Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹34.4 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹37.6 Cr+₹3.2 Cr (9.22%)Admitted-Finance DISTT BARMER | BARMER | L2 | Admitted-Finance |
Tender Value
₹34.5 Cr
EMD Value
₹69.0 L
Closing Date
19 May 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Addl. Chief Engineer, PWD Zone-I Jodhpur
Addl. Chief Engineer, PWD Zone-I Jodhpur
Widening and Strengthening Narsana to Dungari Via Jhab Siwara Chitalwana km 16/00 to 42/00 , 64.500 to 70/00 in District Jalore
2022_CEPWD_268757_3
NIT No.02/2022-23 of ACE PWD Zone-I Jodhpur bid
Open Tender
Civil Works
Percentage
330 days
Jalore
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,000
Executive Engineer, PWD Division Sanchore
₹69.0 L
Yes
Addl. Chief Engineer, PWD Zone-I Jodhpur
30 May 2022
19 Apr 2022
23 May 2022
19 Apr 2022
19 May 2022
19 Apr 2022
5 May 2022
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part (A) Km 0/0 TO 16/00 0
Part 'A' (Road Work) Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MORTH specification clause 201 By mechanical Means . In area of light jungle | 9.6 | Hect. | 14,884 | ₹1,42,886.4 |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 metres, stacking serviceable and unserviceable materials separately as per MORTH specification clause 202.By Mechanical Means :Bituminous courses | 420 | cum | 147 | ₹61,740 |
| 3 | Earth work in excavation, including stacking/disposal of surplus material with all lifts and lead upto 495 metres, exclusive of compensation of earth [MoRTH specification : Clause 301 to 305] In Ordinary Soil When excavation and loading is done mechanically using Bull Dozar, F.E.Loader and carriage is done by tipper/dumper (6T capacity). | 48,928.98 | Cum | 46 | ₹22,50,733.08 |
| 4 | Compensation for earth, taken from private land with all lead and lift (Land to be arranged by private negotiations by the contractor) [MoRTH Specification : Clause 301to 305]. /3.5 | 45,717.46 | Cum | 18 | ₹8,22,914.28 |
| 5 | Extra for laying earth as per specification for compaction in 200 mm thick loose layers and dressing [MoRTH Specification Clause 305.3.5].BY MECHANICAL MEANS, using Motor Grader, from earth in stock piles with all lead and lift but excluding rolling and watering. | 45,717.99 | Cum | 24 | ₹10,97,231.76 |
| 6 | Extra for watering the earth to bring the earth upto required O.M.C excluding rolling | 45,717.99 | Cum | 17 | ₹7,77,205.83 |
| 7 | Extra for rolling to specification with the use of Vibratory roller when earth is at suitable moisture content with desired field density not less than 95% of maximum dry density (Modify Heavy Proctor test), excluding watering. | 11,625.6 | Cum | 34 | ₹3,95,270.4 |
| 8 | Extra for rolling to specification with the use of Vibratory roller when earth is at suitable moisture content with desired field density not less than 100% of maximum dry density (Modify Heavy Proctor test).excluding watering. | 34,092.5 | Cum | 36 | ₹12,27,330 |
| 9 | Providing laying, spreading and compacting specified graded crushed stone in sub-base course including premixing the material at OMC in wet mix plant, carriage of mixed material, laying in uniform layers with motor grader, F.E.loader on a prepared surface and compacting with vibratory compactor to achieve the desired density including all material, labour, mach-nery, lighting barricading and maintenance of diversion complete.[MoRTH specification Clause 401] includiong 1 Km lead a) For Grading I Material | 7,845.5 | cum | 591 | ₹46,36,690.5 |
| 10 | Extra rate for carriage of mixed material additional lead | 7,845.5 | cum | 123.28 | ₹9,67,193.24 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 7.74 MB
Tendernotice_2.pdf
PDF • 8.44 MB
Tendernotice_3.pdf
PDF • 4.68 MB
Tendernotice_4.pdf
PDF • 0.18 MB
Tendernotice_5.pdf
PDF • 0.15 MB
Tendernotice_6.pdf
PDF • 4.68 MB
BOQ_479921.xls
BOQ • 0.37 MB
Post_Qualification_Narasana.pdf
Tender Documents • 0.33 MB
Financial_Narasana.pdf
Tender Documents • 5.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .