Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹26.9 L
EMD Value
₹27,000
Closing Date
2 Dec 2026, 12:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE ETC-I Kanpur
SE ETC-I Kanpur
FOR REVETMENTS WORK ON TOWER NO 693B AND 694 A OF 400 KV UNNAO AGRA LINE UNDER ETD-I KANPUR
2026_UPTCL_1205475_1
ET No-39/ETC-I(K)/2026-27
Open Tender
Electrical Works
Fixed-rate
90 days
SE ETC-I Kanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,770
PNB A/C-0727002100004177
₹27,000
5 Nov 2026
5 Nov 2026
3 Dec 2026
5 Nov 2026
2 Dec 2026
5 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | REVETMENT WORK ON TOWER LOC No. 694 A | - | - | - | - |
| 2 | Earth work in excavation in foundation in ordinary soil including lifting etc with back filling of excavation | 52 | Cu .M | 134 | ₹6,968 |
| 3 | C.C. in foundation of ratio 1:4:8 with cement coarse sand and 40 mm brick ballast for proper completion of work including all labour T&P ,material and cement for proper completion of work | 44 | Cu .M | 4,051 | ₹1,78,244 |
| 4 | First class brick work in ratio 1:2:4 with cement & fine sand mortar using first class bricks including labour and T&P for proper completion of work . | 287 | Cu .M | 4,633 | ₹13,29,671 |
| 5 | 12 mm thick cement plaster outside / inside of four revetment wall in ratio 1:4 with cement and fines and mortar including all labour ,T&P ,material and cement for completion of work. | 636 | Sq.M | 150 | ₹95,400 |
| 6 | Filling of earth under the floor including cost of earth when obtained from outside the corporation area for proper completion of work | 480 | Cu .M | 288 | ₹1,38,240 |
| 7 | First class brick work soiling of flooring which including laying of brick flate edges ,filling of sand between the joints including preparation of base read for soiling including cost of material ,labour and T&P for proper completion of work . | 241 | Sq.M | 288 | ₹69,408 |
| 8 | Earthing and grouting arrangment of tower no.694 A with pipe type grouting cost of all material for satisfactory completion of work | 1 | job | 4,465 | ₹4,465 |
| 9 | REVETMENT WORK ON TOWER LOC No. 693 B | - | - | - | - |
| 10 | Earth work in excavation in foundation in ordinary soil including lifting etc with back filling of excavation | 14 | Cu .M | 134 | ₹1,876 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Tendernotice_2.pdf
PDF • 0.90 MB
BOQ_2284158.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .