Tender Value
₹12.1 L
EMD Value
₹15,500
Closing Date
9 Mar 2026, 9:30 pmClosed
Public Works Department
EXECUTIVE ENGINEER
Construction of CC Road and CC Drain SC Colony of Devihosur village in Haveri taluk of Byadgi constituency (RESERVED FOR ST CATEGORY)
PWD/2025-26/RD/WORK_INDENT34062
PWD/2025-26/RD/WORK_INDENT34062
Reserved
Roads
Electronic Documents, First(One Cover)
PWD Division Office Haveri
8 documents required · 8 mandatory
₹500
₹15,500
9 Mar 2026
2 Mar 2026
7 Mar 2026
Construction of C.C raod and C.C drain S.C Colony of Devihosur village in haveri taluk of Byadgi constituency.
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 150...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Concrete Works - Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm in concrete slab using concrete cutting machine with diamond studded saw within 4-8 hours of casting of bay...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Percentage Additionalities for Formwork,Centering & Scaffolding : Formwork for drain walls is considered @ 35% of the rate of the concrete per m3 (V-I P.No.111,Addendum I- 4 ---- including equipments ...
Add 5% Appendix I Additionalities for Formwork of Percentage on fnished rate on basic rate of concrete per m3 (Volume : 1 Page : 112 SI.No : 15) ---- including equipments and all other incidental char...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW 1 INo34062-ST.doc
Tender Document • 0.24 MB
Tender Notification.pdf
Others - Tender Notification • 2.13 MB
LOC Format Letter.pdf
Others - LOC Format • 1.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .