| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹44.5 LAdmitted-Finance | -0.45% | ₹44.5 L | L1 | Admitted-Finance |
| 2 | L2₹45.6 L+₹1.1 L (2.46%)Admitted-Finance | +2.00% | ₹45.6 L+₹1.1 L (2.46%) | L2 | Admitted-Finance |
| 3 | L3₹51.4 L+₹6.9 L (15.5%)Admitted-Finance | +15.00% | ₹51.4 L+₹6.9 L (15.5%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Site Visit Certificate not uploaded |
Tender Value
₹44.7 L
EMD Value
₹89,400
Closing Date
14 Sept 2026, 4:00 pmClosed
Er Ranjit Singh
OFFICE OF THE XEN PWD RNB DIVISION RAMBAN
BOQ
2026_PWDJK_323100_4
E-NIT No. 52 Of 2026-27 Dated 01-09-2026
Open Tender
Civil Works
Percentage
60 days
Sanasar
NIT
2 documents required · 2 mandatory
₹600
Yes
XEN PWD RNB DIVISION RAMBAN
₹89,400
Yes
21 Sept 2026
2 Sept 2026
15 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Dry stone pitching in aprons, drains, etc. including stacking of serviceable material & disposal of unserviceable material, stacking /disposal lead upto 100 meters. | 116.5 | Cum | 1,151.6 | ₹1,34,161.4 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix | 11.65 | Cum | 1,725.2 | ₹20,098.58 |
| 0.0 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge:1:4:8 or leaner mix (i/c equivalent design mix) | 20.39 | Cum | 1,064.55 | ₹21,706.17 |
| 4 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 1.88 | Cum | 1,740.45 | ₹3,272.05 |
| 5 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead. | 86.4 | Kg | 4.3 | ₹371.52 |
| 6 | Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete. | 511.16 | Sqm | 713.7 | ₹3,64,814.89 |
| 7 | Providing and laying 10mm thick, l cement: 3 fine sand mortar slurry' on beds and side slopes (prior to laying In-situ concrete lining) | 511.16 | Sqm | 77.75 | ₹39,742.69 |
| 8 | Dry stone pitching 22.5cm thick laid in courses required profile with hammer dressed stone having no side less than 15cm, with minimum depth of 20cm including preparing the bedding surface etc. all complete (Payment for stone to be made separately). | 1,015.4 | Sqm | 503 | ₹5,10,746.2 |
| 9 | Supplying & stacking of hard stone (for stone pitching) 22.5cm thick at site. | 111.97 | Cum | 936.55 | ₹1,04,865.5 |
| 10 | Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 6.00 cum per 100 sq m on horizontal/side slopes; complete including curing. | 1,015.4 | Sqm | 327.6 | ₹3,32,645.04 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_1087393.xls
BOQ • 0.29 MB
Extensionnsana.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .