Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 363 39KA HASSANGANJ BAWLI KUMAR COMPANY 363 39 KA HASAN GANJ BAWLI SAADAT GANJ LUCKNOW SAADATGANJ | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹27.1 L
EMD Value
₹27,100
Closing Date
29 Jun 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE GCC II ,Alandur,Chennai -16
Superintending Engineer,GCC II,230 KV CMRL GIS SS,Alandur,chennai-16
AS per NIT
2022_EB_236695_2
OT-10/22-23 of SE/GCC-II/CNI
Open Tender
Civil Works
Works
120 days
Mambakkam ss
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹27,100
Yes
14 Jul 2022
21 Jun 2022
30 Jun 2022
21 Jun 2022
29 Jun 2022
21 Jun 2022
60 days
Amount
Supplying, transport and erection of "H" type towers, booms and all other lattice structure including cost of all materials for G.I angles, hot tip galvanising, all labour, lead, lift, etc., complete.
Supplying and transport of various size of ISI GI Bolt&Nut and washer as per IS standards and approved by competent authority before erection as per the requirement to site including cost of material lead lift labour etc., complete.
Labour charges for erection of lattice towers, booms including cost of all materials for G.I angles, hot tip galvanising, all labour, lead, lift, etc. complete.
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.
Supplying and filling M sand for foundation and basement including watering and consolidation in 15 cm layers including cost of sand all labour lead lift etc., complete.
Plain cement concrete 1:3:6 using 12 to 20mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc., complete.
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For raft concrete.
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Retaining wall, cable duct side walls etc.,complete.
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete.
Supplying and spreading of well gravel for low lying area including cost of well gravel, labour for consolidation, lead, lift, etc. complete.
Plastering with cm 1:3, 12mm thick for ceiling, beams, sunshade including cost of cement, all materials,curing, labour, lead and lift etc., complete.
Supplying & fixing of partly glazed & partly panelled "DOOR of size 1200mm X 2100mm(H)", fabricated out of 2 1/2' X 1 1/2' aluminium extrustion section with powder coated finish using prelaminated particle board & plain glass with lock & key arrangement, hydraulic door closer, door handle, etc., including cost of all materials required, lead, lift, labour, etc., completeand as instructed by the Executive Engineer at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
V.JOTHIKUMARAVEL
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .