Loading…
Loading…
Tender Value
₹74.6 L
EMD Value
₹5.7 L
Closing Date
5 Sept 2026, 3:00 pm
Exicutive Officer Budhana
Exicutive Officer Budhana
Construction work of CC road and drain on Badkata Road in Budhana town.
2026_DOLBU_1179213_1
437/NPBUDHANA/2026-2027 DATE 20.08.2026
Open Tender
Civil Works - Roads
Fixed-rate
90 days
Exicutive Officer Budhana
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,399
Exicutive Officer
₹5.7 L
25 Aug 2026
25 Aug 2026
5 Sept 2026
25 Aug 2026
5 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Interlocking tiles including stacking of old Tiles. As per S.I. No.10.3 New Item IV | 3,094.88 | m2 | 13 | ₹40,233.44 |
| - | Scraping old painted surface including disposal of all scraped material to a distance of 30 meters(100 ft.) as directed by Enginer-in-charge. For small area as per S.I. No. 772 | - | m2 | 7 | - |
| - | Earth work in Filling ..........20 cm. layers including remming and dressing the surface to required levels and slopes and also including 10.00 Km cartage as directed by the Engineer incharge.(Royality removed by Govt.) for small works/Abadi area.(where machine can not move) S.I. 253a+261b+231a | - | m3 | 282.5 | - |
| - | M-150 Brick Work in (1:4) with cement and coarse sand mortar in including supply of all materials labour,Tools & plants etc. required for proper completion of the work as per S.I.No.305 (a) | 1 | m3 | 4,690 | ₹4,685.31 |
| - | 12 mm thick plaster with cement and coarse sand in (1:4) over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. S.I. No. 584(a) | - | m2 | 165 | - |
| - | Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of (4:2:1) including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. S.I. No. 279(a) | 34.65 | m3 | 5,750 | ₹1,99,237.5 |
| - | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,and compacting with smooth wheel roller to achieve the desired density,complete as per Technical Specification Clause 401. | 88.13 | m3 | 3,158 | ₹2,78,314.54 |
| - | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. | 180 | m3 | 3,773 | ₹6,79,140 |
| - | Providing, laying, spreading and compacting stone aggregates of specific sizes 22.4 to 53 mm water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber,applying and brooming , stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading-3 as per Technical specification Clause-405. | 489.49 | m3 | 3,849 | ₹18,84,047.01 |
| - | Cement concrete with 2 cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.5:3 in cc pavement (thickness as per design) cement coarse & fine aggregate confirming to IS standard mixed in concrete mixture/Plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel) channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools & plants etc. required for proper completion of work and also including complete shifting of Recron 38 fibre reinforcement material etcl & concrete etc. Asper S.I. No. 10.3 New Item 9 | 351 | m3 | 7,300 | ₹25,62,300 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_2217060.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].