Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.8 CrAccepted-AOC MORENA | MORENA | MADHYA PRADESH | 476001 | ₹2.8 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹2.9 Cr+₹12.2 L (4.33%)Rejected-Finance | ₹2.9 Cr+₹12.2 L (4.33%) | 2 | Rejected-Finance RATE HIGH |
| 3 | 3₹3.1 Cr+₹23.2 L (8.22%)Rejected-Finance | ₹3.1 Cr+₹23.2 L (8.22%) | 3 | Rejected-Finance RATE HIGH |
Tender Value
₹3.2 Cr
EMD Value
₹3.2 L
Closing Date
1 Mar 2023, 5:30 pmClosed
PHED BHIND
EE PHED BHIND
Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village 1 NORASAI 2 DHORKHA 3 TIKARI KALAN 4 BAGHORA 5 MUSTARA 6 TIKARI KHURD 7 BAHARPURA Block MEHGAON Distt. BHIND based on Tube
2023_PHED_252182_1
NIT No 122/ Procell/EE/ PHED/2023/BHIND
Open Tender
Civil Works - Water Works
Percentage
270 days
MEHGAON
AS PER NIT
8 documents required · 8 mandatory
₹15,000
₹3.2 L
28 Jul 2023
16 Feb 2023
3 Mar 2023
16 Feb 2023
1 Mar 2023
16 Feb 2023
eProcurement System Government of Madhya Pradesh Created By: Ramkumar Singh Rajpoot Created Date/Time: 27-Mar-2023 03:47 PM Tender Title: PIPE LINE WORK Tender ID: 2023_PHED_252182_1
Tender Inviting Authority: EE PHED BHIND
Name of Work:Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village – 1 NORASAI 2 DHORKHA 3 TIKARI KALAN 4 BAGHORA 5 MUSTARA 6 TIKARI KHURD 7 BAHARPURA Block – MEHGAON Distt. BHIND based on Tube.Well including installation of electric submersible motor pump, construction of R.C.C Sump well cum pump house, construction of R.C.C. Over Head Tenk, laying & jointing of rising main and distribution pipe line system, household tap connections, and electric power connections including cost of material & labour with 90 Days Trial Run After Completion of work And Commissioning of scheme.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 M/s Bhagwati Enterprises(GSTN-23AAPFM3354A2ZL) 31773000.00 -11.17 28223955.90 Two Crore Eighty Two Lakh Twenty Three Thousand Nine Hundred and Fifty Five
2.00 KESHAV KRUPA CONSTRUCTION PVT LTD.(GSTN-NA) 31773000.00 -3.87 30543384.90 Three Crore Five Lakh Fourty Three Thousand Three Hundred and Eighty Four
3.00 AMAR SINGH BAGHEL CONTRACTOR(GSTN-NA) 31773000.00 -7.32 29447216.40 Two Crore Ninty Four Lakh Fourty Seven Thousand Two Hundred and Sixteen
Lowest Amount Quoted BY: M/s Bhagwati Enterprises(28223955.90)
BOQ Summary Details Tender Title: PIPE LINE WORK Tender ID: 2023_PHED_252182_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 M/s Bhagwati Enterprises 28223955.90 L1
2 AMAR SINGH BAGHEL CONTRACTOR 29447216.40 L2
3 KESHAV KRUPA CONSTRUCTION PVT LTD. 30543384.90 L3
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .