46 | CUM | 276.6 | ₹11,90,613.64 |
| 2 | supplying and filling of stone gravel 60 mm with already supplied earth in geocell including ramming watering packing etc. including carriage for lead upto 20KM. | 634.38 | CUM | 1,212.91 | ₹7,69,439.78 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 5,501.23 | CUM | 218.4 | ₹12,01,468.63 |
| 4 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 1,112.26 | CUM | 187.3 | ₹2,08,326.3 |
| 5 | Supply of HDPE Geocell , 200 mm deep, with USWD-C/C 356, having density greater than 0.935 g/cm3 with multitude rhomboidal indentations, textured & perforated with horizontal rows of maximum 10mm dia holes. Performations within each row shall be 19mm on center. The quantity of perforations shall remove + /- 17% of cell wall area having 200 mm cell depth with minimum sheet thickness of 1.20 mm & having yield strength of 18 kN/n1. to complete the job as oer drawing & direction of Engineer-In-Charge incl. Labour Charges for carrying, transporting, laying, fixing & filling of HDPE Geocell 150 mm thick including acessories and equiomment as per Instruction of Engineering Incharge. | 3,987.5 | SQM | 679 | ₹27,07,512.5 |
| 6 | Supply and laying of non-woven Geo-textile fabric sheets of 400 GSM manufactured from 100% virgin Polypropylene (PP) fibre with minimum properties as per IS 16653: 2017 (i) Wide Tensile strength (MD) ≥15KN/m & Wide Tensile strength (CD) ≥15KN/m (ii) Elongation (MD) ≥50% & Elongation (CD) ≥50% (iii) Abrasion ≥95% (iv) Trapezoidal Tear Strength (MD) ≥340 N & Trapezoidal Tear Strength (CD) ≥340 N (v) CBR Puncture strength ≥3000 N (vi) Permittivity ≥1.25 s-1 (vii)Permeability ≥60l/m2/sec (viii)AOS ≤75micron (ix)UV Resistance @500 hours retained Tensile strength (MD) & (CD) ≥80% (x) Mass ≥ 300gm/m² (xi)Thickness at 2KPa ≥3mm. | 9,533.64 | SQM | 124 | ₹11,82,171.36 |
| 7 | P/L of stone soling incl. ramming,hand packing and all carriages, complete job in geocell,trenches,foundation etc. upto a lead of 15km | 65.81 | CUM | 1,255 | ₹82,587.23 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 389.53 | CUM | 5,202.9 | ₹20,26,688.45 |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 147.31 | CUM | 6,591.25 | ₹9,70,943.86 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 215.43 | CUM | 7,788.4 | ₹16,77,882.19 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
BOQ_845182.xls
BOQ • 0.36 MB
BOQ.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .