Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | -42.00% | ₹5.8 L | L1 | Admitted-Finance |
| 2 | L2₹5.9 LAdmitted-Finance | -41.41% | ₹5.9 L | L2 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
9 Jul 2026, 4:00 pmClosed
Executive Engineer S and D Division Ist
Suliman Complex Dalgate Sringar
Stage contract for various repair restoration of works within the jurisdiction of S and D Sub-Division Ist UEED Srinagar
2026_HAUDD_314395_3
Fresh e-NIT No.21 of 2026-27
Open Tender
Civil Works
Percentage
270 days
Sub Division Ist
As per NIT
2 documents required · 2 mandatory
₹1,200
Executive Engineer S and D Division Ist
₹20,000
14 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearance of sewer lines and manholes by way of removing silt, slush, solid, garbage, organic, inorganic material, dewatering and disposal with all carriages involved at site to dumping site as directed by Engineer-In-Charge (Complete Job) with all leads and lifts Shrinkage shall be deducted @10% per cum. | 881.8 | Cum | 450 | ₹3,96,810 |
| 2Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level | |||||
| 2.01 | 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 24.97 | Cum | 7,788.4 | ₹1,94,476.35 |
| 3Centering and shuttering incl. Strutting, propping etc and removal of form work for:- | |||||
| 3.01 | Edges of slabs and breaks in floors and walls (Above 20 cm wide) | 90.43 | Sqm | 1,145.1 | ₹1,03,551.39 |
| 4 | Reinforcement for RCC work incl. Straightening cutting, bending, placing in position and binding all complete (Thermo Mechanically Treated Bars). | 1,248.5 | Kg | 123.2 | ₹1,53,815.2 |
| 5 | Providing & Fixing of Polycrate Manholes covers & frame including all safe carriages upto site of work (Complete Job). | 50 | No | 2,750 | ₹1,37,500 |
| 6Carriage of Materials by Mechanical Transport from Source to site of work: - | |||||
| 6.01 | Stone Agg. Below 40mm from source Avg. 12kms. | 22.2 | Cum | 301.64 | ₹6,696.41 |
| 6.02 | Sand from source Avg. 20kms | 11.23 | Cum | 405.56 | ₹4,554.44 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.61 MB
BOQ_1017941.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].