| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.2 LAccepted-AOC 17E COLLECTOR OFFICE ROAD VENKATHESAPURAM SUNDAR NAGAR EXTENSION NEAR DIC PERAMBALUR 621 212 | PERAMBALUR | TAMIL NADU | 621212 | ₹44.2 L | L1 | Accepted-AOC Quoted L1 rate |
| 2 | L2₹44.9 LRejected-AOC | ₹44.9 L | L2 | Rejected-AOC Quoted L2 rate |
| Sl No | Description | Qty | Unit | TCB CONSTRUCTION L1 | Nallathambi S L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut | 1,966.95 | M2 | 6 ₹11,801.70 | 8 ₹15,735.60 |
| 2.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m KM 0/000 - 1/100 | 1,371.38 | M3 | 23 ₹31,541.63 | 25 ₹34,284.38 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out | 376.43 | M3 | 140 ₹52,700.20 | 145 ₹54,582.35 |
| 4.00 | Spreading the collected US gravel to watering and hand roller rolling including cost and supply of well Gravel from approved quarry and stacking to departmental gauge for premeasurements etc complete as per standard specifications and as directed by the d | 224.35 | M3 | 395 ₹88,618.25 | 400 ₹89,740 |
| 5.00 | KM 1/000-2/000 | 22.5 | M3 | 409 ₹9,202.50 | 415 ₹9,337.50 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2 | 517.12 | M3 | 2,509 ₹13.0 L | 2,550 ₹13.2 L |
| 7.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. KM 0/000 - 1/100 | 4,137 | M2 | 87 ₹3.6 L | 90 ₹3.7 L |
| 8.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all | 4,147.88 | M2 | 20 ₹82,957.60 | 21 ₹87,105.48 |
| 9.00 | BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggr | 124.43 | M3 | 11,524 ₹14.3 L | 11,650 ₹14.5 L |
| 10.00 | Provision for HM charges etc complete | 4 | No | 574 ₹2,296 | 600 ₹2,400 |
Tender Value
₹48.4 L
EMD Value
₹49,000
Closing Date
20 Feb 2026, 3:00 pmClosed
Project Director
DRDA Perambalur
Strengthening the road from Mettumaravanatham to Old Maravanatham road in Veppanthattai Block under NABARD RIDF 2026-27 in Perambalur District Package No.TN11-07
2026_RDTN_655888_7
DIPR/1016/Tender/2026 Dated 13.02.2026
Open Tender
Civil Works - Roads
180 days
Perambalur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹49,000
DRDA Perambalur
17 Mar 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
18 Feb 2026
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m KM 0/000 - 1/100
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out
Spreading the collected US gravel to watering and hand roller rolling including cost and supply of well Gravel from approved quarry and stacking to departmental gauge for premeasurements etc complete as per standard specifications and as directed by the d
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. KM 0/000 - 1/100
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggr
Provision for HM charges etc complete
KM Stone
Towards the charges for routline maintenance of the road work executed under NABARD 2026-27 including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.10 MB
TechBid7.pdf
Tender Documents • 1.11 MB
BOQ_786692.xls
BOQ • 0.24 MB
PriceBid7.pdf
Additional Documents • 0.70 MB
Download all tender documents and submit your bid