| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 CrRejected-Finance SEHORE SEHORE MADHYA PRADESH | SEHORE | MADHYA PRADESH | 461445 | ₹7.8 Cr | L1 | Rejected-Finance The technical committee has recommended cancelling the tender and re-inviting bids. |
| 2 | L2₹6.8 Cr−₹1.0 Cr (13.0%)Rejected-Finance | ₹6.8 Cr−₹1.0 Cr (13.0%) | L2 | Rejected-Finance The technical committee has recommended cancelling the tender and re-inviting bids. |
| 3 | Not Admitted-Fee/PreQual/Technical GRAM DHATURIYA DISTRICT RAJGARH MP | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | RAMA INDUSTRIES L1 | SHREE JANKI CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | 1.Work of Providing, Laying, Jointing, Testing, Commissioning & Trial run of Dia. 150 mm to 600mm DWC HDPE DI and RCC NP4 Class pipe as per IS 16098 Part 2 and IS 458 with latest amendments having total length 2126 Km with suitable joints including testing of joints, cost of pipes and jointing material complete with up to date amendments.
2.Design, providing, construction, installation, commissioning, and operation of Nature Based composite ECO-Constructed Wetland (ECO-CW) / Phytoremediation based STP of capacity 1 MLD
3.Construction of Interception and Diversion Structure
4.Construction of Drain length 460 m
5.Construction of retaining wall structure 52 meter length
6.Reuse Plan for Liquid Waste Management Scheme considering 20% of treated wastewater to be reused (Silwani Town)
7.Construction of Intermediate Sewage Pumping station with Pump house including Boundary, Approach road, Gate, site development & all necessary electrical and mechanical accessories. Job includes Pumps and required associated works to complete the job in all respect
8.Online Control Monitoring System (Ocms)
9.Providing HT Feeder connection upto Sewage treatment plant. | 1 | Lump-Sum | 4,60,89,970 ₹4,60,89,970 | 4,37,34,228.8 ₹4,37,34,228.8 Lowest |
| 2.00 | Operation and Maintenance Cost For 1st Years | 1 | Lump-Sum | 10,50,000 ₹10,50,000 Lowest | 11,80,000 ₹11,80,000 |
| 3.00 | Operation and Maintenance Cost For 2nd Years | 1 | Lump-Sum | 10,50,000 ₹10,50,000 Lowest | 12,50,800 ₹12,50,800 |
| 4.00 | Operation and Maintenance Cost For 3rd Years | 1 | Lump-Sum | 10,50,000 ₹10,50,000 Lowest | 13,25,848 ₹13,25,848 |
| 5.00 | Operation and Maintenance Cost For 4th Years | 1 | Lump-Sum | 10,50,000 ₹10,50,000 Lowest | 14,05,398.88 ₹14,05,398.88 |
| 6.00 | Operation and Maintenance Cost For 5th Years | 1 | Lump-Sum | 10,50,000 ₹10,50,000 Lowest | 14,89,722.81 ₹14,89,722.81 |
| 7.00 | Operation and Maintenance Cost For 6th Years | 1 | Lump-Sum | 10,50,000 ₹10,50,000 Lowest | 15,79,106.18 ₹15,79,106.18 |
| 8.00 | Operation and Maintenance Cost For 7th Years | 1 | Lump-Sum | 10,50,000 ₹10,50,000 Lowest | 16,73,852.55 ₹16,73,852.55 |
| 9.00 | Operation and Maintenance Cost For 8th Years | 1 | Lump-Sum | 10,50,000 ₹10,50,000 Lowest | 17,74,283.71 ₹17,74,283.71 |
| 10.00 | Operation and Maintenance Cost For 9th Years | 1 | Lump-Sum | 10,50,000 ₹10,50,000 Lowest | 18,80,740.73 ₹18,80,740.73 |
Tender Value
₹4.9 Cr
EMD Value
₹2.4 L
Closing Date
25 Mar 2026, 5:30 pmClosed
CHIEF MUNCIPAL OFFICER
BHOPAL ROAD WARD 03 NAGAR PARISH SILWANI
Interception and Diversion of Nallahs with STP works of Silwani town under SBM 2.0
2026_UAD_482836_1
UADD/SILWANI/200/16/02/2026
Open Tender
Civil Works - Others
Lump-sum
silwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹2.4 L
Nagar parishad Silwani Office Meeting Hall
29 Jun 2026
24 Feb 2026
30 Mar 2026
24 Feb 2026
25 Mar 2026
24 Feb 2026
10 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Work of Providing, Laying, Jointing, Testing, Commissioning & Trial run of Dia. 150 mm to 600mm DWC HDPE DI and RCC NP4 Class pipe as per IS 16098 Part 2 and IS 458 with latest amendments having total length 2126 Km with suitable joints including testing of joints, cost of pipes and jointing material complete with up to date amendments.
2.Design, providing, construction, installation, commissioning, and operation of Nature Based composite ECO-Constructed Wetland (ECO-CW) / Phytoremediation based STP of capacity 1 MLD
3.Construction of Interception and Diversion Structure
4.Construction of Drain length 460 m
5.Construction of retaining wall structure 52 meter length
6.Reuse Plan for Liquid Waste Management Scheme considering 20% of treated wastewater to be reused (Silwani Town)
7.Construction of Intermediate Sewage Pumping station with Pump house including Boundary, Approach road, Gate, site development & all necessary electrical and mechanical accessories. Job includes Pumps and required associated works to complete the job in all respect
8.Online Control Monitoring System (Ocms)
9.Providing HT Feeder connection upto Sewage treatment plant. | 1 | Lump-Sum | 4,85,72,000 | ₹4,85,72,000 |
| 2 | Operation and Maintenance Cost For 1st Years | 1 | Lump-Sum | 11,80,000 | ₹11,80,000 |
| 3 | Operation and Maintenance Cost For 2nd Years | 1 | Lump-Sum | 12,50,800 | ₹12,50,800 |
| 4 | Operation and Maintenance Cost For 3rd Years | 1 | Lump-Sum | 13,25,848 | ₹13,25,848 |
| 5 | Operation and Maintenance Cost For 4th Years | 1 | Lump-Sum | 14,05,398.88 | ₹14,05,398.88 |
| 6 | Operation and Maintenance Cost For 5th Years | 1 | Lump-Sum | 14,89,722.81 | ₹14,89,722.81 |
| 7 | Operation and Maintenance Cost For 6th Years | 1 | Lump-Sum | 15,79,106.18 | ₹15,79,106.18 |
| 8 | Operation and Maintenance Cost For 7th Years | 1 | Lump-Sum | 16,73,852.55 | ₹16,73,852.55 |
| 9 | Operation and Maintenance Cost For 8th Years | 1 | Lump-Sum | 17,74,283.71 | ₹17,74,283.71 |
| 10 | Operation and Maintenance Cost For 9th Years | 1 | Lump-Sum | 18,80,740.73 | ₹18,80,740.73 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_567511.xls
BOQ • 0.27 MB
TendarDocuments.pdf
Tender Documents • 2.11 MB
Model_Annexure.pdf
Other Document • 2.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .