Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.3 LAccepted-AOC VILL KISHTOPUR PO ISLAMPUR PS BARHARWA SAHIBGANJ JHARKHAND 816101 | KISHTOPUR | SAHIBGANJ | JHARKHAND | 816101 | ₹84.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹88.3 L+₹4.0 L (4.79%)Rejected-AOC DUMKA JHARKHAND | DUMKA | JHARKHAND | 814101 | ₹88.3 L+₹4.0 L (4.79%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical N A | NEW DELHI | DELHI | 110001 | - | - | Rejected-Technical Reject |
Tender Value
₹99.4 L
EMD Value
₹2 L
Closing Date
12 Mar 2026, 5:00 pmClosed
EXECUTIVE ENGINEER RDSD, PAKUR
EXECUTIVE ENGINEER RDSD, PAKUR
CONSTRUCTION OF SKILL DEVELOPMENT CENTRE AT VILL- RAJIPUR BLOCK- PAKUR DIST- PAKUR
2026_RDSPL_110622_1
RDSPL/PAKUR/09/RE/25-26_GR_01
Open Tender
Civil Works
Percentage
180 days
VILL- RAJIPUR BLOCK- PAKUR DIST- PAKUR
AS PER F2
3 documents required · 3 mandatory
₹10,000
₹2 L
Yes
7 Jul 2026
5 Mar 2026
14 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work excavation in foundation trenches in hard soil vide classification of soil item B and disposal of excavated earth as obtained to a distance up to 50 M all complete as per approved design building specification and direction of E/I. | 127.83 | M3 | 167.33 | ₹21,389.79 |
| 2 | Providing coarse clean sand filling in the foundation trenches including ramming and watering in layers not exceeding 150 mm thick with all lifts and leads including cost of material -do-all complete job as per specification and direction of E/I. | 146.37 | M3 | 589.51 | ₹86,286.58 |
| 3 | Providing designation 75 B brick Flat soling joints filled with local sand including cost of watering taxes royalty all complete job as per building specification and direction of E/I. | 439 | M2 | 330.34 | ₹1,45,019.26 |
| 4 | Providing P.C.C. M-150 With nominal mix of concrete (1:2:4) in foundation all complete job as per specification and direction of E/I. | 30.09 | M3 | 4,598.23 | ₹1,38,360.74 |
| 5 | Providing R.C.C. M-200 With nominal mix of concrete (1:1.5:3) for column construction with approved quality of stone chips and sand as above specification, all complete job as per specification and direction of E/I. | 56.21 | M3 | 6,082.45 | ₹3,41,894.51 |
| 6 | Providing designation 75 A Brick work with (1:6) cement mortar in the Foundation -do-all complete job as per specification and direction of E/I. | 24.56 | M3 | 5,439.85 | ₹1,33,602.72 |
| 7 | Providing D.P.C. 50 mm thick M-200 with nominal mix of concrete (1:2:4) all complete job as per specification and direction of E/I. | 37.19 | M2 | 278.35 | ₹10,351.84 |
| 8 | Providing designation 75 B Brick work with (1:6) cement mortar in the super structure -do-all complete job as per specification and direction of E/I. | 201.97 | M3 | 5,244.08 | ₹10,59,146.84 |
| 9 | Providing and fixing 100 mm diameter and 60 cm long rain water spout in cement mortar 1:4 (1 cement : 4 fine sand)stone ware spout. | 20 | No | 123.16 | ₹2,463.2 |
| 10 | Providing R.C.C. M-200 With nominal mix of concrete(1:1.5:3) in lintel construction with approved quality of coarse and fine aggregate including all complete job as per specification and direction of E/I. | 103.42 | M3 | 6,308.87 | ₹6,52,463.34 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
SBDRAJIPUR.pdf
Tender Documents • 1.37 MB
BOQ_149556.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .