| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 CrAccepted-AOC | ₹8.0 Cr | L1 | Accepted-AOC Being Lowest Bidder and reasonable bid |
| 2 | L2₹9.4 Cr+₹1.4 Cr (17.8%)Rejected-Finance | ₹9.4 Cr+₹1.4 Cr (17.8%) | L2 | Rejected-Finance Other than lowest bidder |
| 3 | L3₹11.5 Cr+₹3.5 Cr (44.5%)Rejected-Finance HOUSE NO 769 SOUTH CIVIL LINES MUZAFFARNAGAR UP 241001 | HARDOI | UTTAR PRADESH | 241001 | ₹11.5 Cr+₹3.5 Cr (44.5%) | L3 | Rejected-Finance Other than lowest bidder |
| 4 | L4₹12.0 Cr+₹4.0 Cr (50.0%)Rejected-Finance B 604 VASUNDHRA APARTMENTS PLOT NO 16 SECTOR 6 DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | ₹12.0 Cr+₹4.0 Cr (50.0%) | L4 | Rejected-Finance Other than lowest bidder |
| 5 | L5₹13.4 Cr+₹5.4 Cr (68.0%)Rejected-Finance | ₹13.4 Cr+₹5.4 Cr (68.0%) | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | Raja enterprises L1 | Pooja Singla Builders And Engineers Pvt Ltd L4 | AMIT ASSOCIATES L5 | M/s Arihant Builders L3 | M/s Khialdas Constructions L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Note:-Please refer schedule 'A' notes before quoting the tender. | ||||||||
| 2.00GENERAL SUMMARY | ||||||||
| 3.00Sch 'A' Part - I (Building Works based on design and build concept) | ||||||||
| 3.01 | Design and M&L for construction of Pre-engineered building for block of classroom (Double Storey) including car and scooter parking for agniveers at location specified on site plan and as per parameters / specification provided in DBR & Particular Specification (PS)
Note:
(i) The complete design of the bldgs mentioned under Sch ‘A’ Part-I shall be carried out and the design and drawings shall got vetted from any IIT & also refer scope of work mentioned in Sch 'A' Notes and details of scope under Phase-I, Phase-II and Phase- III. Contractor shall also submit detailed estimate alongwith yard stick for approval by CWE as per Annex 'B' to Sch 'A' Notes and shall be deemed to include in quoted lump sum. | 1 | Each Job | 7,54,00,000 ₹7,54,00,000 Lowest | 11,50,00,000 ₹11,50,00,000 | 12,94,00,000 ₹12,94,00,000 | 11,10,00,000 ₹11,10,00,000 | 8,95,50,000 ₹8,95,50,000 |
| 3.02 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,87,000 ₹1,87,000 | 1,33,831.49 ₹1,33,831.49 | 1,65,000 ₹1,65,000 | 1,26,661.94 ₹1,26,661.94 Lowest | 1,44,000 ₹1,44,000 |
| 3.03 | Lump sum price worked out by the contractor for EXTERNAL ELETRIC SUPPLY WORKS as listed in Schedule ‘A’ Part-III (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,26,700 ₹1,26,700 Lowest | 1,56,636.13 ₹1,56,636.13 | 1,68,000 ₹1,68,000 | 1,45,033.45 ₹1,45,033.45 | 1,44,000 ₹1,44,000 |
| 3.04 | Lump sum price worked out by the contractor for ROAD, PATH, CULVERTS AND HARDSTANDING WORKS as listed in Schedule ‘A’ Part- IV (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 11,50,000 ₹11,50,000 Lowest | 15,56,510.67 ₹15,56,510.67 | 12,99,315.9 ₹12,99,315.9 | 12,00,000 ₹12,00,000 | 13,50,000 ₹13,50,000 |
| 3.05 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS as listed in Schedule ‘A’ Part-V (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 8,80,000 ₹8,80,000 | 7,73,647.77 ₹7,73,647.77 Lowest | 9,73,647.77 ₹9,73,647.77 | 8,51,012.55 ₹8,51,012.55 | 8,10,000 ₹8,10,000 |
| 3.06 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in Schedule ‘A’ Part-VI (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 2,50,000 ₹2,50,000 | 1,80,305.1 ₹1,80,305.1 | 1,66,782.22 ₹1,66,782.22 Lowest | 2,00,000 ₹2,00,000 | 2,70,000 ₹2,70,000 |
| 3.07 | Lump sum price worked out by the contractor for EXCAVATION, EARTH WORK AND SITE DEVELOPMENT WORKS as listed in Schedule ‘A’ Part-VII (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 8,80,000 ₹8,80,000 | 8,46,012.58 ₹8,46,012.58 | 9,99,235.48 ₹9,99,235.48 | 7,52,011.18 ₹7,52,011.18 Lowest | 9,00,000 ₹9,00,000 |
Tender Value
₹12.0 Cr
EMD Value
₹9.3 L
Closing Date
12 Nov 2025, 6:00 pmClosed
Chief Engineer Bhopal Zone
HQ, Chief Engineer, Bhopal Zone, Military Engineer Services, Bhopal-462001
PROVISION OF CLASSROOM FOR AGNIVEERS WITH INTEGRATED TOILET AT AGNIVEER TRAINING AREA UNDER GE DRONACHAL
2025_MES_734251_1
CEBZ/BPL/TOKEN/06 OF 2025-26
Open Tender
Civil Works
Lump-sum
750 days
Bhopal
As per NIT documents
6 documents required · 6 mandatory
₹3,000
GE Dronachal
₹9.3 L
Bhopal
9 Jun 2026
8 Oct 2025
14 Nov 2025
8 Oct 2025
12 Nov 2025
5 Nov 2025
24 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2GENERAL SUMMARY | |||||
| 3Sch 'A' Part - I (Building Works based on design and build concept) | |||||
| 3.01 | Design and M&L for construction of Pre-engineered building for block of classroom (Double Storey) for agniveers at location specified on site plan and as per parameters / specification provided in DBR & Particular Specification (PS)
Note:
(i) The complete design of the bldgs mentioned under Sch ‘A’ Part-I shall be carried out and the design and drawings shall got vetted from any IIT & also refer scope of work mentioned in Sch 'A' Notes and details of scope under Phase-I, Phase-II and Phase- III. Contractor shall also submit detailed estimate alongwith yard stick for approval by CWE as per Annex 'B' to Sch 'A' Notes and shall be deemed to include in quoted lump sum. | 1 | Each Job | - | - |
| 3.02 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 95,593.92 | ₹95,593.92 |
| 3.03 | Lump sum price worked out by the contractor for EXTERNAL ELETRIC SUPPLY WORKS as listed in Schedule ‘A’ Part-III (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,16,026.76 | ₹1,16,026.76 |
| 3.04 | Lump sum price worked out by the contractor for ROAD, PATH, CULVERTS AND HARDSTANDING WORKS as listed in Schedule ‘A’ Part- IV (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 11,97,315.9 | ₹11,97,315.9 |
| 3.05 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS as listed in Schedule ‘A’ Part-V (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 7,73,647.77 | ₹7,73,647.77 |
| 3.06 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in Schedule ‘A’ Part-VI (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,85,555.1 | ₹1,85,555.1 |
| 3.07 | Lump sum price worked out by the contractor for EXCAVATION, EARTH WORK AND SITE DEVELOPMENT WORKS as listed in Schedule ‘A’ Part-VII (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 9,40,013.98 | ₹9,40,013.98 |
| 4SCH 'A' Pt - VIII (MISCELLANEOUS ITEMS) | |||||
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_822175.xls
BOQ • 0.73 MB
tender.pdf
Tender Documents • 20.08 MB
drgs.pdf
Tender Documents • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .