Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAccepted-Finance | L1 | Accepted-Finance BELOW RATE QUOTED | |
| 2 | L2₹23.5 L+₹795.42 (0.03%)Rejected-Finance | L2 | Rejected-Finance ABOVE RATE QUOTED |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
27 Dec 2024, 3:00 pmClosed
The Block Development Officer B.PT
The Block Development Office, Kilpennathur
DEEPANING AND DE-SILTING OF THE POND IN KEEZHATHANGAL LAKE AT RAJANTHANGAL VILLAGE IN WARD NO 12 OF KILPENNATHUR BLOCK IN THIRUVANNAMALAI DISTRICT
2024_RDTN_512515_1
ROC.NO.A6/6239/2024 DT.14.11.2024
Open Tender
Civil Works
Item Rate
Kilpennathur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
28 Dec 2024
20 Dec 2024
27 Dec 2024
20 Dec 2024
27 Dec 2024
20 Dec 2024
Amount
Part I : Deepaning and De Silting of the Pond in Keezthangal Lake @ Rajanthangal Village in Ward No 12 of Kilpennat kulam with Construction of Batting Ghat and Inlet and out let side wall, baby pond lining wall Putheri Habitaition in Ganapapuram panchayat.
Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete
Sectioning during forming bunds when earth moving machinery.lorres and rollers are used for consoloidation
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
In Let & Out Let
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 :4 : 8mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete
Construction of Baby Pond Lining wall to 0 Kulam in 0 Panchayat.
Earth work excavation and depositing onsides with initial lead of 10 meter and initial lift of 2 meters in sand,silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to all material to site and all labour charges etc., complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour chages etc.,
Construction of Bhathing Ghat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Vasanthkumar (BID ID -1217338)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .