Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.3 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹8.8 Cr+₹49.8 L (6.01%)Admitted-Finance 4TH FLOOR CHINAR COMMERCIAL COMPLEX BUND RESIDENCY ROAD SRINAGAR 190001 KASHMIR | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | L2 | Admitted-Finance | ||
| 3 | L3₹9.9 Cr+₹1.6 Cr (19.0%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹12.3 Cr
EMD Value
₹25 L
Closing Date
24 May 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, FSC Narbal
Narbal
Anti erosion works on Khansahib Nallah, Budgam Nallah, Mandil Nallah and Khanpora Nallah under NABARD
2025_IFC_276614_1
E-NIT No. 01 of 2025-26 of FSCNarbal
Open Tender
Civil Works
Percentage
425 days
Narbal
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
Yes
Executive Engineer, FSC Narbal
₹25 L
Yes
Chief Engineer Kashmir I FC Department Srinagar
2 Jun 2025
3 May 2025
26 May 2025
3 May 2025
24 May 2025
3 May 2025
7 May 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 28,193.16 | Cum | 187.3 | ₹52,80,578.87 |
| 2 | Extra rates for quantities of works executed :In or under water and/ or liquid mud, including pumping out water as required | 3,024.56 | Cum | 37.46 | ₹1,13,300.02 |
| 3 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 13,535.41 | Cum | 592.9 | ₹80,25,144.59 |
| 4 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material :All kinds of soil : | 587.11 | cum | 89.75 | ₹52,693.12 |
| 5 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil: | 1,615.13 | Cum | 703.2 | ₹11,35,759.42 |
| 6 | Banking of excavated earth in layers not exceeding 20 cm in depth, including breaking of clods, watering, and compacting each layer with a ½-tonne roller or wooden/steel rammers, with every third layer and the top-most layer compacted using a power roller of minimum 8 tonnes, followed by dressing to the required profile for embankments in roads, flood banks, marginal banks, guide banks, etc., with a lead of up to 50 m and a lift of up to 1.5 m in all kinds of soil. | 1,825.01 | Cum | 429.45 | ₹7,83,750.54 |
| 7 | Supply of Stone boulder (nallah) nominal size 225 mm nominal size | 1,016.77 | cum | 980 | ₹9,96,434.6 |
| 8 | Supply of Stone boulder (quarry) nominal size 225 mm nominal size | 4,638.51 | cum | 1,645 | ₹76,30,348.95 |
| 9 | Dumping stone excluding cost of stones in Horizontal on level | 1,016.77 | Cum | 237.9 | ₹2,41,889.58 |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 8,232.72 | Cum | 218.4 | ₹17,98,026.05 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.36 MB
BOQ_851113.xls
BOQ • 0.36 MB
BOQ.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .