Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.8 LAccepted-AOC AGAM THIMIRI PANCHAYAT UNION | 1 | Accepted-AOC lowest amount quoted | |
| 2 | 2₹9.8 L+₹102.66 (0.01%)Rejected-AOC 456 1 AROOR KOOT ROAD SORAIYUR POST KALAVAI TALUK RANIPET 632318 | RANIPET | TAMIL NADU | 632318 | 2 | Rejected-AOC highest amount quoted |
Tender Value
₹9.9 L
EMD Value
₹9,900
Closing Date
25 Nov 2024, 3:00 pmClosed
Block developement officer thimiri
Block developement office thimiri
Construction of Ceremony shed at Pattanam H/O Pattanam Panchayat in Thimiri panchayat union
2024_RDTN_502848_1
A2/2396/2023
Open Tender
Civil Works
Item Wise
180 days
Block developement office thimiri
Construction of Ceremony shed at Pattanam H/O Pattanam Panchayat in Thimiri panchayat union
2 documents required · 2 mandatory
₹0
₹9,900
Yes
Block developement office thimiri
19 Feb 2025
20 Nov 2024
25 Nov 2024
20 Nov 2024
25 Nov 2024
20 Nov 2024
20 Nov 2024
Amount
Construction of Ceremony shed at Pattanam H/O Pattanam Panchayat in Thimiri panchayat union
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc.
RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.
Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc.
Column above grade beam
Roof slab
Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete.
Weathering coarse concrete using 20mm size broken brick jelly with in pure slaked lime over the RCC Roof in the proportion of 32 : 12 1/2 by volume laid in layer beating the concrete with the wooden batters etc as per standard specifications .
Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc.
Plastering with cement mortar 1:3, 10mm thick including cost and conveyance and all labour charges etc.
Paving the floor with scratch proof ceramic tiles including all cost and conveyance and etc complete
Painting two coat with approved quality of distemper with colour over one coat of white cement for primier coat for the base including preparing surface and all materials cost labour etc
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc complete.
Provision for Name Board
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K Senthilkumar (BID ID -1191927)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .