Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | ₹4.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.8 LRejected-AOC | ₹4.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SenthooranP L2 | R SHEIK BEER MOHAMED L1 |
|---|---|---|---|---|---|
| 1.01 | Dismantling the existing for cement concrete road surface the debris clearing away from the site etc.complete..,(VOL -I Pg.No-28) | 7 | m3 | 512.9 ₹3,590.30 | 485.7 ₹3,399.90 |
| 2.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp. | 29 | m3 | 273.1 ₹7,919.90 | 258.6 ₹7,499.40 |
| 3.01 | Supplying and filling in foundation and basement with M sand in layers of 15cm thick well rammed and consolidated including watering complying etc, complete. | 4 | m3 | 1,715.4 ₹6,861.60 | 1,624.4 ₹6,497.60 |
| 4.01 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 4 | m3 | 5,987.4 ₹23,949.60 | 5,669.9 ₹22,679.60 |
| 5.01 | Supplying and erecting shuttering with necessary supports for plinth beam with all cross bracings etc com;(R.C.C. Column)footing plinth beam and lintel sides using steel plates and angles | 65 | m2 | 1,185.9 ₹77,083.50 | 1,123 ₹72,995 |
| 6.01 | Plain Cement concrete 1:2:4 (One Cement two sand and four aggregates) using 20mm machine broken gauge bard granite jelly for foundation including consolidation dewatering for foundation wherever necessary etc, complete | 19 | m3 | 7,436.1 ₹1.4 L | 7,041.8 ₹1.3 L |
| 7.01 | Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). | 7 | qutl | 9,902.7 ₹69,318.90 | 9,377.6 ₹65,643.20 |
| 8.01 | Reinforced Cement oncrete 1:1.1/2:3.(one cement one nad half sand and three aggregate) using 20mm machine broken gauge granite chipsfor reinforced cement concrete. | 7 | m3 | 9,978 ₹69,846 | 9,448.9 ₹66,142.30 |
| 9.01 | Plastering with cement mortar 1:3, 20mm, thick in all floors including cost and conveyance of all materilas to site andl abour charges etc, complete as per standard specifications (S.I.306) (Cor Building Data P.No-45) | 14 | m2 | 652.8 ₹9,139.20 | 618.2 ₹8,654.80 |
| 10.01 | Add GST 18% | 1 | GST | 73,618.2 ₹73,618.20 | 69,714.2 ₹69,714.20 |
Tender Value
₹4.6 L
EMD Value
₹4,575
Closing Date
22 Jul 2025, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai, Thallakulam, Madurai.
Construction of Road cross culvert at various places in kulamangalam main Road in ward no 25
2025_MAWS_580474_1
E3/EST- 458/ 25-26
Open Tender
Civil Works
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,575
9 Jan 2026
14 Jul 2025
22 Jul 2025
14 Jul 2025
22 Jul 2025
14 Jul 2025
Amount
Dismantling the existing for cement concrete road surface the debris clearing away from the site etc.complete..,(VOL -I Pg.No-28)
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.
Supplying and filling in foundation and basement with M sand in layers of 15cm thick well rammed and consolidated including watering complying etc, complete.
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Supplying and erecting shuttering with necessary supports for plinth beam with all cross bracings etc com;(R.C.C. Column)footing plinth beam and lintel sides using steel plates and angles
Plain Cement concrete 1:2:4 (One Cement two sand and four aggregates) using 20mm machine broken gauge bard granite jelly for foundation including consolidation dewatering for foundation wherever necessary etc, complete
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also).
Reinforced Cement oncrete 1:1.1/2:3.(one cement one nad half sand and three aggregate) using 20mm machine broken gauge granite chipsfor reinforced cement concrete.
Plastering with cement mortar 1:3, 20mm, thick in all floors including cost and conveyance of all materilas to site andl abour charges etc, complete as per standard specifications (S.I.306) (Cor Building Data P.No-45)
Add GST 18%
SenthooranP (BID ID -1407361)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid