Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical VARANASI | VARANASI | UTTAR PRADESH | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical Accepted |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹62.4 L
EMD Value
₹1.2 L
Closing Date
12 Mar 2026, 6:00 pmClosed
Executive Engineer (West), UPSRTC Lucknow
Executive Engineer (West), U.P State Road Transport Corporation, H.Q Lucknow
Construction of Electric Bus Charging Station at Bus station Tappal Aligarh
2026_UPSRT_1120816_1
147/B/DA/W/Tender/2026
Open Tender
Civil Works
Percentage
90 days
Tappal Aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,658
Executive Engineer (West), UPSRTC Lucknow
₹1.2 L
23 Apr 2026
27 Feb 2026
13 Mar 2026
27 Feb 2026
12 Mar 2026
27 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, driving with hydraulic piling rigs with power units and installing driven cast-insitu reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) : 400 mm dia piles (DSR 20.1.1) | 30 | RM | 2,090.77 | ₹62,723.1 |
| 2 | Extra over single under ream for providing additional bulbs in under reamed piles, under specified diameter(only the nos. of extra bulbs are to be paid) 400 mm dia piles (DSR 20.4.2) | 10 | Nos. | 2,209.74 | ₹22,097.4 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)(DSR 5.1.2) | 8.06 | CuM | 6,835.04 | ₹55,090.42 |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)(DSR 5.2.2) | 3 | CuM | 8,200.57 | ₹24,601.71 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (DSR 5.3) | 26.26 | CuM | 8,693.64 | ₹2,28,294.99 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass B25 concrete (DSR 5.9.1) | 53.45 | Sqm | 296.31 | ₹15,837.77 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers (DSR 5.9.5) | 89.37 | Sqm | 556.43 | ₹49,728.15 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts (DSR 5.9.6) | 34.3 | Sqm | 726.37 | ₹24,914.49 |
| 9 | Centering & shuttering I/c structuring, propping etc. & removal of foam for Suspended floors, roofs, landings, balconies and access platforms (5.9.3) | 98.29 | Sqm | 700.64 | ₹68,865.91 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars (DSR 5.22.1.) | 3,251.73 | Kg | 80.93 | ₹2,63,162.51 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
Tender_documentsTappal.pdf
Tender Documents • 2.46 MB
BOQ_2085026.xls
BOQ • 3.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .