| 1 | L1₹5.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹6.2 L+₹60,936.80 (11.0%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹6.6 L+₹1.1 L (19.8%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S RINKU CONTRACTOR L3 | SON VIR L2 | M/S SHREE JEE CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Silt clearance by hydraulic excavator/ JCB including lift upto 1.50 M and lead upto 6.0 M i/c cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc including levelling & dressing as per direction of Engineer in Charge. | 7,606 | Cum | 42 ₹3,19,452 | 39.1 ₹2,97,394.6 Lowest | 40 ₹3,04,240 |
| 2.00 | Silt clearance with slush, lehal and Shifting upto 1.0 KM by hydraulic excavator/ JCB including lift upto 1.50 M and lead upto 6.0 M i/c cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc including levelling & dressing as per direction of Engineer in Charge. | 910 | Cum | 170.4 ₹1,55,064 | 150 ₹1,36,500 | 120 ₹1,09,200 Lowest |
| 3.00 | Scrapping internal section of existing channel i.e. bed and slopes with silt up to 5.0 cm as per direction of Engineer in Charge. | 36,802 | Sqm | 4.5 ₹1,65,609 | 4.4 ₹1,61,928.8 | 3.3 ₹1,21,446.6 Lowest |
| 4.00 | Uprooting jhunds including back filling and dressing as per direction of Engineer in Charge. | 661 | No | 37 ₹24,457 | 30 ₹19,830 Lowest | 30 ₹19,830 Lowest |
Tender Value
₹6.8 L
EMD Value
₹13,560
Closing Date
29 Sept 2025, 1:00 pmClosed
EE BDGC BSR
EE BDGC BSR
Silt Clearance of Jarcha Dy. From Km. 0.000 to 14.720
2025_UPIDC_1076507_18
08/EE/2025-26
Open Tender
Civil Works
Item Rate
30 days
Bulandshahr
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹13,560
Yes
Bulandshahr
3 Oct 2025
23 Sept 2025
29 Sept 2025
23 Sept 2025
29 Sept 2025
23 Sept 2025
23 Sept 2025
Amount
Silt clearance by hydraulic excavator/ JCB including lift upto 1.50 M and lead upto 6.0 M i/c cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc including levelling & dressing as per direction of Engineer in Charge.
Silt clearance with slush, lehal and Shifting upto 1.0 KM by hydraulic excavator/ JCB including lift upto 1.50 M and lead upto 6.0 M i/c cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc including levelling & dressing as per direction of Engineer in Charge.
Scrapping internal section of existing channel i.e. bed and slopes with silt up to 5.0 cm as per direction of Engineer in Charge.
Uprooting jhunds including back filling and dressing as per direction of Engineer in Charge.
SON VIR (BID ID -5569996)
M/S RINKU CONTRACTOR (BID ID -5569950)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .