| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Lowest Rates |
| 2 | L2₹1.2 Cr+₹5.2 L (4.62%)Rejected-AOC | ₹1.2 Cr+₹5.2 L (4.62%) | L2 | Rejected-AOC High Rates |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
13 Jul 2022, 9:30 amClosed
Executive Engineer Lehal Division IB Patiala
Executive Engineer Lehal Division IB Patiala
Estimate for reconstruction (With Concrete Lining ) from RD 0 to 19080 (tail ) of Minor No. 4of Bhawanigarh Distributory off Taking at RD 34020/ R of Bhawanigarh Disty.
2022_WR_87365_6
004 Dated 28/06/2022
Open Tender
Civil Works - Canal
Item Rate
Patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
₹2.2 L
Yes
12 Sept 2022
28 Jun 2022
13 Jul 2022
28 Jun 2022
13 Jul 2022
28 Jun 2022
Amount
Excavation in soil (any type) using hydraulic ck 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead upto 30 m
Ordinary jungle clearance of both banks of running disty., minors and drains with discharge upto 9 cum/s including boundary
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick- Jumper work is not involed and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 mtr.
Extra for laying earth as per specification for compaction in 20 Cm. layers and dressing including the cost of rolling and watering as per P.W.D specifications.
Earth work for lip cutting for lining of irrigation channels inclusive of all allowance leads and dressing( as per earth work statement) (a) 0-1.5mt. Depth
Dressing of Earth work ( NEW )
Dismentaling of old lining and brick work in cement sand morter.
Dressing and preparation of sub grade for side slopes. a) Side Slpoe
Providing and laying Cement concrete (M-15) sleepers in bed and side slopes below the joints of concrete lining mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply carriage, loading & unloading of material complete in all respect as per design/drawing and PWD specifications a) Side Slpoe
Laying 1:3 (cement: water) cement slurry with cement @ 2.25 kg per sqmt on prepared bed & side slope before laying concrete
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) a) Side Slpoe
Providing and laying Cement concrete (M-15) for coping mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply ,carriage, loading & unloading of material complete in all respect as per design/drawing and PWD specifications
Filling of construction joints with sealing compound including supply carriage, of material complete in all respect as per design/drawing and PWD specifications
Filling expansion joints with special impervious hot pour 12.5 mm wide including supply ,carriage, of material complete in all respect as per design/drawing and PWD specifications a) For 60 mm thick Slab of lining
Providing and laying LDPE 150 micron over sleeper on construction joints and expansion joints complete in all respect as per design/drawing and PWD specifications
Shuttering for faces of concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications
Extra for Bitumen Painting @ 0.69 kg per Sqmt.
Dag Belling single kassi stroke minimum 7.5 cm. depth complete in all respect as per design/drawing and PWD specifications
Ordinary distance marks (Km Stone) after every 1000 feet Interval.
Earthwork involved in dismantleing of outlet'H' upto 0.50 meter
Dismantling of A.P.M of type outlet involved dismantling cement masonary and RCC slab with 'H' upto 0.50 mt
Adjusting new A.P.M block in correct 'y' and fixing in position
C.C. 1:4:8 with brick ballast 40mm gauge
Brick masonary in 1:4 CSM
RCC M20 for slab
bending binding and placing in posiion CTD bars Fe 500
Extra labour for dressing of bricks for outlet with 'H' upto 0.50 mt
THE INDRA BASTI CO OP LABOUR AND CONSTRUCTION SOCIETY LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .