Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.1 CrAccepted-AOC WHITE VILLAH VPO KALCHIYAN AMRITSAR | AMRITSAR | PUNJAB | 143001 | L1 | Accepted-AOC AOC | |
| 2 | L2₹31.7 Cr+₹65.5 L (2.11%)Rejected-Finance SCF 126 OPP SUKHRAJ CINEMA GONIANA ROAD BATHINDA 151001 | BATHINDA | PUNJAB | 151001 | L2 | Rejected-Finance Second Lowest |
Tender Value
₹32.8 Cr
EMD Value
₹65.5 L
Closing Date
13 Apr 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER PROVINCIAL DIVISION PWD B AND R BR JALANDHAR CANTT.
CONSTRUCTION OF 100 BEDDED CRITICAL CARE BLOCK AT CIVIL SURGEON OFFICE DISTT. JALANDHAR (PUNJAB) (BASEMENT PLUS 4 STOREY) UNDER SCHEME PM-ABHIM
2024_CEPW_120330_1
Bid No 48 of 13/03/2024
Open Tender
Civil Works - Buildings
Percentage
720 days
JALANDHAR
Please refer Tender documents.
13 documents required · 13 mandatory
₹50,000
₹65.5 L
JALANDHAR CANTT
23 Aug 2024
13 Mar 2024
15 Apr 2024
13 Mar 2024
13 Apr 2024
13 Mar 2024
27 Mar 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | i) CIVIL WORKS:- | - | - | - | - |
| - | A-1) Construction of Basement for Parking with Raft Foundation & Ground Floor Area Foundations with 2 No.Ramps | - | - | - | - |
| - | Earth work in excavation of foundations of bridges culverts, buildings including handling of material with a combined lead of 15 metres dressing of bed and sides stacking the excavated soil from the edge of excavation and subsequent filling around:- (a)For ordinary gravel soil involving pick work | 6,281.6 | Cum | 277.07 | ₹17,40,442.91 |
| - | Earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonary work in 15cm layer with compaction including disposal of all surplus soil as directed within lead of 30 mtr. | 1,086.27 | Cum | 191.74 | ₹2,08,281.41 |
| - | Providing and applying Anti Termite Treatment using pre constructional chemical treatment measures as per IS - 6313 - 2001 ( Part 2 ) & using Chemical containing chloropyrifos systemic insecticide diluted to manufacturer's specifications (i) In foundation pits, by treating the bottom & sides up to height of 300mm by uniformly spraying solution @ 5 Litre / sqm (ii) In the refill earth on both sides of all built up walls @ 7.5 Litre / Running meter (width - 300 mm, depth - 450 mm) (iii) Before laying the floor, by uniformly sprinkling the top surface of the consolidated earth within the outer perimeter @ 5 Litre solution per sqm. | 1,379.92 | Litres | 391.9 | ₹5,40,790.65 |
| - | Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% taking outside the premises in 15 cm layers including ramming, watering and consolidated lead upto 1000 metres | 2,747.69 | Cum | 521 | ₹14,31,546.49 |
| - | Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from foundation and taken only from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres | 199.46 | Cum | 66.37 | ₹13,238.16 |
| - | Cement concrete 1:4:8 with stone ballast with 40 mm gauge by mechanical means using concrete mixer volumetric type | 330.77 | Cum | 4,205.34 | ₹13,91,000.31 |
| - | Reinforced cement concrete M-30 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 2,284.93 | Cum | 6,461.02 | ₹1,47,62,978.43 |
| - | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 2,702.35 | Sqm | 221.24 | ₹5,97,867.91 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
BOQ_245738.xls
BOQ • 2.31 MB
141862628.pdf
Tender Documents • 0.84 MB
141862630.html
Tender Documents • 0.04 MB
Conditions_Fire_Fighting.pdf
Tender Documents • 0.28 MB
Conditions_HVAC.pdf
Tender Documents • 0.65 MB
Conditions_Tubewell_Pumping.pdf
Tender Documents • 0.86 MB
DRAWINGS.pdf
Tender Documents • 11.08 MB
SBD.pdf
Tender Documents • 23.68 MB
Specifications_CCHB.pdf
Tender Documents • 0.39 MB
Specifications_MGPS.pdf
Tender Documents • 0.22 MB
Technical_Conditions_Civil.pdf
Tender Documents • 1.07 MB
Technical_Conditions_Electrical.pdf
Tender Documents • 4.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .