Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-AOC | ₹3.3 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹3.5 Cr+₹15.8 L (4.76%)Rejected-Finance 70 INDUSTRIAL AREA PHASE 1 PANCHKULA PANCHKULA HARYANA 134109 | PANCHKULA | HARYANA | 134109 | ₹3.5 Cr+₹15.8 L (4.76%) | L2 | Rejected-Finance Higher rates |
| 3 | L3₹4.2 Cr+₹82.1 L (24.7%)Rejected-Finance BALLIA UTTAR PRADESH | BALLIA | UTTAR PRADESH | 221701 | ₹4.2 Cr+₹82.1 L (24.7%) | L3 | Rejected-Finance Higher rates |
| Sl No | Description | Qty | Unit | Chandel Construction Company L2 | Eco Paryavaran Engineers And Consultants Pvt. Ltd. L1 | S.R.Paryavaran Engineers Pvt Ltd L3 |
|---|---|---|---|---|---|---|
| 1.00 | Design, Construction, Installation, commissioning of 1 MLD STP at IFP Moga based on any suitable, sustainable and proven technology (MBBR/MBR/SBR) at IFP Moga and other appurtenant works on turnkey basis as per DNIT including Operation & Maintenance for a period of 60 months after stabilization period of 3 months or more. | 1 | Job | 4,15,10,701 ₹4,15,10,701 | 3,33,00,000 ₹3,33,00,000 Lowest | 3,48,84,000 ₹3,48,84,000 |
| 1.01 | Credit for sludge | 1 | LS | 1,000 ₹-1,000 Lowest | - | - |
| 1.02Guaranteed Power Consumption for Defect Liability Period of 1 (one) year and 4 years of O&M to be quoted by the bidder for per year by the bidder in KVAh. | ||||||
| 1.03 | For 1st year i.e. Defect Liability Period | 1 | KVAh | 450 ₹13,96,125 | 325 ₹10,08,312.5 Lowest | 850 ₹26,37,125 |
| 1.04 | For 2nd year of O & M | 1 | KVAh | 450 ₹13,96,125 | 350 ₹10,85,875 Lowest | 850 ₹26,37,125 |
| 1.05 | For 3rd year of O & M | 1 | KVAh | 450 ₹13,96,125 | 375 ₹11,63,437.5 Lowest | 850 ₹26,37,125 |
| 1.06 | For 4th year of O & M | 1 | KVAh | 450 ₹13,96,125 | 375 ₹11,63,437.5 Lowest | 850 ₹26,37,125 |
| 1.07 | For 5th year of O & M | 1 | KVAh | 450 ₹13,96,125 | 375 ₹11,63,437.5 Lowest | 850 ₹26,37,125 |
| 2.00 | Cost of the area required for setting up of STP in sq. yard (i.e. Rs. 6000/ sq.yrd x Area required in sq. yrd (to be informed by the bidder)) | 1 | Lumpsum | 60,00,000 ₹60,00,000 | 36,00,000 ₹36,00,000 Lowest | 1,08,00,000 ₹1,08,00,000 |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
23 Jul 2025, 11:00 amClosed
Executive Engineer I
PSIEC Chandigarh
Design Construction Installation commissioning of 1 MLD STP at IFP Moga
2025_IC_143927_1
PSIEC/STP/Moga
Open Tender
Miscellaneous Works
Lump-sum
365 days
IFP Moga
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Yes
₹5 L
Yes
15 Oct 2025
3 Jul 2025
23 Jul 2025
3 Jul 2025
23 Jul 2025
3 Jul 2025
Amount
Design, Construction, Installation, commissioning of 1 MLD STP at IFP Moga based on any suitable, sustainable and proven technology (MBBR/MBR/SBR) at IFP Moga and other appurtenant works on turnkey basis as per DNIT including Operation & Maintenance for a period of 60 months after stabilization period of 3 months or more.
Credit for sludge
Guaranteed Power Consumption for Defect Liability Period of 1 (one) year and 4 years of O&M to be quoted by the bidder for per year by the bidder in KVAh.
For 1st year i.e. Defect Liability Period
For 2nd year of O & M
For 3rd year of O & M
For 4th year of O & M
For 5th year of O & M
Cost of the area required for setting up of STP in sq. yard (i.e. Rs. 6000/ sq.yrd x Area required in sq. yrd (to be informed by the bidder))
Chandel Construction Company (BID ID -663720)
S.R.Paryavaran Engineers Pvt Ltd (BID ID -663849)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .