Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹5.1 L+₹14,726.32 (2.95%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹5.2 L+₹19,011.76 (3.81%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹5.2 L+₹22,432.32 (4.50%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹5.3 L+₹26,258.04 (5.26%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.8 L
EMD Value
₹16,000
Closing Date
20 Jul 2026, 4:00 pmClosed
Executive Engineer RnB Division Kupwara
Executive Engineer RnB Division Sulkote Kupwara
Improvement of link road from Main road Bungam Batpora to Bibi Sahib Ziyart
2026_PWDJK_315701_4
NIT No. 25 of 2026-27 of RnB Division Kupwara
Open Tender
Civil Works
Item Rate
21 days
Bungam Batpora
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer RnB Division Kupwara
₹16,000
22 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing/ laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level 1:4:8 (1 cement:4 coarse aggregate:8 graded stone aggregates 40mm nominal Size) | 34.16 | cum | 5,202.9 | ₹1,77,731.06 |
| 2 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level, 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 51.24 | cum | 7,788.4 | ₹3,99,077.62 |
| 3 | Steel reinforcement for R.C.C. work ready to use "cut and bend"rebars of approved make from factory/workshop to construction site including placing in position and binding all
complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,281 | kg | 123.2 | ₹1,57,819.2 |
| 4 | Carriage of materials by mechanical transport from source upto site of work including loading, unloading and stacking a) Sand for an lead of 30km | 40.14 | cum | 548.19 | ₹22,004.35 |
| 5 | b)Agg. for lead of 10 km | 74.3 | cum | 303.34 | ₹22,538.16 |
stage.html
html • 0.04 MB
finance_1025121.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_1025121.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .