Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹37.7 L
Closing Date
27 Aug 2022, 5:00 pmClosed
Executive Engineer
O/o EXECUTIVE ENGINEER, KALAKTANG DIVISION, PWD, AP, PO KALAKTANG, DISTRICT WEST KAMENG, AP PIN 790002
C/o Domkho Morshing Kalaktang road via Sanglem in West Kameng District in Arunachal Pradesh (Ph I).
2022_PWDAP_864_1
KTD/DRG/G-04/2022-23 / 1242-62
Open Tender
Civil Works
1095 days
Kalaktang
Please refer Tender documents.
5 documents required · 5 mandatory
₹8,000
EE, Kalaktang Division, PWD, AP, Kalaktang.
₹37.7 L
Yes
Kalaktang
13 Sept 2022
13 Aug 2022
30 Aug 2022
13 Aug 2022
27 Aug 2022
13 Aug 2022
24 Aug 2022
Amount
Earth Work in New formation
In Cutting (Formation width = 9.00 Mtr)
Excavation in Hill Area in Soil by Mechanical Means (Dipositing of excavated earth with all lifts and lead upto 1000 m). Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres.
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting (Disposal of cut material with all lift and lead upto 1000 m) Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres.
Excavation in Hilly Areas in Hard Rock Requiring Blasting (Excavation in hilly areas in hard rock requiring blasting, by mechanical means including trimming of slopes and disposal of cut material with all lifts and lead upto 1000 metres.)
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. Ordinary and Hard Rock
Embankment Construction
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)
Cross Drainage Work (RCC slab culverts 1.50 Mtr span - 4 Nos., 2.00 Mtr span - 2 Nos. & 3.00 Mtr span -1 No.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (without de-watering)
i) Ordinary Soil
ii) Ordinary Rock (not requiring blasting)
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. a) Square Rubble Coursed Rubble Masonry (first sort)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC Grade M20 Using Concrete Mixer
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification. a) RCC Grade M25 Using Concrete Mixer
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Steel Composite Bridge - 30.00 Mtr Span
Sub-Structure
Earthwork for structures (Earthwork in foundation of structures as per drawing and technical specification, including setting out, construction of shiring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) A Manual Means (without de-watering) depth upto 3m
a) Ordinary soil
b) Ordinary rock (not requiring blasting)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. PCC Grade M20 Height upto 5m
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. RCC Grade M25 Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. Square Rubble Coursed Rubble Masonry (first sort)
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Super Structure
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification. C) RCC Grade M25 Case-1, Using Concrete Mixer For solid slab super-structure, a) Height upto 5 m to 10 m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Providing and laying cement concrete wering coat M30 grade including reinforcement complete as per drawing and Technical specifactions.
Drainage spouts complete as per drawing and Tehnical specification
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification
Burried Joint ( Providing and laying a burried expansion joint, expansion gap being 20 mm, covered with 12 mm thick, 200 mm wide galvanised weldable structural steel plate as per IS:2062, placed symmetrical to centre line of the joint, resting freely over the top surface of the deck concrete, welding of 8 mm dia. 100 mm long galvanised nails spaced 300 mm c/c along the centre line of the plate, all as specified in clause 2604.)
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Supply and fabrication of steel work at Fabricators workshop comprising of Main Girders, Cross Girders, Connecting plates, stringer, stiffening plates etc. from steel plates and structural steel of specified grades as per approved drawing including straightening, descaling, degreasing, cutting to size and shape, drilling, welding and grinding, supply of all MS/HTS shop or site bolts, nuts & washers, holding down bolts and nuts etc., trial assembling at workshop, one priming coat of shop paint with red lead paint conforming to IS-102 with all labour, material, cost of paints, consumables,stacking in protected condition etc. complete as per specification and as directed by the Engineer-in-Charge (Carriage cost from fabricator work shop to actual bridge site will be paid seperately). COMPOSITE BRIDGE Upto 40m single span or in Multiples
Taking delivery of fabricated steelwork from stacks at site as necessary, assembling and erection of fabricated steel structure to proper line , level and camber as per approved drawings complete in all respect including transportation and handling supply of all fasterners. Painting of all exposed surfaces of steelwork after erection with one coat of red lead confirming to IS-102 and two coats Alumunimium paint to IS-2339, grouting of anchor bolts in position, including all labour,consumables, materials, machinery, tools and tackles complete as per specification and as directed by the Engineer-in-Charge COMPOSITE BRIDGE Upto 40m single span or in Multiples
High dumping rubber bearings with seismic isolation, Vmax = 581 KN, Hmax = 58.1 KN
River training works
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
Gabian Structure for Erosion Control, River Training Works and Protection works : Providing and constructing gabian structures for erosion control, river training works and protection works with wire crates of size 2 m x 1 m x 0.3 m each divided into 1m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 mm x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be securely tied with 4 mm galvanised steel wire.
Protection Work
Retaining wall 3.00 m height - 150.00 Mtr, 4.00 Mtr height - 50.00 Mtr and Breast wall 3.00 Mtr height - 52.00 Mtr.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material Depth up to 3 Mtr
i) Ordinary Soil
ii) Ordinary Rock (not requiring blasting)
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. Square Rubble Coursed Rubble Masonry (first sort)
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Katcha Drain
Surface Drains in Soil Construction of unlined surface drain of average cross sectional area 0.4 sqm in soil to specified lines, grades, levels and dimensions as per approved design and to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 meters (average lead 25 meters) A) Mechanical means
M/S R D ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid