Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.1 LAccepted-AOC | ₹26.1 L Quoted ₹27.2 L | L1 | Accepted-AOC Lowest |
| 2 | L2₹31.1 L+₹3.9 L (14.5%)Rejected-Finance | ₹31.1 L+₹3.9 L (14.5%) | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹35.3 L+₹8.1 L (29.8%)Rejected-Finance PLOT NO 28 SANTOSHIMA COLONY WEST MARREDPALLY SECUNDERABAD 500026 | HYDERABAD | TELANGANA | 500026 | ₹35.3 L+₹8.1 L (29.8%) | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹37.1 L+₹9.9 L (36.6%)Rejected-Finance HOUSE NO 2 4 136 LINGREDDY MANSION BLOCK NO IV OPP HANUMAN TEMPLE TADBUND SECUNDERABAD 500009 | SECUNDERABAD | HYDERABAD | TELANGANA | 500009 | ₹37.1 L+₹9.9 L (36.6%) | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹39.7 L+₹12.6 L (46.3%)Rejected-Finance | ₹39.7 L+₹12.6 L (46.3%) | L5 | Rejected-Finance Not Lowest |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
11 May 2020, 6:00 pmClosed
GE I R and D Kanchanbagh
GE I R and D Kanchanbagh Kanchanbagh Post Hyderabad 500058
REPAIR/MAINT AND SERVICING OF COMPRESSORS, CHILLERS, CONDENSORS, COOLING TOWERS, DUCTS INCLUDING W/LINES OF CENTRAL/PACKAGE AC PLANTS AND OUTSOURCING OF SERVICES FOR CENTRAL AC PLANT AT NGARM PROJECT INSTLD AT DRDL/ASL AREA UNDER GE I RND KBAGH, HYD.
2020_MES_338720_1
GE I KBAGH TOKEN 01 OF 2020 2021
Open Tender
Civil Works
Item Rate
330 days
Hyderabad
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
GE I R and D Kanchanbagh
₹98,000
Yes
9 Jun 2020
13 Apr 2020
13 May 2020
13 Apr 2020
11 May 2020
28 Apr 2020
14 Apr 2020 - 21 Apr 2020
Amount
Outsourcing of services for Central /package type AC plants of capacity 3x75 TR at workshop building comprising of compressors, condensers, cooling towers, chillers, AHU's and pipe lines from cooling tower to pumps, refrigerant piping of all gauges, controls, expansion valves, filters, suction and discharge valves, electric motors of compressors, blowers, mono block pump sets including all starters of all motors, electrical panel including bus bars, insulators, humidifiers, meters including charging of refrigerant gas R-22/134a/407c as and when required, `O' rings, gaskets, nuts, bolts, washers, routine checks like oil checking, `V' belts checking, gas (R-22/R-134a/407c) leakage checking, electrical control panel checking , greasing to motors & pump sets, but excluding repairs to the plants etc complete in one shift of 8 hours from 0900 to 1700 hours excluding Sundays/holidays complete all directed.
All as per item No. 1 here-in-before but of capacity 3x40 TR control AC plants at explosive bldg in one shift of 8 hours from 0900 to 1700 hours excluding Sundays/holidays complete all directed.
Note for item Nos 1.00 & 2.00 :- (i) In case of requirement, tradesmen provided for one area may be utilized in other areas at the discretion of the department without any extra cost to department as directed by Engr-in-Charge. (ii) Refrigerant gas for topping up shall be measured and paid separately as supply only. If on any account due to the neligence, gas leaks, gas shall be topped up by the contractor at no extra cost to the department and the decision of GE shall be final and binding.
(iii) Rate quoted is deemed to include the following (a) leave reserve/off of the staff employed. (b) The cost of uniform, shoes, and utilisation gloves for tradesmen employed. (c) necessary Tools & Plants . (d) Minimum wages to the employees to be paid as per the norms of Min wages of labour. (e) Each employee should be facilitated with adhoc bonus privilage, ESI & PF as applicable in accordance with Govt. of India (f) During operation of installations/equipments necessary safety precautions/safety devices to be adopted & in case of any eventuality to tradesmen/operators the contractor is fully responsible. (g) The contractor will adhere to pay monthly payment cycle to the employees irrespective of RAR/Funds availability with department .
Leak testing of the AC plant of capactiy 2x22 TR with nitrogen (N2) pressure after evacuating of the existing gas from the system into empty cylinder by separating the entire system, like compressors, evaporator, condensers, cooling coil and refrigerant lines and rectifying the leakage including cutting welding brazing etc and replacing of 'O' ring, washers, gaskets etc flushing out the Nitrogen and vaccumising, recharging the taking out refrigerant gas including testing complete all as directed.
All as per srl item No. 3.00 here-in-before but of 3 x 78 TR capacity Central AC plant.
All as per srl item No. 3.00 here-in-before but of 3 x 50.2 TR capacity Central AC plant.
All as per srl item No. 3.00 here-in-before but of 3 x 7.5 TR capacity AC plant.
All as per srl item No. 3.00 here-in-before but of 3 x 20 TR capacity AC plant.
All as per srl item No. 3.00 here-in-before but of 3 x 35 TR capacity AC plant.
All as per srl item No. 3.00 here-in-before but of 2 x 45 TR capacity AC plant.
All as per srl item No. 3.00 here-in-before but of 3 x 40 TR capacity AC plant.
All as per srl item No. 3.00 here-in-before but of 3 x 24 TR capacity Central AC plant, X-Ray bldg.
All as per srl item No. 3.00 here-in-before but of 2 x 11 TR capacity AC plant.
All as per srl item No. 3.00 here-in-before but of 2 x 16.5 TR capacity AC plant.
All as per srl item No. 3.00 here-in-before but of 1 x 39 TR capacity AC plant.
All as per srl item No. 3.00 here-in-before but of 3 x 30 TR capacity AC plant.
All as per srl item No. 3.00 here-in-before but of 3 x 70 TR capacity AC plant.
All as per srl item No. 3.00 here-in-before but of 3 x 145 TR capacity AC plant. Note for srl No.3.01 to 3.14 :- One condenser/Chiller unit shall be measured as one job for the purpose of payment.
Supply only refrigerant gas R-22 complete all as directed
Supply only refrigerant gas R-407c complete all as directed.
Supply only refrigerant gas R-134a complete all as directed. Make for srl item Nos. 4 to 4.02: Mefron/Fluron/Freon
Descaling of one condenser unit of following capacity of AC plants of 3x70 TR capacity of any make/type with and including descaling compound DC-96 by using Spiral brushing machine circulation with Magnetic pump for Impeller as required to remove complete scales from all copper tubes till the desired pressure is achieved including renewing of gaskets, nuts, bolts and washers Inlet & Outlet etc. and testing complete all as directed. Note: Quoted rate shall be deemed to include the following:- (i) Descaling Compound and Spiral Brushing equipment. (ii) Descaling pump/spiral brushing equipment. (iii) One condenser unit shall be measured as one job for the purpose of payment.
All as per srl item No.5.00 here-in-before but of 3 x 20 TR capacity Central AC plant at old Astra, Metrology Bldgs & Range sys plant.
All as per srl item No. 5.00 here-in-before but of 3 x 30 TR capacity central AC plant at Alignment metrology centre (140 bldg).
All as per srl item No. 5.00 here-in-before but of 3 x 35 TR capacity Central AC plant at Alignment inspection centre (140A bldg).
All as per srl item No. 5.00 here-in-before but of 3 x 32 TR capacity central AC plant at PMS-I.
All as per srl item No. 5.00 here-in-before but of 3 x 40 TR capacity Central AC plant at PMS-II, Mag 1.3 bldg & NGARM Exp bldg.
All as per srl item No. 5.00 here-in-before but of 3 x 78 TR capacity central AC plant at Computer Centre.
All as per srl item No. 5.00 here-in-before but of 3 x 24 TR capacity Central AC plant at X-Ray bldg.
All as per srl item No. 5.00 here-in-before but of 3 x 48 TR capacity Central AC plant at Digital Video bldgs.
All as per srl item No. 5.00 here-in-before but of 3 x 50 TR capacity Central AC plant at Data bldg.
All as per srl item No. 5.00 here-in-before but of 1 x 39 TR capacity Central AC plant at ZZ-YY mag.
All as per srl item No. 5.00 here-in-before but of 3 x 145 TR capacity Central AC plant, at Astra bldg.
All as per srl item No. 5.00 here-in-before but of 3 x 11 TR capacity Central AC plant at Machine Facility bldg & Mag 1.1 bldg.
All as per srl item No. 5.00 here-in-before but of 3 x 75 TR capacity Central AC plant at NGARM Workshop building.
All as per srl item No. 5.00 here-in-before but of 1 x 50.2 TR capacity central AC plant at precision metrology bldg.
Taking out carefully the chiller electronic programmable logic control board of any capacity / make of the chiller unit after disconnecting all connection and taking the PLCB to the authorised OEM service centre if necessary or repairing at site and testing the PLCB replacing the defective component of PLCB and testing the functioning of software and updating the software and code if necessary and refixing the same in its original position making all connections, testing all parameter like the chillers loading , unloading suction / head pressure , all temperature logs of 11 to 16.5 TR capacity AC plants complete to the entire satisfaction of Engr – In – Charge.
All as per srl item No. 6.00 here-in-before but of 20 to 50TR capacity central AC plants.
All as per srl item No. 6.00 here-in-before but of 70 to145 TR capacity central AC plants
Supply & Fix in repairs V-Belts of sizes A-32 / A-39 / A-42/A-29 of ISI marked and testing complete all as directed, .
All as per srl item No. 7.00 here-in-before but of sizes B-81 / B-90 / B-92/ /B-68/B-63/B-93/B-88
All as per srl item No. 7.00 here-in-before but of sizes B-106/B-108/B-124/B-122/B-125/B-117
All as per srl item No. 7.00 here-in-before but of sizes C-110/C-90/C-108
Draining out of old compressor oil Lubricants , supply and filling new refrigeration compressor oil of flash point COC 210 Degree Celsius Min. Suitable for compressors working on refigerant R-22/R-407C/R-134A confirming IS 13256: 1992 complete all as directed. Make : Servo / HP
Dismounting the centrifugal / mono block pumps of capacity and shifting the pump to the workshop for replacing the damaged parts like impellers (ss) bearings, bushes and necessary spares and re-fixing in its original position and testing to the entire satisfaction of the Engr-in-Charge Note: (i) The old U/S worn out parts should be displayed to Engr-in-Charge for testing the genuiness of repairs. (ii) Quoted rate shall include the cost of and from charges to workshop.
All as per srl item No. 9.00 as here-in-before but of capacity 12.5 HP to 15 HP centrifugal/ mono block pump.
All as per srl item No. 9.00 as here-in-before but of capacity 25.0 HP to 30.0 HP centrifugal/ mono block pump.
Supply and Fixing in repairs PVC fins of suitable to make cooling tower MIHIR as required at site including nuts & bolts complete all as directed.
Disconnecting and taking out the existing old unserviceable water sensors and supply & fix new water sensor, new anti freeze/ ambient air sensor of scroll compressor chillers of any capacity including testing complete all as directed. Make: As per OEM
Cleaning the Evaporator coils/cooling tower fins with acid by force feed method to remove the unwanted dust particles formed on the coils/fins and cleaning the dust particles, cleaning the filler, of any capacity make / model to the entire safisfaction of Engr-in-charge
Servicing, greasing, overhauling of AHU blower motor Of any capacity, checking the pulleys, base frame, cooling to opening covers and replacing the bearings, pulleys as per the existing model, lubricating all mechanical parts with synthetic grease and reassembling all parts, aligning of the pulley to its original position complete to the entire satisfaction of Engr-in Charge
Supply & fix PVC spray nozzles 3/4" dia flower type, (PVC pipe, bend, nipple of required sizes) suitable for 80/100/120 TR capacity cooling tower including removing the unserviceable sparay nozzles from site complete all as directed. Make - MIHIR/PAHARPUR.
Dismantling the complete cooling tower forced draft fan assembly of capacity 1x39 TR AC plant and supply & fixing new fan blade and fan motor (ISI marked) as per the existing capacity shaft hub key including aligning of fan blades including testing to the entire satisfaction complete all as directed.
All as per srl item No. 15.00 as here-in-before but of 3 x 70 TR capacity AC plant.
All as per srl item No. 15.00 as here-in-before but of 1 x 50 TR capacity AC plant.
All as per srl item No. 15.00 as here-in-before but of 3 x 24 TR capacity AC plant.
All as per srl item No. 15.00 as here-in-before but of 3 x 78 TR capacity AC plant. Make of item No.15 to 15.04: as approved by GE
Removing the existing unserviceable Oil pressure pump from the compressor, supply and fix new oil pressure pump of type as per the existing model / make including replacing the valve plate gasket-3 No's make as per at site requirement complete all as directed.
Disconnecting and removing the burnt out Cooling tower/AHU/Chiller fan motor from the existing plants, rewinding of the same with supper enamelled copper conductor with same existing gauge including turns ratio, replacing the startor insulations, replacement of bearings and reconnecting the same with electrical connections and testing capacity 5 HP to 7.5 HP complete all as directed.
All as per srl item No. 17.00 here-in-before but of capacity 12 HP to 15 HP.
All as per srl item No. 17.00 here-in-before but of capacity 20 HP to 30 HP.
Disconnecting and removing the burnt out monoblock pumping sets from the existing plants, of central/package type AC plants, rewinding the same with supper enamelled copper conductor with same existing gauge including replacement of bearings and reconnecting the same with electrical connections and testing of capacity 5 HP to 7.5 HP complete all as directed.
All as per srl item No. 18.00 as here-in-before but of capacity 12 HP to 15 HP.
Disconnecting and taking out the repairable centrifugal pumping sets from the existing central AC plants of capacity 20 HP to 30 HP and replaceing the impeller, bearing, bush, gasket sets, nut & bolts etc., including reinstallation of the plants, reconnecting the same with electrical connections and testing complete all as directed.
Disconnecting and removing the unserviceable solenoid valve assembly and supply and fix solenoid assembly of MOP275 PSI, SWP 300PSI and reconnect and testing complete all as directed. Make : Sporlon/Sanlan/Denfoss
Taking out unserviceable water pressure cutout and supply and fix new water pressure cutout IPS 70. Make: INDFOSS/Danfoss or equivalent
Disconnecting and removing the unserviceable suction valve assembly and supply and fix new suction valve assembly of 3x30 TR capacity AC plants and reconnecting the same and testing complete all as directed
All as per srl item No. 22.00 here-in-before but of capacity 3x48 TR AC plants.
All as per srl item No. 22.00 here-in-before but of capacity 3x70 TR AC plants. Make for srl item No. 22.00 to 22.02 : Sporlon/Sanlam or its equivallent.
S & F Air pre filters suitable for HVAC Air conditioning system AHU’s made with galvanised steel frame aluminium separators with non woven synthetic filter media as per existing size and shape including taking down old unserviceable Air pre filters completed all as directed Make: As per OEM
Material and labour for taking out the damaged insulation portion of existing outdoor duct, cleaning the duct, applying two coats of CPRX compound to cleaned portion of duct, applying one coat of bitumen paint, fixing of 50mm thick glass wool of 48 KG density to the duct and sealing it with hessian cloth and 15 mm thick chicken wire mesh and 15mm thick sand cement plaster with cement mortor CM 1:4 to the duct and applying two coats of white wash and two coats of snow cem of excising color and site clearance of old debris and making good all as specified and directed.
Material and labour for taking out the damaged insulation portion of existing refrigerant line/chilled water pipe line of sizes and cleaning the pipe and insulation with thermocole pipe section TF quality wrapped around pipe and fixing with GI wire mesh, plastering with cement mortar 1:4, 15 mm thick finished smooth and duly painted with two coats of cement based paint of existing colour and site clearance of old debris all as specified and directed
M&L for painting the interior and exterior parts of cooling towers with epoxy seal paint as per the manufactures specifications including preparing the surfaces of cooling towers after removing all the PVC fill, nozzles, ID fan and cleaning the water in collecting tray for algae free surfaces using necessary detergent chemicals complete sealing the leakage on the body if any while applying the epoxy sealing paint complete to the entire satisfaction of Engr-in-Charge.
Removing the existing unserviceable fan blade from cooling tower and supply and fix fan blade suitable for 20 to 48 TR capacity cooling tower complete all as specified and directed Make : GE/L&T or its equivallent.
All as per srl item No. 27.00 here-in-before but of 50 to 78 TR capacity cooling tower complete all as directed Make : GE/L&T or its equivallent.
Supply & Fix in repairs MCCB 400 Amps , 36KA , 3 pole , 415V with thermal magnetic release adjustable over load and short circuit release confirming IEC-60947-2 , IS -13947 , ICS=100%ICU, MCCB should be provided with suitable spreader links and phase barriers complete all as specified and directed . Make : Legrand (DPX)/Siemens /ABB
Supply & Fix in repairs MCCB 200 Amps , 36KA ,3pole , 415V with thermal magnetic release adjustable over load and short circuit release confirming IEC-60947-2 , IS-13947 , ICS=100% ICU, MCCB should be provided with suitable spreader links and phase barriers complete all as specified and directed. Make : Legrand (DPX) /Siemens /ABB
Supply & Fix MCCB 250 Amps , 36 KA , 3Pole , 415 V with thermal magnetic release adjustable over load and short circuit release confirming IEC-60947-2 , IS-13947 , ICS=100% ICU, MCCB should be provided with suitable spreader links and phase barriers complete all as specified and directed. Make : Legrand (DPX) /Siemens /ABB . Make for srl item Nos.28 to 30 : L&T / Legrand / Schneider / Seimins
M&L for fixing in repair the Aluminium composite panel thickness of sheet not less than cutting and pasting the vinyl letters as per the installation details given by the Site-In-Charge including fixing the board on the location specified with necessary fixing stainless steel bolts and washers complete all as directed. Make: As approved by the GE. Note: The sample piece of the panel should be produced for approval GE before ordering. (ii) Working height upto 5mtrs deemed to be included in quoted rate.
S & F in repairs, fabricating the base channel (ISI marked) frame work for the centrifigual monoblock pumps as per existing frame size, thickness and fixing in the existing PCC foundation using necessary accesories like bolts, nuts, fasteners etc., as required at site including making good the disturbed surface of existing PCC foundation complete all as directed.
M&L for preparation of base frame of any size and applying one coat of red oxide primer and two coats of black colour anti-corrosive paint complete all as specified and directed.
Supply and replace the following unserviceable components of AC plants
LP/HP cut out MP-15 of Make Sporlan/Sanlam.
Oil pressure cut out MP-55, Make Sporlan/Sanlam.
Contactors ML-1.5 Make : L&T/GE
Contactors ML-1 Make :L&T/GE
Contactors TC 1 D 5011 Make :Telemake/GE
Three Pole contactor MN -16 Make : L&T/GE
Three Pole contactor MN -25 Make : L&T/GE
Three Pole contactor CL 02 Make : GE/L&T
Three Pole contactor CL 01 with relay Make : GE/L&T
Single phase preventor suitable for 415V, AC, 50 Hz Make-Minelec/GE.
HRC fuse 4 amp with fuse holder as per existing panel Make-FTC/GE.
Thermal over load relay range 14-23 Amps suitable for MN type contactor, Make-FTC/GE.
Thermal over load relay range 9-15 Amps suitable for MN type contactor, Make-FTC/GE.
S&F in repairs shaft seal assembly Compressor of ACCEL Make SMC 4 - 100 model complete all as directed.
S&F in repairs shaft seal assembly Compressor of Accel Make SMC 4 - 65 model complete all as directed.
S&F in repairs shaft seal assembly Compressor of Voltas Make 5F - 40 model complete all as directed.
S&F in repairs shaft seal assembly Compressor of York Make J63F050B model including removing unserviceable one.
Taking down compressor motor of capacity 37 KW, 3 phase, 415 volts, 50 Hz, 1455 RPM cutting & removing the burnt winding, rewinding with same gauge of super enamelled copper conductor, insulating materials etc and heat varnishing the winding, replacing the worn out bearings complete reassembling connecting testing and commissioning complete all as directed.
All as per srl item No.39.00 here in before but of capacity 30 KW, 3 phase 50 Hz 1470 RPM
All as per srl item No.39.00 here in before but of capacity 15 KW, 3 phase 50 Hz 1470 RPM
Supply and Fix in repairs microprocessor control panel board of existing make suitable to package AC plant of capacity 2x 22 TR complete all as directed. Make : Voltas/Carrier or its equivallent.
Supply and Fix in repairs electronic control panel board of existing make/type suitable to package AC plant of capacity 2 x 7.5 TR complete all as directed. Make : Voltas/Carrier or its equivallent.
Removing the existing unserviceable liquid line drier filter and supply & fix new liquid line drier filter for use with CFC/HCFC/HFC/R-22/R-134a/R-407c and key suitable for 7.5/8.5/9 TR AC plants, complete all as directed.
All as per srl item No. 41.00 here-in-before but 24/30/32/35 TR capacity AC plant
All as per srl item No. 41.00 here-in-before but 75/70/78 TR capacity Central AC plant.
All as per srl item No. 41.00 here-in-before but 40/45/48/50 TR capacity AC plant.
All as per srl item No. 41.00 here-in-before but 11/16.5 TR capacity AC plant.
All as per srl item No. 41.00 here-in-before but 145 TR capacity AC plant.
Taking out the unserviceable scroll/reciprocating compressor from the existing position and supply & fix new scroll/reciprocating compressor including initial filling up refrigerant gas as per manufacturer recommendation to the required pressure and reconnecting of all connected system of capacity 7.5 TR complete all as directed.
All as per srl item No. 42.00 here-in-before but of capacity 11 to 12.5 TR
All as per srl item No. 42.00 here-in-before but of capacity 19.5 TR Make of item No. 42.00 to 42.02 : Copeland/Danfoss/Performer or as per site requirement.
Disconnecting and removing the unserviceable expansion valve assembly and supply and fix the new expansion valve assembly of 5/7.5/8.5 TR capacity AC plants and reconnecting the same with existing plants and testing complete all as directed.
All as per srl item No. 43.00 here-in-before but of capacity 24/30/32/35 TR AC plant.
All as per srl item No. 43.00 here-in-before but 75/70/78 TR capacity Central AC plant.
All as per srl item No. 43.00 here-in-before but 39/40/45/48/50 TR capacity AC plant.
All as per srl item No. 43.00 here-in-before but 11/16.5 TR capacity AC plant.
All as per srl item No. 43.00 here-in-before but 145 TR capacity AC plant. Make of item No. 43.00 to 43.05 : Sporlan/Sanlam or its equivallent.
Cutting existing steel/cast iron tubing for alterations or additions (Each cut measured) of following sizes complete all as directed:-
100 mm dia.
80 mm dia.
50 mm dia.
25 mm dia.
M&L for preparation of surfaces of AC plant ( ., and applying two coats of synthetic enamel paint of approved colour to the entire satisfaction of Engr-in-Charge complete all as directed. Note :Chiller unit ,compresser ,and connecting pipes of each plant are deemd as one unit for payment Make :- Asian/Berger
Supplying and laying GI steel water tubing medium grade of following sizes including taking down old pipes complete all as directed.
100 mm dia.
80 mm dia.
50 mm dia.
25 mm dia.
Supply and fix in repairs Gun-metal,globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed complete all as directed of following size
25 mm dia.
50 mm dia.
Removing the existing unserviceable butterfly valve of any size and supply and fix butterfly valve of following sizes including provn of nuts, bolts, washers and packing and testing complete all as directed. Make-Kirloskar/Kartar/upadyaya.
50 mm dia.
65 mm dia.
80 mm dia.
90 mm dia.
100 mm dia.
Supply & fix Scale guard of suitable size of existing Central AC plants of 78TR capacity, water cooled, pipe line removing existing scale guard carefully without any damaging of pipe line including testing, complete all as directed.
All as per srl item No. 49.00 here-in-before but of capacity 48 TR AC plant.
Taking out carefully the PLC Board of 3x145 TR capacity central AC plant of any make /model taking to the authorised service centre, checking all the components and replace the defective components of any type (electrical/electronic) updating the software as per OEM and checking the PLCB for complete working condition and re-fixing the PLCB to its original position connecting all cables and testing complete all as directed.
Taking out u carefully the PLC Board of 3x7.5 TR capacity central AC plant of any make /model taking to the authorised service centre, checking all the components and replace the defective components of any type (electrical/electronic) updating the software as per OEM and checking the PLCB for complete working condition and re-fixing the PLCB to its original position connecting all cables and testing complete all as directed.
S.S.ENGINEERING CORPORATION
Universal refrigeration and Engineering Company
omsai thermax engineers
CHITRA ENGINEERING CORPORATION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .