| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹40.7 CrAccepted-AOC HIG 25 80 FEET ROAD ARINGAR ANNA NAGAR MADURAI 625 020 | MADURAI | TAMIL NADU | 625020 | ₹40.7 Cr Quoted ₹46.0 Cr | 1 | Accepted-AOC AOC |
| 2 | 2₹46.7 CrRejected-Finance | ₹46.7 Cr | 2 | Rejected-Finance Highest quoted bidder |
Tender Value
Refer Docs
EMD Value
₹18.6 L
Closing Date
9 May 2024, 2:00 pmClosed
Superintending Engineer
No.16 GST road, BSNL Building, St.thomas mount,alandur, Chennai 16
Construction of Road Over Bridge In lieu of Existing Level Crossing No.14 at Railway Km.22_14_16 in between Athipattu and Nandiyambakkam Railway Stations
2024_HWAY_447564_1
LC 14 Nandiyambakkam
Open Tender
Civil Works - Highways
730 days
Athipattu and Nandiyambakkam
Please refer tender documents
4 documents required · 4 mandatory
₹0
₹18.6 L
O/o Superintending Engineer Projects Circle Chenna
25 Jun 2024
13 Mar 2024
10 May 2024
13 Mar 2024
9 May 2024
25 Mar 2024
21 Mar 2024
Amount
Earthwork excavation in all classes of ORDINARY SOIL except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF UNDER ABUTMENTS AND PIERS FOR OPEN & PILE CAP as per section 300 of MORTH specification (V Revision) and Is 1200:1992 Part 1 (IV Revision)
upto 2m -Main Work
Sub Work - SAFETY KERB
Sub Work - FENCING ARRANGEMENTS
2m - 3m - Main Work
3m - 4m - Main Work
Providing and driving in position permanet M.S liner including cost and conveyance to the site and fabrication charges and tools and plants and driving M.S 6mm thick liner to be left peramnently with the pile shaft as per the requirement and as per the specifications and placing from the bottom with all leads and lifts using 6mm M.S sheet etc., complete as per section 1100 and 1600 of MORT@H specifications (V Revisions)
Providing 1200 mm Diameter Reinforced cement concrete cast-in-situ bored piles of M40 grade Design Mix using 20mm ISS size graded HBG metal with minimum cement content of 400kg per cu.m maximum water cement ratio of 0.4 and slump of 150 - 200mm by tremie concreting including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel including placing of reinforcement in position, concreting, including all labour charges for driving or boring, mobilisation of piling equipment and other accesssories required for driving the pile, cost of Bentonite solution and the temporary liners, chiselling and including forming of working platform over the river bed for accommodating piling eqipments including working platform, cost of test piles both initial and routine test for vertical loads and horizontal loads, forming approaches to the working platform, mixing concrete, filling it in position, compacting, cutting of pile head to cut off level for the casting the pile caps, including diversion of water course if necessary and all other incidental charges etc., complete as per standard specifications etc., complete for PILES BELOW ABUTMENTS & PIERS as per section 1100 and 1700 of of MORT@H specifications (V Revision)
Plain Cement Concrete M15 (Nominal Mix) using 40mm ISS HBG metalincluding cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELLING COURSE BELOW PILE CAP / ABUTMENTS, WINGS, PIERS and RETAINING WALL.
Main Work
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for PILE CAPS UNDER ABUTMENTS AND PIERS as per section 1100,1500 and 1700 of MORT@H specifications (V Revisions)
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for ABUTMENTS AND RETURNS ABOVE PILECAP as per section 1500,1700 and 2200 of MORT@H specifications (V Revisions)
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for COLUMN PIER ABOVE PILECAP as per section 1500 ,1700 and 2200 of MORT@H specifications (V Revisions)
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOUNDATION OF RETAINING WALL
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for RETAINING WALL (BELOW GROUND LEVEL)
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for RETAINING WALL (ABOVE GROUND LEVEL)
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for BED BLOCK CUM DIRT WALL OVER ABUTMENTS as per section 1500 ,1700
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for CAPPING BEAM OVER PIER as per section 1500 ,1700 and 2200 of MORT@H specifications (V Revisions)
Supply and fixing of Elastomeric bearing including cost and conveyance to work site, labour for fixing the same in correct position and all other incidental charges etc., complete as per standard specifications as per section 2000 MORT@H specifications (V Revisions) and IRC :83-2015(part II)
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for T-BEAM AND CROSS BEAMS as per section 1500 ,1700 and 2300 of MORT@H specifications (V Revisions)
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges,including inspection chamber, inclusive of 150mm ducts and other accessories of footpath etc., complete for DECK SLAB as per section 1500 ,1700 and 2300 of MORT@H specifications (V Revisions)
Vibrated Reinforced Cement Concrete M40 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for Inner CRASH BARRIER as per section 811,1700 and 2703.3 of MORT@H specifications (V Revisions)
Providing and fixing of Galvinised Iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.as per section 2705 of MORT@H specifications (V Revisions)
Plain Cement Concrete M15 (Nominal Mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork,lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB AND FOOTPATH RAMP as per section 1500,1700 and 2704 of MORT@H specifications (V Revision)
Vibrated Reinforced Cement Concrete M 30 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, laying, curing concrete, working at heights,hire charges for tools and plants, including all other incidental chages etc., complete for APPROACH SLABS as per section 1500,1700 and 2704 of MORT@H specifications (V Revisions)
Vibrated Cement Concrete M-30 Grade, Design Mix, using 25mm, 12mm and 6mm ISS HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for WEARING COAT OVER DECK SLAB AND APPROACH SLAB
Main Work
Supplying and installation of STRIP SEAL EXPANSION joint system of 40mm wide expansion gap provided in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly, including cost and conveyance of all materials, cost of testing as per the MOST specifications, including labour, equipment and incidental charges for fixing the joints complete in all respects as per section 2600 of MORT@H specifications (V Revisions)
Providing and fixing Seepage pipes of 100mm dia of requied lengths for abutments and wings including cost and conveyance of all materials to work site and for labour charges for fixing, etc.,to drain of the backfill as per section 2706 of MORT@H specifications (V Revisions)
Main Work
Providing Filter media behind the abutments and wings for 600mm thickness using filter materials well packed with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc. complete.as per CI. 710.1.4 and appendix -6 of IRC : 78-2014
Main Work
Sub Work - APPROACH ROAD
Sub Work - PROTECTIVE WALL
Filling behind Abutments and returns with clean gritty free drainig gravel including cost and draining gravel having PHI value more than 35 conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc,complete as per CI. 710.1.4 and appendix -6 of IRC : 78-2014
Supply and fabrication of Fe-500D (HYSD) steel required in the schedule including cost of steel at site cost of providing and cost of fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings,including cost of binding wire(Galvanised-18 G), provision of spacer bars, cover blocks and all other incidental charges etc,complete,as per section 1600 of MORT@H specifications ( V revision)
Main Work
Sub Work - DRAIN CUM FOOTPATH
Sub Work - PROTECTIVE WALL
Supply and fabrication of Fe-240 steel required in the schedule including cost of steel at site cost of providing and cost of fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings,including cost of binding wire(Galvanised-18 G), provision of spacer bars, cover blocks and all other incidental charges etc,complete,as per section 1600 of MORT@H specifications ( V revisions)
Charges for Picking the existing B.T surface to 5 to 7 cm depth using milling machine, conveying the Milled waste materials to at least for 20 km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen item etc. complete as per the direction of the departmental officers
Sub Work - APPROACH ROAD
Earthwork excavation in all classes of ORDINARY SOIL except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for BOX CUTTING as per section 300 of MORTH specification (V Revision) and Is 1200:1992 Part 1 (IV Revision)
Sub Work - APPROACH ROAD
Sub Work - SERVICE ROAD
Forming the embankment using carted earth having soaked CBR value not less than required including cost and conveyance of earth from the approved source to site, spreading the earth uniformly to the entire formation width as directed by the departmental officers, including labour for breaking clods, sectioning, laying in layers not exceeding 250mm in loose thickness and compacting each layer to the required density in accordance with IS 2720 Part IV to 95% / 97% proctor density to the specified depth below the sub grade level, keeping the moisture content of the earth at the time of compaction within the range of 1% above and 2% below the optimum moisture content determined in accordance with IS 2720 using 80-100 Kn power roller rolling to achieve the required maximum dry density including labour charges for sectioning, watering with all leads for water, including fuel and hire charges for power roller, water sprinkler and other tools and plants employed, etc. complete as per clause 305 of MOSRT&H Specifications - 95% Compaction for Approach road.
Sub Work - APPROACH ROAD
Sub Work - SERVICE ROAD
Forming the embankment using carted earth having soaked CBR value not less than required including cost and conveyance of earth from the approved source to site, spreading the earth uniformly to the entire formation width as directed by the departmental officers, including labour for breaking clods, sectioning, laying in layers not exceeding 250mm in loose thickness and compacting each layer to the required density in accordance with IS 2720 Part IV to 95% / 97% proctor density to the specified depth below the sub grade level, keeping the moisture content of the earth at the time of compaction within the range of 1% above and 2% below the optimum moisture content determined in accordance with IS 2720 using 80-100 Kn power roller rolling to achieve the required maximum dry density including labour charges for sectioning, watering with all leads for water, including fuel and hire charges for power roller, water sprinkler and other tools and plants employed, etc. complete as per clause 305 of MOSRT&H Specifications - 97% Compaction
Sub Work - APPROACH ROAD
Sub Work - SERVICE ROAD
Providing and laying Granular Sub-Base Grade- III consisting of well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 401, 900.
Sub Work - APPROACH ROAD
Providing and laying Granular Sub-Base Grade- V consisting of well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 401, 900.
Sub Work - APPROACH ROAD
Sub Work - SERVICE ROAD
Provding and laying Wet Mix Macadam consisting of clean crushed aggregates confirming to the grading given in Table No.400-13, including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver on well prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 406, 900.
Sub Work - APPROACH ROAD
Sub Work - SERVICE ROAD
Providing and applying Prime Coat over granular Base with bitumen emulsion (SS-I type) on prepared surface including preparing the road surface and spraying the primer at the rate of 0.70 kg/Sq.m using bitumen sprayer as directed by the Engineer - over WMM as per MORTH No. 111, 112, 502.
Sub Work - APPROACH ROAD
Sub Work - SERVICE ROAD
Providing and applying Tack Coat over granular surface treated with primer using Bitumen Emulsion (RS-I type) with mechanical sprayer at the rate of 0.25 kg per Sq.m as directed by the Engineer as per MORTH No.111,112,503,900.
Sub Work - APPROACH ROAD
Sub Work - SERVICE ROAD
Providing, laying 75 mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5 for Approach road
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Sub Work - APPROACH ROAD
Sub Work - SERVICE ROAD
Plain Cement Concrete M15 (Nominal Mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications
Sub Work - APPROACH ROAD
Sub Work - FENCING ARRANGEMENTS
Sub Work - Drain
Providing RCC Centre Median height of 0.250m at bottom 0.250m at middle 0.625 at top and to a total height of 1.125m from the road level including cost and conveyance of all materials to work site including providing form work for shuttering on both sides and chamfered edges at top, including cost of steel reinforcement as per the Bar bending schedule appended here with, fabrication and placing in position of steel grills including cost of binding wire, laying of R.C.C M30 concrete using ISS HBG graded metal including cost and conveyance of all materials to work site from the approved sources including labour charges for mixing laying curing etc middle of the median as directed by the departmental officers, Rendering Smoothness over the CC surface with 10 kg of cement for 10 sqm area and painting two coats over the CC surfaces with best approved quality of synthetic enamel paint including primer etc., including all labour charges, hire and fuel charges for the tools and plants employed and as per the standard specification and in accordance with the drawings appended here with and as directed by the departmental officers etc., complete.
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5
Sub Work - SERVICE ROAD
Vibrated cement concrete M-25 Grade, (Nominal mix) using 20mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for Protection Wall - FOR FENCING ARRANGEMENTS
Supplying and fixing of M.S.Grill of approved design and as instructed by the departmental officers including prime coat and two coats of synthetic enamel paint including cost of materials, fabrication, conveyance to work site and fixing in position etc., complete
Earthwork excavation in all class of soil except hard rock not requiring blasting and depositing on bank with initial lead of 10m lift of 2m as per SS20B, including cost of labour, equipments and all other incidental charges such as bailing out water, sheeting, shorting, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions trimming bottom of excavation back filling clearing the and disposal of all surplus earth with all leads etc., complete as per standard specification for foundation of DRAINS IN SERVICE ROAD AND APPROACHES BEYOND THE RETAINING WALLS PORTION as per section 300 of MORTH specification (V Revision) and Is 1200:1992 Part 1 (IV Revision)
Plain Cement Concrete M20 (Nominal Mix) using 20mm ISS HBG metal including Cost and Conveyance of all materials to site and cost of Cement at site including soft water, labour charges for mixing, transporting, laying compacting, curing concrete, Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for LEVELLING COURSE CUM SAFETY KERB.
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for Drain bottom Slab.
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for Drain Vertical Wall.
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for Cover Slab of Drain.
Supplying and fixing of fiber reinforced concrete Manholes cover 60cm dia with frame as per IRC :50 - 1999 and as directed by the departmental officers at every 10m intervals along the drain cover slab for storm water drain portion.
Providing and fixing of Steel gratings of 300x150mm for drainage hole in the body wall of drain provided for every 5m including cutting ad fixing position during concretig as per direction of Departmental Officers
Earthwork excavation in all classes of ORDINARY SOIL except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF PROTECTIVE WALL as per section 300 of MORTH specification (V Revision) and Is 1200:1992 Part 1 (IV Revision)
upto 2m
2m - 3m Height
3m - 4m Height
4m - 5m Height
5m - 6m Height
Plain Cement Concrete M15 (Nominal Mix) using 40mm ISS HBG metalincluding cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELLING COURSE BELOW PROTECTIVE WALL.
Sub Work -Protective wall
Vibrated Reinforced Cement Concrete M 30 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOUNDATION OF PROTECTIVE WALL
Vibrated Reinforced Cement Concrete M 30 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for PROTECTIVE WALL (BELOW GROUND LEVEL)
Providing and fixing Seepage pipes of 100mm dia of requied lengths for abutments and wings including cost and conveyance of all materials to work site and for labour charges for fixing, etc.,to drain of the backfill as per section 2706 of MORT@H specifications (V Revisions)
Vibrated Reinforced Cement Concrete M40 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for Inner CRASH BARRIER FOR PROTECTIVE WALL as per section 811,1700 and 2703.3 of MORT@H specifications (V Revisions)
Providing and fixing 160 mm dia PVC pipes of approved class not less than 4 kg/Sq.cm. connecting the drainage spouts of the deck slab along both the sides of the deckslab connected to the Rainwater harvesting system below for two consecutive spans with all bends tees clamps and all other accessories and fixtures complete including tools and plants ,transportation etc., for Deck Drainage
Earthwork excavation in all classes of ORDINARY SOIL except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Providing Drainage arrangements to the ROB as per section 300 of MORTH specification (V Revision) and Is 1200:1992 Part 1 (IV Revision) for Deck Drainage & Rain water harvesting works
Upto 2 m
Filling with Sand including cost and conveyance of all materials and stacking at site to departmental guage for premeasurements, labour charges for laying, handling and filling in layers not more than 15 cm thick including watering with all leads for good soft water and all other incidental charges, tamping, compacting under optimum moisture content to get the maximum density for the pit and
Sub way -Rain water harvesting well
Filling with 40mm size ISS HBG metal in the rain water harvesting system including cost and conveyance of all material and labour charges for filling complete as directed by the Engineer for Deck Drainage & Rain water harvesting works
Filling with 20mm size ISS HBG metal in the rain water harvesting system including cost and conveyance of all material and labour charges for filling complete as directed by the Engineer for Deck Drainage & Rain water harvesting works .
Filling with 12mm size ISS HBG metal in the rain water harvesting system including cost and conveyance of all material and labour charges for filling complete as directed by the Engineer Deck Drainage & Rain water harvesting works.
Filling with 6 mm size metal complying with standard specifications including cost and conveyance of all materials and including labour charges for laying, handling and filling in layers of not more than 100 mm thick complete for rainwater harvesting.
Providing and laying of ISI Class NP 3 pipe of best quality of 1200mm dia. in the rain water harvesting system with all required specials including cost and conveyance of pipes and specials , labour charges for in position and all other incidental charges etc., complete for pipes as directed by the Engineer for Deck Drainage & Rain water harvesting works.
Supplying and fixing of fiber reinforced concrete cover slab of diameter 1.20m for rain water harvesting pits as directed by the department officers for Deck Drainage & Rain water harvesting works.
Painting two coat with ready mixed plastic emulsion paint and approved priming coat over the cement surface complete including scrapping clean removal of dirt parts for crash barrier, safety kerb, hand rails, bridge bottom sides, deck slab bottom, abutment, return walls and retaining wall sides with approved quality and colour including cost and conveyance of all materials to site , labour charges etc. complete as per standard specifications
Sub Work - PAINTING
Sub Work - FENCING ARRANGEMENTS
Filling with excavated earth in between trestle portion of ROB including cost and conveyance to work site , laying and filling in layers, tamping under optimum moisture content to get the maximum dry density including watering, handling charges and all other incidental charges etc. complete as per relevant specifications - for Fencing Arrangements
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness 2.5mm exclusive of surface applied glass beads as per IRC 35. The finished surface to be level, uniform and free from streaks and holes complete as per MORTH & H specification -
Sub Work - ROAD FURNITURES
Providing and Fixing of Retro Reflectorised Cautionary, mandatory and Informatory signs made of High Intensity Prismatic Grade Sheeting conforming to IRC 67-2010 and ASTM D 4956-09, type IV Specification and fixed over 1.5mm thick Aluminium sheet fixed on back supporting frame of 25mm x 25mm x 3mm Mild steel angle and supported on a mild steel angle iron post 75mm x 75mm x6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cm x 45cm x 60cm, 60cm below Ground level etc complete including 7 year warranty for the Retro Reflective Sheeting as per clause 6.9 of IRC 67:2010 Specification (As per MORT & H specification No.801) - Road Furnitures
60cm circular board - Sub Work - ROAD FURNITURES
60 x 45 cm Rectangular board - Sub Work - ROAD FURNITURES
60cm Eqilateral triangle board - Sub Work - ROAD FURNITURES
Octogonal Stop board - Sub Work - ROAD FURNITURES
Providing and errecting direction and place identification retro - reflectorised signs as per IRC 67-2001 made of High intensity Grade sheeting vide Clause 801.3 fixed over Aluminum sheeting 1.5mm thick with area exceeding 0.90 Sqm supported on a mild steel angle iron post 75x75x6mm 2 nos. firmly fixed to the ground/ Bridge structure by means of properly designed foundation with M15 grade cement concrete 45x45x60cm. 60 cm below ground level / other means as per site constraints etc., complete and in the bridge locations, the height of the post mentioned above is only tantative and it may be providedaccording to the site conditions and it has to be fixed to the crash barrier with necessary steel brackets or clamps and fixing with necessary joinaries and concrete, The cost is inclusive of all the above items, labout, material charges etc., for providingand fixing as per MORT&H specification No. 801in the ROB.
Sub Work - ROAD FURNITURES
Providing and fixing unidirectional or bi directional reflective pavement marker (RPM) or road studs bonded to or anchored within the road surface for lane marking and delineation for night time visibility with plastic body of RPM / Road studs moulded from ASA (acrylic strene acrylonitrite) of HIPS (high impact polystyrene). The marker shall support a load of 13635 kg tested in accordance with ASTM D 4280. Reflective panels shall consist of number of lanes containing single or dual prismatic cube capable of providing total internal reflection of the light entering the lens face. Lenses shall be moulded of methyl methecrylate conforming to ASTM D 788 or equivalent etc., complete (As per technical specification of NHAI clause A-8)
Sub Work - ROAD FURNITURES
Supplying and installation of Delineators( road way indicators, Hazard markers, object markers), 80-100 cm above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75mm dia circular reflectorised panels at the top, burried or pressed in to the ground conforming to IRC 79 etc., complete( as per MoRT&H Sp, No.805)
Providing and erecting of Retro - Reflectorized hazard Marker sign made out of High Intensity Prismatic Grade sheeting confirming to Type IV standards of IRC 67-2012 and astm D 4956-09 specification and fixed over 2mm thick aluminium sheet fixed over a back supporting frame of 25*25*3mm mild steel angle and supported on a mild steel angle post 75*75*6mm and 0.6m below Ground level. The sugn post should be painted as per IRC67-2012 and firmly fixed to the ground by means properly designed foundation with M15 grade cement concrete 45*45*60 cm size including cost and conveyance of all materials, equipments, machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity retor reflectro sheet shall consist of minimum coefficient of retro reflection as per table 6.6 of IRC 67-2012. The retro reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of 3 years outdoor exposure report shall be obtained as per IRC 67-2012 (as per MORTH specification no.801) - ROAD FURNITURES
Disposal of excavated earth materials, done along with the process of earthwork excavation, by mechanical transport with a lead of 5km and stacking the earth to departmental gauge / free gauge at the ROB site before loading into lorries/tippers as per the directions of Departmental officers and as per the standard specifications, the payment for disposal of earth will be made after deducting a loose volume of 20% of the quantity from the stack measurement quantity, including all other incidental charges etc., complete as per MOST 301.
Sub Total Amount for above all items
GST 18% for the above SubTotal Amount
RR INFRAA CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid