| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC H NO 344 HARGOBIND COLONY BAHADURGARH DISTT PATIALA | BAHADURGARH | PATIALA | ₹1.5 Cr | L1 | Accepted-AOC Lowest rates |
| 2 | L2₹1.6 Cr+₹12.2 L (8.08%)Rejected-AOC | ₹1.6 Cr+₹12.2 L (8.08%) | L2 | Rejected-AOC High rates |
| 3 | L3₹1.7 Cr+₹16.8 L (11.1%)Rejected-AOC 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | ₹1.7 Cr+₹16.8 L (11.1%) | L3 | Rejected-AOC High rates |
Tender Value
Refer Docs
EMD Value
₹3.1 L
Closing Date
30 Sept 2024, 9:30 amClosed
Executive Engineer Lehal Canal Division Patiala
Executive Engineer Lehal Canal Division WRD Punjab Patiala
Estimate for Relining of Bhagwanpura Disty. Sysytem (Concrete Lining M-15) With percent enhanced capacity from RD 0-87980 offtaking at RD 90200/R 2nd Patiala Feeder (Minor No 1 RD 0-19245)
2024_WR_126396_1
08 dated 30.08.2024
Open Tender
Civil Works - Canal
Item Rate
60 days
Sangrur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Yes
₹3.1 L
Yes
Lehal Canal Division WRD Punjab Patiala
28 Oct 2024
30 Aug 2024
30 Sept 2024
30 Aug 2024
30 Sept 2024
30 Aug 2024
12 Sept 2024
Amount
Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge upto 9cum/s including boundary road :-
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m.
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads Disposal/carraige from 0 upto 450m
(a) 450m upto 1Km (pacca)
(b) 450m upto 1Km (katcha)
(d) 1 km to 10 km ( pacca)
(e) 1 km to 10 km ( katcha)
Extra for laying earth as per specification for compaction in 20 Cm. layers and dressing including the cost of rolling and watering as per P.W.D specifications.
Earth work for lip cutting for lining of irrigation channels inclusive of all allowance leads and dressing( as per earth work statement) (a) 0-1.5mt. depth
Dressing of Earth work ( NEW )
Dismantling of old lining and brick work in cement sand mortar.
Dressing and preparation of sub grade for side slopes.
Providing and laying Cement concrete (M-15) sleepers in bed and side slopes below the joints of concrete lining mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply carriage, loading & unloading of material complete in all respect as per design/drawing and PWD specifications
Laying 1:3 (cement: water) cement slurry with cement @ 2.25 kg per sqmt on prepared bed & side slope before laying concrete
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)
Providing and laying Cement concrete (M-15) for coping mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply ,carriage, loading & unloading of material complete in all respect as per design/drawing and PWD specifications
Filling of construction joints sealing compound including supply carriage, of material complete in all respect as per design/drawing and PWD specifications
Filling expansion joints with special impervious hot pour 12.5 mm wide including supply ,carriage, of material complete in all respect as per design/drawing and PWD specifications
Providing and laying LDEP 150 micron over sleeper on construction joints and expansion joints complete in all respect as per design/drawing and PWD specifications
Shuttering for faces of concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications
Extra for Bitumen Painting @ 0.69 kg per Sqmt.
Dag Belling single kassi stroke minimum 7.5 cm. depth complete in all respect as per design/drawing and PWD specifications
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M25 Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M20 With Batching Plant, Transit Mixer and Concrete Pump
Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and Technical Specifications.
Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.
First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete
Earth work for outlet:- Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling , consolidation and dressing ) With H upto 0.5 m
Dismantling outlets including removal of dismantled material involving lead upto 100 metres. ( (c )) Dismantling O.F., A.P.M. Or O.S.M. type outlets involving dismantling cement masonry and removing of precast R.C. Slab ((i)) With H upto 0.5 m
Adjusting A.P.M. to the correct Y and fixing in position:- In case of new outlet where no dismantling and reconstructing of gullet wall is involved. Extra labour for dressing bricks On O.F. and A.P.M. type outlets
Extra labour for dressing bricks On O.F. and A.P.M. type outlets ((i)) With H upto 0.5 m
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.
Cement concrete 1:3:6 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type
TITHARTH CONSTRUCTION PRIVATE LIMITED
M/S SANJEEV KUMAR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .