Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.2 CrAdmitted-Finance BEHIND HERO HONDA SHOWROOM DUDHANI BHAGALPUR ROAD DUMKA | DUMKA | JHARKHAND | 814101 | ₹75.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹76.1 CrAdmitted-Finance | ₹76.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹83.8 CrAdmitted-Finance P 26 CITY CENTER SECTOR 4 BOKARO | ₹83.8 Cr | L3 | Admitted-Finance |
| 4 | L4₹90.3 CrAdmitted-Finance PATHARGAMA GODDA | PATHARGAMA | GODDA | JHARKHAND | ₹90.3 Cr | L4 | Admitted-Finance |
| 5 | L5₹92.1 CrAdmitted-Finance IIIRD B2 FLAT NO 8 IIND FLOOR NEHRU NAGAR GZB 201001 U P | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹92.1 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Ganga Construction L6 | Sri Ram Enterprises L7 | CLASSIC ENGICON PVT. LTD. L9 | M/S S K TEKRIWAL L4 | HARI NANDAN CHOUDHARY L1 | M & S PAVING PRIVATE LIMITED L3 | SRMV CONSTRUCTION PVT LTD L10 | Mayasheel Ventures Limited L5 | M/s SILDILIYA CONSTRUCTION L2 | AMITABH CONSTRUCTION PVT LTD L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness.) (i)By Mechanical means :- (A) In area of light jungle | 15.09 | Hec | 1,31,802.61 ₹19.9 L | 1,38,200.8 ₹20.9 L | 1,40,657.7 ₹21.2 L | 1,27,963.7 ₹19.3 L | 30,000 ₹4.5 L | 20,000 ₹3.0 L | 1,42,039.71 ₹21.4 L | 1,50,000 ₹22.6 L | 20,000 ₹3.0 L | 1,40,133.05 ₹21.1 L |
| 2.00 | Cutting of Trees, including Cutting of Trunks,Branches and removal (Cutting of Trees including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit .
Girth for 300 mm to 600 mm | 85 | Each | 631.08 ₹53,641.89 | 661.72 ₹56,246.20 | 673.48 ₹57,245.79 | 612.7 ₹52,079.50 | 100 ₹8,500 | 100 ₹8,500 | 680.1 ₹57,808.25 | 800 ₹68,000 | 612.7 ₹52,079.50 | 670.97 ₹57,032.26 |
| 3.00 | Cutting of Trees, including Cutting of Trunks,Branches and removal (Cutting of Trees including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit .
Girth for 600 mm to 900 mm | 53 | Each | 953.37 ₹50,528.50 | 999.65 ₹52,981.45 | 1,017.42 ₹53,923.23 | 925.6 ₹49,056.80 | 100 ₹5,300 | 100 ₹5,300 | 1,027.42 ₹54,453.05 | 1,200 ₹63,600 | 925.6 ₹49,056.80 | 1,013.62 ₹53,722.10 |
| 4.00 | Cutting of Trees, including Cutting of Trunks,Branches and removal (Cutting of Trees including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit .
Girth for 900mm to 1800 mm | 19 | Each | 1,477.84 ₹28,079.04 | 1,549.58 ₹29,442.02 | 1,577.13 ₹29,965.51 | 1,434.8 ₹27,261.20 | 100 ₹1,900 | 100 ₹1,900 | 1,592.63 ₹30,259.93 | 1,600 ₹30,400 | 1,434.8 ₹27,261.20 | 1,571.25 ₹29,853.74 |
| 5.00 | Removal of telephone/ Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department , disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately | 213 | Each | 190.65 ₹40,609.09 | 199.91 ₹42,580.83 | 203.46 ₹43,337.39 | 185.1 ₹39,426.30 | 100 ₹21,300 | 100 ₹21,300 | 205.46 ₹43,763.19 | 2,000 ₹4.3 L | 185.1 ₹39,426.30 | 202.7 ₹43,175.74 |
| 6.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) Lime concrete, cement concrete grade M-10 and below | 290.64 | M3 | 384.5 ₹1.1 L | 403.16 ₹1.2 L | 410.33 ₹1.2 L | 373.3 ₹1.1 L | 200 ₹58,128 | 100 ₹29,064 | 414.36 ₹1.2 L | 200 ₹58,128 | 373.3 ₹1.1 L | 408.8 ₹1.2 L |
| 7.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) Cement concrete Grade M-15 & M-20 | 666.64 | M3 | 465.97 ₹3.1 L | 488.59 ₹3.3 L | 497.28 ₹3.3 L | 452.4 ₹3.0 L | 200 ₹1.3 L | 100 ₹66,664 | 502.16 ₹3.3 L | 200 ₹1.3 L | 452.4 ₹3.0 L | 495.42 ₹3.3 L |
| 8.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres, Removing all type of Hume pipes and stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. Upto 600mm dia | 7.5 | M | 714.51 ₹5,358.83 | 749.2 ₹5,619 | 762.52 ₹5,718.86 | 693.7 ₹5,202.75 | 200 ₹1,500 | 100 ₹750 | 770.01 ₹5,775.05 | 200 ₹1,500 | 693.7 ₹5,202.75 | 759.67 ₹5,697.53 |
| 9.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres Removing all type of Hume pipes and stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. Above 600mm to 900mm dia | 30 | M | 819.88 ₹24,596.40 | 859.68 ₹25,790.40 | 874.96 ₹26,248.90 | 796 ₹23,880 | 200 ₹6,000 | 100 ₹3,000 | 883.56 ₹26,506.80 | 300 ₹9,000 | 796 ₹23,880 | 871.7 ₹26,150.99 |
| 10.00 | Scraping plaster in lime or cement mortar from Brick/Stone Masonry | 39.98 | M2 | 17 ₹679.38 | 17.82 ₹712.35 | 18.14 ₹725.02 | 16.5 ₹659.59 | 10 ₹399.75 | 10 ₹399.75 | 18.32 ₹732.14 | 30 ₹1,199.25 | 16.5 ₹659.59 | 18.07 ₹722.31 |
Tender Value
₹90.3 Cr
EMD Value
₹90.3 L
Closing Date
9 Oct 2025, 12:00 pmClosed
Executive Engineer, Road Division, Giridih
Executive Engineer, Road Division, Giridih
Widening and Strengthening/Re-Construction of Dalpathdih PWD Road to Khatponk, Khoro, Baraipat, Nayanpur Road (under CIRF) Under Road Division, Giridih For The Year 2025-26 (Job. No. CRF-JHR-2025-26-75)
2025_CECOM_104786_1
RCD/GIRIDIH/1003/2025-26
Open Tender
Civil Works
480 days
Tisri
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹90.3 L
Yes
chief Engineer (comm), RCD, Ranchi Jharkhand
30 Apr 2026
12 Sept 2025
10 Oct 2025
12 Sept 2025
9 Oct 2025
19 Sept 2025
18 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
SBDPart-1__e-compliant_MoRTH_portal_CRF_TISHRI.pdf
Tender Documents • 11.29 MB
SBDPart-2__e-compliant_MoRTH_portal_CRF_TISHRI.pdf
Tender Documents • 10.97 MB
BOQ_141011.xls
BOQ • 0.34 MB
Addendum.pdf
Tender Documents • 26.55 MB
Download all tender documents and submit your bid