| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 175001 | ₹2.7 L | L1 | Accepted-AOC quoted rate |
| 2 | L2₹3.2 LRejected-Finance | ₹3.2 L | L2 | Rejected-Finance hair bidder |
| 3 | L3₹3.3 LRejected-Finance R O VILL CHEOG TEH THEOG DISTT SHIMLA | ₹3.3 L | L3 | Rejected-Finance hair bidder |
| 4 | L4₹3.5 LRejected-Finance UPPER KANGNA DHAR VERMA COTTAGE BELOW BCS SHIMLA 9 | ₹3.5 L | L4 | Rejected-Finance hair bidder |
| 5 | L5₹3.9 LRejected-Finance VERMA COTTAGE BELOW B C S NEW SHIMLA H P | ₹3.9 L | L5 | Rejected-Finance hair bidder |
| Sl No | Description | Qty | Unit | ashok kumar verma L4 | Surinder Singh Verma L10 | MANOHAR LAL VERMA L7 | Sahi Ram Malta L9 | BRIJ MOHAN SUMAN L2 | VINOD VERMA L5 | MADHU SHARMA L1 | ROHIT BEAKTA L8 | kirpa ram L6 | SUNEEL CHAUHAN L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in earth work and disposal of all excavated earth upto a lead of 20 metres and lift upto 1.50 metres, disposed earth to be levelled and neatly dressed complete in all respect as per direction and entire satisfaction of Engineer in charge. | 19.8 | Cum | 450 ₹8,910 | 650 ₹12,870 | 600 ₹11,880 | 700 ₹13,860 | 310 ₹6,138 | 375 ₹7,425 | 190 ₹3,762 | 658.9 ₹13,046.22 | 190 ₹3,762 | 10 ₹198 |
| 2.00 | Providing and laying cement concrete 1:5:10 (1cement: 5sand:10 graded stone agg. 40mm nominal size) with 15% plum concrete and curing complete excluding cost of form work in retaining wall/ breast wall, the size of plums shall usually be 150mm to 300mm as per HPPWD specifications within all leads and as per the direction of the Engineer-in-charge. | 48.63 | Cum | 6,210 ₹3.0 L | 13,000 ₹6.3 L | 8,000 ₹3.9 L | 12,000 ₹5.8 L | 5,800 ₹2.8 L | 7,200 ₹3.5 L | 4,800 ₹2.3 L | 10,144 ₹4.9 L | 7,500 ₹3.6 L | 6,500 ₹3.2 L |
| 3.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting, strutting and propping etc. with wooden, battens, and ballies, height of propping and centring below supporting floor to ceiling not exceeding 3 mtrs.and removal of the same for insitu reinforced concrete and plain concrete work in complete in all respect i/c all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | |||||||||||||
| 3.01 | Vertical surfaces such as walls (any thickness), partitions and the like including attached pillasters,buttresses, plinth and string courses and the like. | 71 | Sqmt. | 321 ₹22,791 | 650 ₹46,150 | 330 ₹23,430 | 460 ₹32,660 | 310 ₹22,010 | 350 ₹24,850 | 390 ₹27,690 | 478.3 ₹33,959.30 | 370 ₹26,270 | 10 ₹710 |
| 4.00 | Stone filling behind Retaining Walls complete in all respect as per the direction of the Engineer-in-charge. | 4.8 | Cum | 3,100 ₹14,880 | 7,000 ₹33,600 | 2,100 ₹10,080 | 3,000 ₹14,400 | 2,000 ₹9,600 | 2,000 ₹9,600 | 1,600 ₹7,680 | 2,971.8 ₹14,264.64 | 1,800 ₹8,640 | 2,000 ₹9,600 |
Tender Value
₹5.5 L
EMD Value
₹10,995
Closing Date
20 Mar 2026, 11:00 amClosed
AGM Bulk WSD SJPNL Us Club Shimla 171001
AGM Bulk WSD SJPNL Us Club Shimla 171001
Restoration Rain damages to LWSS Shimla City from Chair SH C O PCC R Wall for approach road of Chair Pumping Station
2026_SJPNL_131051_2
2038-2046 dated 10/03/2026
Open Tender
Civil Works
90 days
Shimla
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹10,995
6 May 2026
10 Mar 2026
20 Mar 2026
10 Mar 2026
20 Mar 2026
10 Mar 2026
10 Mar 2026 - 20 Mar 2026
Providing and laying cement concrete 1:5:10 (1cement: 5sand:10 graded stone agg. 40mm nominal size) with 15% plum concrete and curing complete excluding cost of form work in retaining wall/ breast wall, the size of plums shall usually be 150mm to 300mm as per HPPWD specifications within all leads and as per the direction of the Engineer-in-charge.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting, strutting and propping etc. with wooden, battens, and ballies, height of propping and centring below supporting floor to ceiling not exceeding 3 mtrs.and removal of the same for insitu reinforced concrete and plain concrete work in complete in all respect i/c all leads and lifts and to the entire satisfaction of the Engineer-in-charge.
Vertical surfaces such as walls (any thickness), partitions and the like including attached pillasters,buttresses, plinth and string courses and the like.
Stone filling behind Retaining Walls complete in all respect as per the direction of the Engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Tc.pdf
Tender Documents • 0.35 MB
From6.pdf
Tender Documents • 3.97 MB
From8.pdf
Tender Documents • 1.92 MB
Undertaking.pdf
Tender Documents • 0.04 MB
BOQ_193776.xls
BOQ • 0.27 MB
NIT.pdf
Tender Documents • 0.38 MB
Download all tender documents and submit your bid