Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Finance | -0.05% | ₹4.8 L | L1 | Admitted-Finance |
| 2 | L2₹4.8 L+₹193.28 (0.04%)Admitted-Finance | -0.01% | ₹4.8 L+₹193.28 (0.04%) | L2 | Admitted-Finance |
| 3 | L3₹4.8 L+₹241.60 (0.05%)Admitted-Finance 357 KOTKAPURA ROAD STREET NO 8 MUKTSAR PUNJAB 152026 | SRI MUKTSAR SAHIB | PUNJAB | 152026 | +0.00% | ₹4.8 L+₹241.60 (0.05%) | L3 | Admitted-Finance |
Tender Value
₹4.8 L
EMD Value
₹48,400
Closing Date
16 Jul 2026, 2:00 pmClosed
Executive Officer
Nagar Palika Parishad Modinagar
WARD NO. 26 MOH. GOVINDPURI ME RATAN KE MAKAN SE RAJU TAK NALA VA POOJA MEDICAL STORE SE RATAN TAK SIDE PATRI PAR INTERLAACK TILES KA NIRMAN KARYA
2026_DOLBU_1167998_28
670/NPPModinagar/ETender/2026
Open Tender
Civil Works
Percentage
60 days
Modinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Officer
₹48,400
25 Aug 2026
10 Jul 2026
16 Jul 2026
10 Jul 2026
16 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in embankment or filling in ordinary soil with cartage of earth from 3 km as per SI No.-253(a), 261(b) & 231(a). i/c carted earth upto 3 km i/c all | 12.3 | Cum | 280.5 | ₹3,450.15 |
| 2 | Construction of granular sub base by providing well graded material spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achive desire density comple | 6.15 | Cum | 3,195.7 | ₹19,653.56 |
| 3 | P.C.C work in 1:6:12 Cement, f/ sand, and 40 mm brick ballast including supply of all materials, labour , T & P etc. As per S.I.No 273 | 2.28 | Cum | 4,000 | ₹9,120 |
| 4 | M-150 Class B/W in 1:4 cement, coarse sand 1.25 F.M motar in foundation and plinth including supply of all materials, labour , T & P etc. As per P.W.D. S.I. No. 305(a) | 33.98 | Cum | 6,713.4 | ₹2,28,121.33 |
| 5 | Supply and Laying of 80 mm thick precast cement concrete I- shaped interlocking paver blocks with top layer of minimum 8 mm thickness having plan dimension 200x(160+120)mm O.P. cement, smooth high gloss finish, skid resistant; manufactured from rubber moulds through vibro-compression mechanism. The compressive strength of concrete paver block shall not be less than 30MPA (M-30) and weight 5.0 Kg per no . confirming to IS:15658-2006 including all and i/c 4cm sand layer | 61.5 | Sqm | 955.5 | ₹58,763.25 |
| 6 | R.C.C Work 1:1.5:3 in cement,c.sand and 20 mm stone grit in door sills, chaukhat, boundry post etc as per si no 282(a) for Road xing | 2.52 | Cum | 7,528.5 | ₹18,971.82 |
| 7 | M.S.Iro work as reinforcement in R.C.C work i/c all 1.00 % of R.C.C work | 1.98 | qtl | 7,099 | ₹14,056.02 |
| 8 | 12 mm thick plaster in 1:4 cement and coarse sand mortar on brick work minimum thickness not to be less than 1 cm. including supply of all materials, labour,T & P etc. As per SI No 584(a) | 117 | Sqm | 188.5 | ₹22,054.5 |
| 9 | P.C.C work in 1:2:4 Cement, c/ sand, and 20 mm stone grit including supply of all materials, labour , T & P etc. As per S.I.No 279(a) | 4.42 | Cum | 6,867.4 | ₹30,353.91 |
| 10 | Supply and fixing of Granite stone with complete work details engraved | 1 | Nos | 5,000 | ₹5,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.37 MB
BOQ_2191354.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .