| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.3 LAdmitted-Finance | ₹71.3 L | L1 | Admitted-Finance |
| 2 | L2₹75.2 L+₹3.9 L (5.42%)Admitted-Finance | ₹75.2 L+₹3.9 L (5.42%) | L2 | Admitted-Finance |
| 3 | L3₹77.9 L+₹6.6 L (9.26%)Admitted-Finance | ₹77.9 L+₹6.6 L (9.26%) | L3 | Admitted-Finance |
| 4 | L4₹83.4 L+₹12.1 L (17.0%)Admitted-Finance 455A KR BALACHANDRAN ROAD THIRUVANKULAM ERNAKULAM KERALA 682305 | ERNAKULAM | KERALA | 682305 | ₹83.4 L+₹12.1 L (17.0%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | G. S. ENGINEERING WORKS L2 | DEEPAK ENGINEERING WORKS L4 | SAINI INDUSTRIAL ENGG. WORK L1 | JITENDRA ENGINEERING WORKS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of steel structure such as platforms, support railing, hoppers, chutes, ducts, dismantling of mech. Equipments and elect. Equipments/ assemblies including rubber lined pipe line at different level of underground mine | 160 | Metric Ton | 14,24,000 ₹16,80,320 | 15,20,000 ₹17,93,600 | 13,08,800 ₹15,44,384 Lowest | 13,68,000 ₹16,14,240 |
| 2.00 | Fabrication of steel structures such as platforms, tanks, hoppers, cells, ducts, chutes, chimney, towers supports, bend etc. including fixing of rubber lining with bolt at different level of underground mine | 120 | Metric Ton | 17,40,000 ₹20,53,200 Lowest | 20,40,000 ₹24,07,200 | 17,52,600 ₹20,68,068 | 20,02,200 ₹23,62,596 |
| 3.00 | Erection of fabricated items as in sl no. 2 and also equipments, sub assemblies, motors, pumps etc. at different level of underground mine. | 160 | Metric Ton | 14,40,000 ₹16,99,200 | 15,20,000 ₹17,93,600 | 13,08,800 ₹15,44,384 Lowest | 13,74,400 ₹16,21,792 |
| 4.00 | DISMANTLING OF 6 DIA MS PIPE LINE FROM 240 ML AND SHIFTING TO O ML IN KHETRI UNDERGROUND MINE (LOWERING FROM 240 ML TO 0 ML AT SERVICE SHAFT SHALL BE DONE BY COMPANY) | 10 | Metric Ton | 55,000 ₹64,900 Lowest | 64,000 ₹75,520 | 55,000 ₹64,900 Lowest | 58,000 ₹68,440 |
| 5.00 | LAYING OF 10” DIA PIPE LINE AT 0 ML WITH FLANGED JOINTS, INCLUDING FABRICATION OF BEND, FLANGES, DUMMIES ETC AFTER SHIFTING FROM 60 & 120 ML AT VARIOUS PLACES IN KHETRI UNDERGROUND MINE | 180 | METRE | 1,53,000 ₹1,80,540 | 1,71,000 ₹2,01,780 | 1,47,780 ₹1,74,380.4 Lowest | 1,80,000 ₹2,12,400 |
| 6.00 | LAYING OF 6” DIA PIPES LINE AT 0 ML WITH FLANGED JOINTS , INCLUDING FABRICATION OF BEND, FLANGES, DUMMIES ETC. AFTER SHIFTING FROM SURFACE TO 0 ML IN KHETRI UNDERGROUND MINE | 1,400 | METRE | 9,03,000 ₹10,65,540 | 10,50,000 ₹12,39,000 | 8,69,400 ₹10,25,892 Lowest | 9,80,000 ₹11,56,400 |
| 7.00 | LAYING OF 8” DIA PIPES WITH FLANGED JOINTS , INCLUDING FABRICATION OF BEND, FLANGES, DUMMIES ETC. AT 180ML IN KHETRI UNDERGROUND MINE. | 800 | METRE | 6,56,000 ₹7,74,080 | 7,04,000 ₹8,30,720 | 6,00,800 ₹7,08,944 Lowest | 6,40,000 ₹7,55,200 |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
23 Mar 2023, 2:30 pmClosed
S Sarkar
AGM(Elect.), Contract Cell, HCL-KCC, Mob. 9413367377
As per NIT
2023_HCL_147443_1
RFQ10223 Two years contract for Dis. Fab. Erec.
Open Tender
Machineries/ Mechanical Engg Items
Fixed-rate
731 days
HCL-KCC
As per NIT
6 documents required · 6 mandatory
₹0
₹1.0 L
Yes
25 Apr 2023
2 Mar 2023
24 Mar 2023
2 Mar 2023
23 Mar 2023
2 Mar 2023
2 Mar 2023 - 23 Mar 2023
Dismantling of steel structure such as platforms, support railing, hoppers, chutes, ducts, dismantling of mech. Equipments and elect. Equipments/ assemblies including rubber lined pipe line at different level of underground mine
Fabrication of steel structures such as platforms, tanks, hoppers, cells, ducts, chutes, chimney, towers supports, bend etc. including fixing of rubber lining with bolt at different level of underground mine
Erection of fabricated items as in sl no. 2 and also equipments, sub assemblies, motors, pumps etc. at different level of underground mine.
DISMANTLING OF 6 DIA MS PIPE LINE FROM 240 ML AND SHIFTING TO O ML IN KHETRI UNDERGROUND MINE (LOWERING FROM 240 ML TO 0 ML AT SERVICE SHAFT SHALL BE DONE BY COMPANY)
LAYING OF 10” DIA PIPE LINE AT 0 ML WITH FLANGED JOINTS, INCLUDING FABRICATION OF BEND, FLANGES, DUMMIES ETC AFTER SHIFTING FROM 60 & 120 ML AT VARIOUS PLACES IN KHETRI UNDERGROUND MINE
LAYING OF 6” DIA PIPES LINE AT 0 ML WITH FLANGED JOINTS , INCLUDING FABRICATION OF BEND, FLANGES, DUMMIES ETC. AFTER SHIFTING FROM SURFACE TO 0 ML IN KHETRI UNDERGROUND MINE
LAYING OF 8” DIA PIPES WITH FLANGED JOINTS , INCLUDING FABRICATION OF BEND, FLANGES, DUMMIES ETC. AT 180ML IN KHETRI UNDERGROUND MINE.
G. S. ENGINEERING WORKS
JITENDRA ENGINEERING WORKS
DEEPAK ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .