Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.1 CrAccepted-AOC SAB JOHN THOTTAM OMALUR PO TK SALEM 636404 | SALEM | SALEM | TAMIL NADU | 636404 | ₹67.1 Cr Quoted ₹60.8 Cr | L1 | Accepted-AOC Plus Two Point Nine Five Percentage excess over the current departmental value |
| 2 | L2₹68.8 CrRejected-AOC 155 A KAIKATTIPUDUR TIRUPPUR ROAD AVINASHI 641654 | AVINASHI | TIRUPPUR | TAMIL NADU | 641654 | ₹68.8 Cr | L2 | Rejected-AOC Rejected due to Plus Twenty Four Point Six Two Percentage excess over the current departmental value |
Tender Value
₹57.6 Cr
EMD Value
₹43.2 L
Closing Date
6 Jun 2022, 3:00 pmClosed
The Chief Engineer TWAD Board Coimbatore
O/o.The Chief Engineer, TWAD Board, No.30, Siruvani Nagar, Bharathipark Road, Coimbatore - 641 043.
Retrofitting of existing CWSS to Kaveripuram and 141 Habitations in Kolathur Union of Salem District under JJM 2021-2022
2022_TWAD_232504_1
IFB_05_Kaveripuram
Open Tender
Civil Works
365 days
Kaveripuram in kolathur union of Salem District
As per Clause 7.2 of Bid Document
4 documents required · 4 mandatory
₹0
₹43.2 L
Yes
The Chief Engineer TWAD Board Coimbatore
4 Nov 2022
17 May 2022
7 Jun 2022
17 May 2022
6 Jun 2022
17 May 2022
17 May 2022 - 25 May 2022
25 May 2022
Construction of Coffer Dam arrangements in River Cauvery at Nadugulam
Construction of RCC Leading channel for 350 m length
Supply, Delivery, Erection and Testing of Vertical Turbine Pumpsets at Headworks
Supply, Delivery, Erection and Testing of Horizontal split casing centrifugal pumpsets at WTP
WTP- Full Cale Treatment Plant (7.20 MLD)
Construction of Aerator
Construction of Raw water collecting Channel 5.00 m length
Construction of Stilling chamber of 3.50 x 2.00 x 2.00 m size
Construction of Raw water Measuring Channel of 5.00 m length
Construction of Flash Mixer
Construction of Clariflocculator
Construction of Filter house and Chemical House
Pipe Connections works in Treatment Plant.
Construction of Sludge Collection Well
Construction of Clarified water channel
Constructions of Sludge Drying Beds
Mechanical and Electrical Items
Construction of Wash Water Tank 2.0 LL Capacity with 12.0m staging height Water Treatment Plant
Construction of Clear water sump 15.00 LL Capacity at Water Treatment Plant
Raw Water Pumping Main
Clear Water Pumping Main
Pumping, Branch and Feeder Main
Replacement of Existing Submersible pumpsets at various sumps
Construction of Pipe Carrying Bridge at 2 Locations
Construction of Sump at 12 Locations (0.25 LL to 2.00LL Cap)
Construction of Pumprooms at various locations of Size - 4 m x 3 m - 7 Nos
Construction of Compound wall at various locations of Size - 15 m x 15 m - 3 Nos
Maintenance charges (Excluding energy charges) of period for 6 months
VR WATER INFRA COMPANY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid