| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | -27.86% | ₹2.0 Cr | L1 | Admitted-Finance |
Tender Value
₹2.8 Cr
EMD Value
₹5.5 L
Closing Date
3 Aug 2026, 6:00 pmClosed
EE B
JDA Jaipur
Patch repair work in Zone -B area JDA, Jaipur (ARC)
2026_JDAJP_575047_1
JDA EE B 2026-27 NIB 10
Open Tender
Civil Works
Percentage
365 days
JDA Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Online
₹5.5 L
Yes
7 Aug 2026
15 Jul 2026
7 Aug 2026
15 Jul 2026
3 Aug 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRD Specification Clause 301.3 | - | Cum | - | - |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD Specification Clause 401. For Grading II Material | - | Cum | - | - |
| 3 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and MoRD Specification Clause 406. By Mechanical Means with all lead | - | Cum | - | - |
| 4 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRD Specification Clause 502 | - | Sqm. | - | - |
| 5 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | - | Sqm. | 1 | - |
| 6 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | - | Sqm. | - | - |
| 7 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specifications Clause 505 complete in all respects. for Grading II ( 26.50 mm (Nominal Size ) | - | P.MT | - | - |
| 8 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified rading,premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 507 complete in all respects for Grading-II (13 mm nominal size) Bitumen (VG-30) | - | P.MT | - | - |
| 9 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. | 0.58 | P.Kg | - | - |
| 10 | Pavement milling (cold planning, asphalt milling, or profiling) of existing all kinds of bituminous surfaces (Mastic, DBM, BC, SDBC, SMA, PMC etc.) with specially designed equipment up to the specified depth of bituminous layer as per designed level & grade, including disposal of milling material with all lead (minimum 20 km from site) and lift complete as per specification. The surface shall be free of bumps, ruts, and other imperfections including the arrangement of traffic diversion if required. Milling material recovered, shall be loaded directly onto trucks/trolleys from the milling machine & shall be the property of the contractor. The milled road surface shall be swept clean prior to opening to traffic. The milling machine is power-operated, self-propelled, and self-sufficient in power, traction, and stability to remove a thickness of BT surface to a specified depth. The machine should be able to provide a uniform profile and cross slope, and capable of accurately and automatically establishing profile grades along each edge of the machine by referencing from the existing pavement without damaging the bottom CC surface if any. The machine should have an automatic system for controlling grade elevation and cross slope etc. | - | Cum | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_1022745.xls
BOQ • 0.34 MB
Doc10PatchRCEEB.pdf
Tender Documents • 1.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .