| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.7 LAccepted-AOC | 1 | Accepted-AOC Lowest Amount Quoted | |
| 2 | 2₹27.0 L+₹24,046 (0.90%)Rejected-Finance | 2 | Rejected-Finance highest Amount Quoted |
| Sl No | Description | Qty | Unit | D RAJKUMAR L1 | R.SURESH KUMAR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Name of the Work : 1.Construction of drain with culvert at K.Vadamudurai Main road to Kamalesh Kalyana Mandapam H/O Kurudampalayam Panchayat in Periyanaickenpalayam Block in Coimbatore Dist under panchayat G Fund 2025-26 | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 340.2 | Cum | 263 ₹89,472.6 Lowest | 280 ₹95,256 |
| 3.00 | Cement concrete 1:4:8 (One of cement, Four of sand and Eight of hard broken stone) using 40mm size hard broken stone for foundation inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers.. | 25.2 | Cum | 5,502 ₹1,38,650.4 Lowest | 5,600 ₹1,41,120 |
| 4.00 | Supply and erecting shuttering for sides and soffits for side walls including cost and conveyance of al materials and labour charges etc complete | 1,062.36 | Sqm | 547 ₹5,81,110.92 Lowest | 550 ₹5,84,298 |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 135 | Cum | 6,256 ₹8,44,560 Lowest | 6,300 ₹8,50,500 |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 2.79 | mt | 91,917 ₹2,56,448.43 Lowest | 92,000 ₹2,56,680 |
| 7.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 32.4 | Cum | 9,239 ₹2,99,343.6 Lowest | 9,300 ₹3,01,320 |
| 8.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 8.1 | Cum | 6,802.5 ₹55,100.25 Lowest | 6,900 ₹55,890 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 4,07,644 ₹4,07,644 Lowest | 4,11,312 ₹4,11,312 |
Tender Value
₹27.1 L
EMD Value
₹27,100
Closing Date
6 Mar 2026, 3:00 pmClosed
Kurudampalayam Panchayat
Kurudampalayam Panchayat
Construction of drain with culvert at K.Vadamudurai Main road to Kamalesh Kalyana Mandapam H/O Kurudampalayam Panchayat in Periyanaickenpalayam Block in Coimbatore Dist under panchayat G Fund 2025-26
2026_RDTN_670421_1
ROC NO.01/2026 DATE.03.03.2026
Open Tender
Civil Works
Item Rate
Kurudampalayam Panchayat
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹27,100
15 Mar 2026
4 Mar 2026
6 Mar 2026
4 Mar 2026
6 Mar 2026
4 Mar 2026
Name of the Work : 1.Construction of drain with culvert at K.Vadamudurai Main road to Kamalesh Kalyana Mandapam H/O Kurudampalayam Panchayat in Periyanaickenpalayam Block in Coimbatore Dist under panchayat G Fund 2025-26
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 (One of cement, Four of sand and Eight of hard broken stone) using 40mm size hard broken stone for foundation inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers..
Supply and erecting shuttering for sides and soffits for side walls including cost and conveyance of al materials and labour charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BHCpricekamakesh.pdf
Tender Documents • 0.92 MB
BHCitech1kamakeshdrain.pdf
Tender Documents • 0.53 MB
BOQ_805665.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .