Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.8 LAdmitted-Finance | -15.00% | ₹9.8 L | L1 | Admitted-Finance |
| 2 | L1₹9.8 LAdmitted-Finance | -15.00% | ₹9.8 L | L1 | Admitted-Finance |
| 3 | L1₹9.8 LAdmitted-Finance | -15.00% | ₹9.8 L | L1 | Admitted-Finance |
| 4 | L1₹9.8 LAdmitted-Finance | -15.00% | ₹9.8 L | L1 | Admitted-Finance |
| 5 | L1₹9.8 LAdmitted-Finance | -15.00% | ₹9.8 L | L1 | Admitted-Finance |
Tender Value
₹11.5 L
EMD Value
₹57,593
Closing Date
1 Jun 2026, 3:00 pmClosed
CHIEF ENGG NAGAR NIGAM MEERUT
NNM
Road work by CC from house no. K 136 to house no. K 120 and from house no. K 138 to house no. K 150 and the lanes connected to them in K Block, Ward-61, Shastri Nagar.
2026_NNMEE_1150700_12
243/SNV-103-L3/2026
Open Tender
Civil Works
Fixed-rate
60 days
MEERUT
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,360
MUNICIPAL COMMISSIONER NAGAR NIGAM
₹57,593
4 Jul 2026
22 May 2026
1 Jun 2026
22 May 2026
1 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalling of rcc and b/w | 1.72 | Cum | 2,634.56 | ₹4,531.44 |
| 2 | Deduction cost of old bricks | 99.24 | Sqm | 147.89 | ₹14,676.6 |
| 3 | Deduction cost of old bricks bats | 17.36 | Cum | 5,468.06 | ₹94,925.52 |
| 4 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50M. and lead upto 30M. and including filling watering and ramming of excavated earth into the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30M. from the foundation trenches.(S.I. 251(a) ) | 175.32 | Sqm | 265.11 | ₹46,479.09 |
| 5 | Disposal of malwa including 12 km lead | 8 | Cum | 5,771.96 | ₹46,175.68 |
| 6 | Concrete with 2.5 cm. gauge stone Ballast course sand . and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. T & P etc. Required for proper completion the work SI no.281 | 1.44 | Cum | 6,710.76 | ₹9,663.49 |
| 7 | As in item 283 above but in R.C.C. Raft foundation and footing with 4 cm. Gauge stone ballast. (S.I. 287) | 1.13 | Qtl | 8,001.06 | ₹9,041.2 |
| 8 | As in item 283 above but in R.C.C. column in 1:1½:3 (S.I. 289) | 5.52 | Sqm | - | - |
| 9 | As in item 5 above but in R.C.C. T-beam & slab roof . (S.I. 284 a) | 5.57 | Cum | 1,366.75 | ₹7,612.8 |
| 10 | M-150 brick work in 1:3 one cement and three fcoarse sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work S.I No.307 | 5.57 | Cum | 947.37 | ₹5,276.85 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
NNMT1.pdf
Tender Documents • 6.40 MB
12.pdf
Tender Documents • 0.52 MB
BOQ_2155242.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .