| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC | ₹5.4 L | L1 | Accepted-AOC Lowly Quated |
| Sl No | Description | Qty | Unit | Selvamuthukumar L1 |
|---|---|---|---|---|
| 1.00Construction of Mini CSC Type - V at PUMS in Lalpuram Panchayat | ||||
| 2.00 | Providing Pile Foundation 200mm dia 2.40m depth using reinforcement cement concrete 1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyance of all materials charges etc complete | 8 | NOS | 4,500 ₹36,000 Lowest |
| 3.00 | Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with | 2.27 | Cum | 250 ₹567.5 Lowest |
| 4.00 | Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete. | 4.19 | Cum | 2,200 ₹9,218 Lowest |
| 5.00 | CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete. | 4.19 | Cum | 6,000 ₹25,140 Lowest |
| 6.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) Below Ground Level | 12.04 | Sqm | 540 ₹6,501.6 Lowest |
| 7.00 | Above Ground Level | 35.64 | Sqm | 1,000 ₹35,640 Lowest |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 350 | KG | 90 ₹31,500 Lowest |
| 9.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement | 1.2 | Cum | 9,750 ₹11,700 Lowest |
| 10.00 | Above Ground Level | 2.66 | Cum | 9,800 ₹26,068 Lowest |
Tender Value
₹6.0 L
EMD Value
₹5,960
Closing Date
14 Aug 2026, 3:00 pmClosed
Block Development Officer (VP), Melbhuvanagiri
Block Development Officer (VP), Melbhuvanagiri
Construction of Mini CSC at PUMS in Lalpuram Panchayat
2026_RDTN_688810_1
A5/1055/2026 SBM(G) and GF(VP) 2026 - 2027
Open Tender
Civil Works
Item Wise
90 days
Melbhuvanagiri
As Per Tender
7 documents required · 7 mandatory
₹0
₹5,960
Yes
Panchayat Union, Melbhuvanagiri
19 Sept 2026
27 Jul 2026
14 Aug 2026
27 Jul 2026
14 Aug 2026
27 Jul 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Mini CSC Type - V at PUMS in Lalpuram Panchayat | - | - | - | - |
| 2 | Providing Pile Foundation 200mm dia 2.40m depth using reinforcement cement concrete 1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyance of all materials charges etc complete | 8 | NOS | - | - |
| 3 | Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with | 2.27 | Cum | - | - |
| 4 | Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete. | 4.19 | Cum | - | - |
| 5 | CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete. | 4.19 | Cum | - | - |
| 6 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) Below Ground Level | 12.04 | Sqm | - | - |
| 7 | Above Ground Level | 35.64 | Sqm | - | - |
| 8 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 350 | KG | - | - |
| 9 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement | 1.2 | Cum | - | - |
| 10 | Above Ground Level | 2.66 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
technicalbitlalpuramvp.pdf
Tender Documents • 0.59 MB
BOQ_828001.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .