| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.8 LAdmitted-Finance ERODE 638 152 | ERODE | TAMIL NADU | 638152 | L1 | Admitted-Finance | |
| 2 | L2₹58.5 L+₹1.7 L (3.02%)Admitted-Finance 9 A PONGALIVALASU KODUMUDI POST ERODE 638 151 | KARUR | TAMIL NADU | 638151 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Not Satisfied |
| Sl No | Description | Qty | Unit | Sri Balaji Constructions L2 | VRR CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | |||||
| 2.00 | Column | 410 | M2 | 1,374.25 ₹5,63,442.5 | 1,333.95 ₹5,46,919.5 Lowest |
| 3.00 | Plinth and tie beam | 330 | M2 | 381.74 ₹1,25,974.2 | 370.55 ₹1,22,281.5 Lowest |
| 4.00 | Providing and laying in position ,Standardised Concrete Mix M-25 Grade in accordance with IS 456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser/ super plasticiser) in recommended proportions as per IS:9103 to accelerate , retard setting of concrete, improve workability without impairing strength and durability with about ( 5 Cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.3 cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying ,Vibrating with mechanical vibrators , finishing ,curing , etc. and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming extra, etc complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. ( No seperate payment will be made by the Department for the excess usage of materials). | 100 | M3 | 8,998.34 ₹8,99,834 | 8,734.5 ₹8,73,450 Lowest |
| 5.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 13,300 | Kg | 96.02 ₹12,77,066 | 93.2 ₹12,39,560 Lowest |
| 6.00 | Brick work in Cm 1:5 mix using 2nd class chmber burnt work including cost and conveyance of all materials and all labour cahrges etc complete | 135.95 | M3 | 7,740.29 ₹10,52,292.43 | 7,513.34 ₹10,21,438.57 Lowest |
| 7.00 | Plastering in Cm 1:5 -12mm thick including cost and conveyance of all materials and including all labour cahrges etc complete | 1,690 | M2 | 298.44 ₹5,04,363.6 | 289.69 ₹4,89,576.1 Lowest |
| 8.00 | Painting two coats using cement paint for prime coat including cost and conveyance of all materials and including all labour charges etc complete | 1,700 | M2 | 169.95 ₹2,88,915 | 164.97 ₹2,80,449 Lowest |
| 9.00 | Painting two coats using exterior grade emulsion paint with prime coat including cost and conveyance of all materials and including all labour charges etc complete | 1,690 | M2 | 277.48 ₹4,68,941.2 | 269.35 ₹4,55,201.5 Lowest |
| 10.00 | Provision Art painting works of Wall | 1 | no | 1,54,500 ₹1,54,500 | 1,49,970 ₹1,49,970 Lowest |
Tender Value
₹70 L
EMD Value
₹70,000
Closing Date
28 May 2025, 3:00 pmClosed
The Commissioner Tambaram Corporation
Zone 4 Perungalathur
Construction of Compound wall West south and North side of proposed New Corporation Office building Zone 4 in Tambaram City Municipal Corporation
2025_DMA_561357_2
340/2025/E1/Z4
Open Tender
Civil Works
Works
60 days
Zone 4
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹70,000
15 Sept 2025
24 May 2025
28 May 2025
24 May 2025
28 May 2025
24 May 2025
Amount
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38
Column
Plinth and tie beam
Providing and laying in position ,Standardised Concrete Mix M-25 Grade in accordance with IS 456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser/ super plasticiser) in recommended proportions as per IS:9103 to accelerate , retard setting of concrete, improve workability without impairing strength and durability with about ( 5 Cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.3 cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying ,Vibrating with mechanical vibrators , finishing ,curing , etc. and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming extra, etc complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. ( No seperate payment will be made by the Department for the excess usage of materials).
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Brick work in Cm 1:5 mix using 2nd class chmber burnt work including cost and conveyance of all materials and all labour cahrges etc complete
Plastering in Cm 1:5 -12mm thick including cost and conveyance of all materials and including all labour cahrges etc complete
Painting two coats using cement paint for prime coat including cost and conveyance of all materials and including all labour charges etc complete
Painting two coats using exterior grade emulsion paint with prime coat including cost and conveyance of all materials and including all labour charges etc complete
Provision Art painting works of Wall
Provision for electrical and lighting works
Sri Balaji Constructions (BID ID -1353275)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .