| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 CrAccepted-AOC 2ND FLOOR PARNIL COMPLEX ZOO ROAD TINALI GUWAHATI 24 | KAMRUP METRO | ASSAM | 781024 | ₹10.0 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹10 CrRejected-AOC | ₹10 Cr | L2 | Rejected-AOC L2 Bidder |
| 3 | Not Admitted-Fee/PreQual/Technical 243 SURAVI PATH P O KAHILIPARA P S DISPUR | NAGAON | ASSAM | 782001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S DHANSIRI ASSOCIATES L1 | P.G. Construction L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000metres ,stacking serviceable materials and unserviceable materials separately.) | 20.34 | Cum | 950 ₹19,323 | 250 ₹5,085 |
| 2.00 | Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts & leads, transporting tosite, spreading, grading to required slope and compacted to meet requirement of table(300-2) ( including compensation of earth.) (a) ( Including cost of testing of materials at site and laboratory as directed by the deptt.) (i) From Private land . | 360 | Cum | 450 ₹1.6 L | 350 ₹1.3 L |
| 3.00 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,and compacting with vibratory roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.) for grading- II Material | 253.95 | Cum | 1,950 ₹5.0 L | 2,500 ₹6.3 L |
| 4.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with an initial lead of 5.0 km. ) By Mechanical Means: Using Screening Type-B (11.2mm Agg.) | 6.98 | Cum | 4,200 ₹29,316 | 2,800 ₹19,544 |
| 5.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage upto initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant) | 300 | Cum | 5,200 ₹15.6 L | 3,200 ₹9.6 L |
| 6.00 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) With bitumen emulsion-CSS-1 ( IS-8887-2004 ) | 1,200 | Cum | 25 ₹30,000 | 25 ₹30,000 |
| 7.00 | Tack Coat: Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. (Including cost of testing of materials at site and laboratory as directed by the deptt.)
With Bitumen emulsion CSS-1 (IS:8887-2004) Normal bituminous surface | 2,400 | Sqm | 15 ₹36,000 | 25 ₹60,000 |
| 8.00 | Dense Graded Bituminous Macadam: (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @4.0to4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT &H specification clause No. 507 complete in all respects) ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0Km initial lead from mixing plant ) (Including cost of testing of materials at site and laboratory as directed by the deptt.)
with 60/70 or VG-30 grade bitumen. for Grading II (19 mm nominal size) | 84 | Cum | 14,500 ₹12.2 L | 13,500 ₹11.3 L |
| 9.00 | Bituminous Concrete: (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @5.4 to 5.6 % of mix and filler, transporting the hot mix to worksite, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 509 complete in all respects) (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.)
with 60/70 or VG-30 grade bitumen. for Grading II (13 mm nominal size). | 36 | Cum | 14,500 ₹5.2 L | 13,500 ₹4.9 L |
| 10.00 | Inter locking concrete block pavement: Providing and laying of inter locking concrete block pavement (ICBP) with cement concrete paver blocks as per IS 15658-2006 of thickness 80mm and of specific 28 days compressive strength over a layer of bedding sand of compacted thickness 30mm, laid either in stretcher/ running/ herringbone pattern of bonds as directed by the engineer in charge and in proper level and grade and compacted with appropriate equipment such as plate vibrator along with spreading of a thin layer of joint filling sand to fill up the gaps between blocks including construction of edge restraint wherever required complete as per drawing and technical specification clause 1504 of MORD. | 93 | Sqm | 950 ₹88,350 | 1,250 ₹1.2 L |
Tender Value
₹10 Cr
EMD Value
₹20 L
Closing Date
10 Dec 2025, 2:00 pmClosed
CEO, GMDA
Bhangagarh, Guwahati-05
Flood Mitigation of Sarumotoria area through Channel Linkage to Silsako_Retention Pond Storm water connector drain Sarumotoria to Silsako Beel including pumping station with sump
2025_GMDA_48724_1
GMDA/DEV/06/2025/Pt/15
Open Tender
Civil Works
90 days
Guwahati
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹20 L
Yes
Office of CEO, GMDA
21 Jan 2026
19 Nov 2025
10 Dec 2025
19 Nov 2025
10 Dec 2025
27 Nov 2025
20 Nov 2025 - 25 Nov 2025
25 Nov 2025
Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000metres ,stacking serviceable materials and unserviceable materials separately.)
Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts & leads, transporting tosite, spreading, grading to required slope and compacted to meet requirement of table(300-2) ( including compensation of earth.) (a) ( Including cost of testing of materials at site and laboratory as directed by the deptt.) (i) From Private land .
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,and compacting with vibratory roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.) for grading- II Material
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with an initial lead of 5.0 km. ) By Mechanical Means: Using Screening Type-B (11.2mm Agg.)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage upto initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant)
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) With bitumen emulsion-CSS-1 ( IS-8887-2004 )
Tack Coat: Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. (Including cost of testing of materials at site and laboratory as directed by the deptt.) With Bitumen emulsion CSS-1 (IS:8887-2004) Normal bituminous surface
Dense Graded Bituminous Macadam: (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @4.0to4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT &H specification clause No. 507 complete in all respects) ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0Km initial lead from mixing plant ) (Including cost of testing of materials at site and laboratory as directed by the deptt.) with 60/70 or VG-30 grade bitumen. for Grading II (19 mm nominal size)
Bituminous Concrete: (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @5.4 to 5.6 % of mix and filler, transporting the hot mix to worksite, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 509 complete in all respects) (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) with 60/70 or VG-30 grade bitumen. for Grading II (13 mm nominal size).
Inter locking concrete block pavement: Providing and laying of inter locking concrete block pavement (ICBP) with cement concrete paver blocks as per IS 15658-2006 of thickness 80mm and of specific 28 days compressive strength over a layer of bedding sand of compacted thickness 30mm, laid either in stretcher/ running/ herringbone pattern of bonds as directed by the engineer in charge and in proper level and grade and compacted with appropriate equipment such as plate vibrator along with spreading of a thin layer of joint filling sand to fill up the gaps between blocks including construction of edge restraint wherever required complete as per drawing and technical specification clause 1504 of MORD.
Protection for outlet pipe
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes,in accordance with requirements of lines, grades and cross sections,loading and disposal of cut road with in all lifts and leads upto 1000 metres)
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,and compacting with vibratory roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.) for grading- II Material
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 80x1.25 mm M.S. laths with 1.25 mm thick top cover
Providing and fixing ball bearing for rolling shutters.
Extra for providing mechanical device chain and crank operation for operating rolling shutters. Exceeding 16.80 sqm in area
Construction of RCC Open Drain Overall Size (3.0x3.5)M
Construction of RCC Covered Drain Overall Size (2.4x3.7)M with precast manhole cover
Construction of RCC Covered Drain Overall Size (2.6x3.7)M with precast manhole cover
Construction of RCC Covered Drain Overall Size (2.7x3.7)M with precast manhole cover
Construction of RCC Covered Drain Overall Size (2.8x3.7)M with precast manhole cover
Construction of RCC Covered Drain Overall Size (3.0x3.7)M with precast manhole cover
Construction of RCC Cattle Trap Culvert with ISMB & ISMC Cover Clear Size (2.0x3.4)M
Construction of RCC Pump House
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.
Carriage of Earth by mechanical transport icluding Loading,unloading and stacking upto 5 km
Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Centering and shuttering including strutting, propping etc. and removal of form for
Centering and shuttering including strutting, propping etc. and removal of form for 5.9.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc
Centering and shuttering including strutting, propping etc. and removal of form for 5.9.3 Suspended floors, roofs, landings, balconies and access platform
Centering and shuttering including strutting, propping etc. and removal of form for 5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for 5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 100 mm nominal dia Pipes
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet was
hers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.63 mm thick with zinc coating not less than 275 gm/ m²
Sheet Pile Work: Wrought Iron & Mild Steel Welded Work (Wrought Iron & Mild Steel Welded Work using ISMB300, ISMC150, (2.4x1.2x0.008)M MS Sheet including Mechanical Lifting, Installation, Removal, Drilling of the sections on Loose Soil Upto 2m Depth)
Construction of Brick Masonary Wall (Boundary Wall)
Construction of Property Gate
KBL make mixed flow pump discharge 1000 lps, head : 10 mtr with 132kw/10pole motor along with the accessories.
KBL make valve ( 700 mm_PN 1.0_ CI MDNRV IS 5312-1)
KBL make valve ( 700 mm_PN 10_ CI DF SE BFV BSEN 593)
KBL make valve ( 450 mm_PN 10_ CI NRV)
KBL make valve ( 450 mm_PN 10_ CI BFV_gear operated_Wafer end centric)
KBL make 5hp vacuum pump motor set
KBL make 10hp vacuum pump motor set
KBL make valve ( 100 mm Rising sluice valve CI_PN 1.0)
Installation charges for 1 nos pump sets ( if any extra material is required, it will be in your scope)
Supply of "KRISHNA" make 10 ton cap.double girder EOT crane
Erection and commissioning of 10 ton double girder EOT crane
Transportation of 10 ton double girder EOT crane
MS pipe ISI marked spiral welded as per IS3589 with black varnish coating.
700mm dia 10mm thk
800mm dia 10mm thk
450mm dia 10mm thk
500mm dia 10mm thk
150 sq mm 4 core aluminum armored cable
Transformer Panel with a powder-coated finish MCCB 800 Amp, 55KA (make L&T or Siemens)
Powder-coated main panels 10-pole stators
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
DTN_Sarumotoria.pdf
Tender Documents • 1.49 MB
LoB.pdf
Additional Documents • 0.38 MB
BOQ_77410.xls
BOQ • 0.38 MB