The Additional Chief Engineer// Tirupur EDC
OFFICE OF THE SUPERINTENDING ENGINEER, TIRUPUR ELECTRICITY DISTRIBUTION CIRCLE, 3rd FLOOR, KRBS TOWER, 208 / 650, METTUPALAYAM BUS STOP, PERUMANALLUR ROAD, TIRUPUR 641 602
Running works contract for HT and LT line erection works in Avinashi Division
2022_EB_249684_1
Spec.No.WOT.106/2022-23 Dt.02.09.2022
Open Tender
Electrical Works
Works
365 days
Avinashi Division
2 documents required · 2 mandatory
₹0
₹25,000
Yes
1 Oct 2022
2 Sept 2022
19 Sept 2022
2 Sept 2022
17 Sept 2022
2 Sept 2022
2 Sept 2022 - 17 Sept 2022
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) - For a lead upto 5 KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) - Above 5 KM of lead of every KM
Transportation of all types and sizes of poles and other associated materials from road side to pole pit and vice versa upto 0.50 KM
Transporting of distribution transformer / line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
Transporting of distribution transformer / line materials from stores to office / site above 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
Transporting of conductors of all sizes from road side to pit locations upto one KM of conductor
Loading of REC, RCC, PSC pole upto 8.00 m length
Loading of all REC, RCC, PSC pole above 8.00 m length
Loading of metal poles all sizes
Unloading of REC, RCC, PSC pole upto 8.00 m length
Unloading of all REC, RCC, PSC pole above 8.00 m length
Unloading of metal poles all sizes
Loading of distribution transformer upto 100 KVA
Loading of distribution transformer above 100 KVA and upto 500 KVA
Unloading of distribution transformer upto 100 KVA
Unloading of distribution transformer above 100 KVA and upto 500 KVA
Loading of meteing sets of all ratios
Unloading of meteing sets of all ratios
Loading of conductor
Unloading of conductor
Loading of iron & steel items
Unloading of iron & steel items
Loading of line materials
Unloading of line materials
Loading of 11 KV strain disc
Unloading of 11 KV strain disc
Loading of LT pin insulator, shackle, guy shackle, LT pin, metal parts, HT pin etc.,
Unloading of LT pin insulator, shackle, guy shackle, LT pin, metal parts, HT pin etc.,
Loading of single phase meter
Unloading of single phase meter
Loading of three phase meter
Unloading of three phase meter
Excavation & backfilling of pole pit for pole upto 8.00 m length by using JCB / manual
Excavation & backfilling of pole pit for pole above 8.00 m length by using JCB / manual
Excavation & backfilling of pole pit in hard soil (common to all size of poles)
Excavation & backfilling of pole pit in rocky area (common to all size of poles) by blasting / manual
Excavation & backfilling of structure pole pit 3 x 3 x 6 feet by using JCB or Manual for single pole DT structure
Erection of RCC, REC, PSC pole upto 8.00 m length by using crane / manual
Erection of RCC, REC, PSC pole above 8.00 m length by using crane / manual
Erection of metal support above 9 m / RSJ / rail pole / tubular pole
Mass concreting of pole with 1:4:8 mix using 40 mm jally including curing (material + labour)
Sleeve concreting with 1:4:8 mix using 40 mm jally including curing (material + labour)
Stay concreting with 1:4:8 mix using 40 mm jally including curing (material + labour)
Earthing of pole with GI wires 4 or 6 SWG by coil earthing
Provision of spike including earthing arrangement
Pipe earthing including excavation of earth pit and fixing earth pipe 3 m length
Excavation & backfilling of stay pit of 4.5 to 5 feet depth using JCB / Manual
Excavation & back filling of stay pit per location - hard rock requires blasting
Excavation & back filling of stay pit per location - hard rock without blasting
Excavation & back filling of stay pit per location - medium rock and dense medium rock requires blasting
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Erection of additional stay in the same stay rod, excluding excavation of stay pit and burial of stay rod
Replacement of stay rod only (including stay pit excavation & refilling & erection)
Replacement of guy shackle only in existing stay
Fixing of V cross arm 3.5 feet
Fixing of V cross arm 4.5 feet
Fixing of LT single phase cross arm
Fixing of LT 3 phase cross arm
Fixing of HT / LT TI fitting
Fixing of 11 KV porcelain pin insulator with pin or polymer composite pin insulator
Fixing of 22 KV porcelain pin insulator with pin or polymer composite pin insulator
Fixing of 33 KV porcelain pin insulator with pin or polymer composite pin insulator
Fixing of LT pin insulator
Fixing of HT disc 11 KV
Fixing of HT disc 22 KV
Fixing of shackle
Fixing of aluminium knob
Fixing of HT LAS (3 Nos.)
Fixing of LT LAS (3 Nos.)
Fixing of guarding cross arm
Fixing of tapping channel cross arm
Fixing of double channel cross arm
Fixing of open type fuse unit
Paving and stringing of conductor of sizes upto 7/2.59 mm ACSR or other equivalent conductor (for Route Length per Phase)
Paving and stringing of conductor of above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35 mm ACSR or other equivalent conductor (for Route Length per Phase)
Paving and stringing of conductor of 7/4.09 mm ACSR or other equivalent conductor (for Route Length per Phase)
Paving and stringing of conductor of one run of PVC cable line of all sizes with GI wire and reel insulator
Provision of guarding arrangement with two numbers earth pits excluding stay set erection - Flat guarding
Provision of guarding arrangement - Split neutral guarding
Erection of 11 / 22 KV AB switch (Horizontal)
Erection of 11 / 22 KV AB switch (Vertical)
Erection of centre rotating AB switch complete
Erection of HG Fuse Set, 3 Nos. (in Double Pole or Single Pole Structure)
Erection of top channel for double pole DT structure
Erection of bed channel 2 Nos. for double pole DT structure
Erection of belting angle 2 Nos. for double pole DT structure
Structure earthing complete with 3 pits and earth loops for double pole DT structure
Feeder arrangements with open type fuse unit for 2 feeders for double pole DT structure
HT jumpering complete for double pole DT structure
Painting of all clamps and other iron materials and painting of structure pole for double pole DT structure
LT bus arrangement for double pole DT structure
Fixing of support insulator angle and erection of 3 Nos. pin insulator for double pole DT structure
Fixing of danger board for double pole DT structure
DT yard cleaning and making uniform surface for double pole DT structure
Erection of double pole DT structure complete as per TNEB standard including painting, feeders arrangement, colour washing of poles etc., fixing of HT / LT LAS and jumpering, 3 Nos. earth pits with earth trough except erection of DT
Erection of tapping channel for single pole DT structure
Erection of transformer bed structure for single pole DT structure
Structure earthing complete with 3 pits and earth loops for single pole DT structure
Fixing of MCD box / 2 Nos. open type fuse unit arrangements for single pole DT structure
HT jumpering complete for single pole DT structure
Painting of all clamps, other materials and painting of structure pole for single pole DT structure
LT cable arrangement for single pole DT structure
Fixing of danger board for single pole DT structure
Erection of central supporting arrangement for single pole DT structure
Erection of 11 KV single pole structure complete without centre support without erection of DT
Erection of 11 KV single pole structure complete with centre support without erection of DT
Erection of distribution transformer at structure - Upto 25 KVA
Erection of distribution transformer at structure - Above 25 KVA to 100 KVA
Erection of distribution transformer at structure - Above 100 KVA to 250 KVA
Erection of distribution transformer at structure - 500 KVA and above
Erection of Integrated DT Metering Arrangements / Whole Current Meter
Fixing of Modem including accessories
Erection of metering set 11 KV / 22 KV
Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc. - With 11 KV AB switch using all types of poles of size 9 m and above length
Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc. - With 22 / 33 KV AB switch using all types of poles of size 9 m and above length
Erection of single pole DP complete and with single earth
Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit
Destruction of pole concreting at site
Retrieving grill from deteriorated RCC pole
Breaking the mass concrete of all supports
Dismantling of stay set complete including stay rod
Dismantling of stay set complete without stay rod
Dismantling of conductor of size upto 7/2.59 mm including transporting the conductors to the nearest road side and stocking in coils
Dismantling of conductor of size above 7/2.59 mm and upto 7/3.35 mm including transporting the conductors to the nearest road side and stocking in coils
Dismantling of conductor of size 7/4.09 mm including transporting the conductors to the nearest road side and stocking in coils
Releasing and reerection (resagging) of one run of all sizes of conductor (for Route Length per Phase)
Resagging of lines for all sizes at cut point location per wire / span
Dismantling of V cross arm 3.5 feet
Dismantling of V cross arm 4.5 feet
Dismantling of LT single phase cross arm
Dismantling of LT 3 phase cross arm
Dismantling of HT / LT TI fitting
Dismantling of HT pin insulator with pin 11 KV
Dismantling of HT pin insulator with pin 22 KV
Dismantling of LT pin with insulator
Dismantling of HT disc 11 KV with metal parts
Dismantling of HT disc 22 KV with metal parts
Dismantling of LT shackle with metal parts
Dismantling of aluminium knob
Dismantling of HT LAS (3 Nos.)
Dismantling of LT LAS (3 Nos.)
Dismantling of guarding cross arm
Dismantling of tapping channel cross arm
Dismantling of double channel cross arm
Dismantling of open type fuse unit
Dismantling of 11 / 22 KV AB switch (Horizontal)
Dismantling of 11 / 22 KV AB switch (Vertical)
Dismantling of HG Fuse Set (3 Nos.)
Dismantling of top channel from double pole DT structure
Dismantling of bed channel 2 Nos. from double pole DT structure
Dismantling of belting angle 2 Nos. from double pole DT structure
Dismantling of structure earthing complete of double pole DT structure
Dismantling of feeder arrangements with open type fuse unit 2 Nos. from double pole DT structure
Dismantling of HT jumpering complete of double pole DT structure
Dismantling of LT bus arrangement from double pole DT structure
Dismantling of support insulator angle and 3 Nos. pin insulator from double pole DT structure
Dismantling of danger board from double pole DT structure
Dismantling of double pole transformer structure materials complete set and transporting the same from the location to the road side
Dismantling of tapping channel from single pole DT structure
Dismantling of transformer bed structure from single pole DT structure
Dismantling of structure earthing complete from single pole DT structure
Dismantling of MCD box / 2 Nos. open type fuse unit arrangements from single pole DT structure
Dismantling of HT jumpering complete of single pole DT structure
Dismantling of LT cable arrangement from single pole DT structure
Dismantling of danger board from single pole DT structure
Dismantling of central supporting arrangement from single pole DT structure
Dismantling of 11 KV single pole structure complete without centre support
Dismantling of 11 KV single pole structure complete with centre support
Releasing of DT below 200 KVA from structure
Releasing of DT 200 KVA & above but below 500 KVA from structure
Releasing of DT 500 KVA from strcuture
Dismantling of Integrated DT Metering Arrangements / Whole Current Meter
Dismantling of Modem including accessories
Releasing of metering set 11 KV / 22 KV from strcuture
Manufacturing / altering of clamp
Drilling of hole in the structure materials, clamps, etc.,
AB switch or open type side arm stud cutting and drilling holes
Cutting of flat per cutting
Cutting of channel per cutting
Cutting of angle per cutting
Cutting of pipe per cutting
TI fitting welding with clamps
Cutting of RS joist pole
Welding in RS joist pole
Manufacturing of earth pipe clamp for structure including of drilling holes and welding with earth pipe
Hut service connection works (All labour charges except making connection to the over head line)
Fixing of one set of street light fixture with clamp and fitting of all sizes including cable jumpering and including transportation
Provision of street light switching arrangement including fixing of meter, wiring & service board etc.
Fixing of street light
Dismantling of street light switch box with pipe
Dismantling of one set of street light fixture with clamp and fitting of all types
Erection of MV / sodium vapour lamp including wiring and fixing at street light location including transportation
Dismantling of MV / sodium vapour lamp including wiring
Replacing the worn out service connection cables
Releasing and re-erection of single phase SC wire [during conductor or support change]
Releasing and re-erection of 3 phase SC wire [during conductor or support change]
Fixing and Dismantling of Single Phase Meter
Fixing and Dismantling of Three Phase Meter
Providing of line spacers in LT line 1 phase
Providing of line spacers in LT line 3 phase
Fixing of LT shunt capacitor
Numbering of pole including base painting and with cost of paint
Painting of distribution transformer of all capacities (paint to be supplied by the TANGEDCO) including cleaning of DT
Painting of iron pole up to 36 ft length with double coats including cost of paint
Painting of iron pole up to 40 ft length with double coats including cost of paint
Painting of cement poles by distember coating including cost of distember
Painting of structure materials, distribution transformers with aluminium paint of structure poles and writing of transformer details (Brush to be owned by the contractor) (Paint to be supplied by Department)
Service connection details painting
Setting right the leaning pole in HT / LT at pin point location
Setting right the leaning pole in HT / LT at cut point location
Failed DT replacement below 100 KVA
Failed DT replacement 100 KVA and above
Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination
Replacement of corroded earth pipe
Re-examination of DT earthing (Digging, inspection and making connection in between exsisting 3 Nos. earth pipe)
Re-earthing of structure completely
DT yard cleaning
Cleaning of RMU
Cleaning of Ring Fencing
Removing weed in substation yard / office premises
Bush clearance out side substation yard / office premises (light)
Jungle clearance such as kattu karuvai in the various area without uprooting
Jungle clearance such as kattu karuvai in the various area with uprooting
Clearing of tree branches of coconut tree
Clearing of tree branches of neem, tamarin, country, etc.,
Leveling of ground using Bul Dozer
Clearing of branches / trees with JCB
Engaging crane per hour (for handling of poles, metering set, DT, etc.)
Engaging JCB per hour (for extension works & maintenance works etc.)
Fencing of distribution transformer structure at road side, fabrication and erection (including all materials)
SUB TOTAL (Items 1 to 230)
EPF @ 13.00 % on 100 % of (Items 1 to 230)
ESI @ 3.25 % on 100 % of (Items 1 to 230)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .