Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.3 L M/R to DPRA Longwood Shimla during 2022-23. SH: Welcome maintenance, repair of wooden flooring and replacement of drainage pipeline of roof at Batslay-I at Longwood Shimla. | M/R to DPRA Longwood Shimla during 2022-23. SH: Welcome maintenance, repair of wooden flooring and replacement of drainage pipeline of roof at Batslay-I at Longwood Shimla. | L1 | - | |
| 2 | L2₹5.5 L+₹19,406 (3.65%) M/R to DPRA Longwood Shimla during 2022-23. SH: Welcome maintenance, repair of wooden flooring and replacement of drainage pipeline of roof at Batslay-I at Longwood Shimla. | M/R to DPRA Longwood Shimla during 2022-23. SH: Welcome maintenance, repair of wooden flooring and replacement of drainage pipeline of roof at Batslay-I at Longwood Shimla. | L2 | - | |
| 3 | L3₹5.8 L+₹44,413 (8.36%) M/R to DPRA Longwood Shimla during 2022-23. SH: Welcome maintenance, repair of wooden flooring and replacement of drainage pipeline of roof at Batslay-I at Longwood Shimla. | M/R to DPRA Longwood Shimla during 2022-23. SH: Welcome maintenance, repair of wooden flooring and replacement of drainage pipeline of roof at Batslay-I at Longwood Shimla. | L3 | - | |
| 4 | L4₹6.0 L+₹72,122 (13.6%)Financial bid opened M/R to DPRA Longwood Shimla during 2022-23. SH: Welcome maintenance, repair of wooden flooring and replacement of drainage pipeline of roof at Batslay-I at Longwood Shimla. | M/R to DPRA Longwood Shimla during 2022-23. SH: Welcome maintenance, repair of wooden flooring and replacement of drainage pipeline of roof at Batslay-I at Longwood Shimla. | L4 | Financial bid opened | |
| 5 | L5₹6.2 L+₹86,895 (16.4%) M/R to DPRA Longwood Shimla during 2022-23. SH: Welcome maintenance, repair of wooden flooring and replacement of drainage pipeline of roof at Batslay-I at Longwood Shimla. | M/R to DPRA Longwood Shimla during 2022-23. SH: Welcome maintenance, repair of wooden flooring and replacement of drainage pipeline of roof at Batslay-I at Longwood Shimla. | L5 | - |
| Sl No | Description | Qty | Unit | AMIT SHARMA SHUBASH NAGAR L2 | Bhuvan Ahuja L1 | Dhurender Kumar Gupta L4 | Anil Kumar L3 | Vikas Kumar L7 | Ashwani Vij L5 | Dushyant Kumar L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Civil Work | - | - | -42.99 ₹5,50,432 | -45 ₹5,31,026 Lowest | -37.53 ₹6,03,148 | -40.4 ₹5,75,439 | -22 ₹7,53,091 | -36 ₹6,17,921 | -27 ₹7,04,816 |
Tender Value
₹9.7 L
EMD Value
₹19,310
Closing Date
24 Sept 2022, 3:00 pmClosed
AE-C-4
Er. Rohit Jorwal
Kennedy Cottage Shimla
M/R to DPRA Longwood Shimla during 2022-23. SH: Welcome maintenance, repair of wooden flooring and replacement of drainage pipeline of roof at Batslay-I at Longwood Shimla.
19495
103/2022-23/EE-I/AE-I/Shimla
OPEN
Civil Works - Others
NCB
30 days
Shimla, Himachal Pradesh
10 documents required · 10 mandatory
₹19,310
Not Applicable
24 Sept 2022
17 Sept 2022
24 Sept 2022
24 Sept 2022
23 Sept 2022
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Index.pdf
document • 0.83 MB
NoticeInvitingTender.pdf
document • 5.46 MB
PerformaforQuotingtherates.pdf
document • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .