| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 LAccepted-Finance | 1 | Accepted-Finance generally found in order |
Tender Value
₹44,050
Closing Date
22 Jul 2024, 2:00 pmClosed
THE EE/U/D/TIN
EE/U/D/TIN
Execution of contract towards Extension of supply works for Capital in Construction - I section, AEE/UG Cable/urban/Tirunelveli EDC
2024_EB_460974_1
EE/D/ U/ TIN ETW-016/24-25
Open Tender
Electrical and Maintenance Works
Works
180 days
TIRUNELVELI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Yes
6 Aug 2024
6 Jul 2024
23 Jul 2024
6 Jul 2024
22 Jul 2024
6 Jul 2024
Amount
Normal ground Excavation of pole pit (1.25m * 0.5m*1.5m) 7.32m, 7.5m, 8m, 8.23m Poles
Normal Ground Erection of 7.32m, 7.5m, 8m, 8.23m Poles
Rocky ground Excavation of pole pit (1.25m * 0.5m*1.5m) 7.32m, 7.5m, 8m, 8.23m Poles
Rocky ground Erection of 7.32m, 7.5m, 8m, 8.23m Poles
Normal Ground Excavation of pole pit (1.25m * 0.6m*1.83m) 9m, 9.14m Poles
Normal Ground Erection of 9m, 9.14m Poles
Normal Ground of Excavation of pole pits (1.25m*0.6m*1.83m) for RSJ pole 36"
Normal Ground of erection of 36" RSJ pole
Rocky Ground of Excavation of pole pit (1.25m * 0.6m*1.83m) 9m, 9.14m Poles
Rocky Ground of Erection of 9m, 9.14m Poles
Rocky Ground of Excavation of pole pits (1.25m*0.6m*1.83m) for RSJ pole 36"
Rocky Ground of erection of 36" RSJ pole
Transporting of poles from road side to pole pit -7.32m, 7.5m, 8m, 8.23m Poles
Transporting of poles from road side to pole pit -9m,9.14m RCC/PSC pole
Transporting of poles from road side to pole pit -36" RSJ pole
Loading and Unloading of Poles-7.32m, 7.5m, 8m, 8.23m Poles
Loading and Unloading of Poles-9m,9.14m RCC/PSC pole
Loading Unloading of poles-36" RSJ pole
Loading Unloading of line materials
Concreting of pole as per Board Standards (2'*2'*5'). The material such as sand, jelly, etc., have to be supplied by the contractor. Cement supplied by contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.compleat.
Coping of pole (0.6m*0.6m*0.35m)
Concreting of stay (0.3m * 0.3m * 1.5m) including materials except cement.
Coil earthing per pole & pole earthing
Normal Ground-Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for Stay Set)
Normal Ground -Erection of Stay Set
Rocky Ground-Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For Stay Set)
Rocky Ground -Erection of Stay Set
Fixing of V & Channel Cross Arm 3.5' including transporting of materials from road side to site
Fixing of V & Channel Cross Arm 4.5' including transporting of materials from road side to site
Fixing of 3 phase Cross Arm including transporting of materials from road side to site
Fixing of 1 phase Cross Arm including transporting of materials from road side to site
Fixing of HT LT TI Fitting including transporting of materials from road side to site
Erection of HT side arm with stud including transporting of materials from road side to site
Erection of LT side arm with stud including transporting of materials from road side to site
Fixing of insulator (per location) including transporting of materials from road side to site
Fixing of Tapping Channel X Arm
Fixing of 11 KV Disc
HT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/2.59 ACSR (1 Span/wire)
HT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/3.35ACSR (1 Span/wire)
HT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/4.09 ACSR (1 Span/wire)
For HT line clear works for 7/2.59 ACSR (1 Span/wire)
For HT line clear works for 7/3.35 ACSR (1 Span/wire)
For HT line clear works for 7/4.09ACSR (1 Span/wire)
LT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/2.59 ACSR (1 Span/wire)
LT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/3.35ACSR (1 Span/wire)
For LT line clear works for 7/2.59 ACSR (1 Span/wire)
For LT line clear works for 7/3.35 ACSR (1 Span/wire)
Spilt Neutral Guarding
Flat Guarding
Erection of Transformer /Dismantling upto 200 KVA
Erection of Transformer/Dismantling 250 KVA
Erection of feeder cable with open type fuse unit per feeder
Erection of feeder cable with open type fuse unit per feeder and for each addl feeder
Erection of feeder cable Bus bar arrangement with open type
Erection of DT metering
Loading of Distribution transformer below 250KVA
Unloading of Distribution transformer below 250KVA
Loading of Distribution transformer 250KVA
Unloading of Distribution transformer below 250KVA
Erection of centre Support ( incl. Concrete)
Dismantling of Center support
Alteration of clamps
Drilling less than 23 mm holes per hole/slatted hole
Cutting of channel
Cutting of Flat
Cutting of Angle
RSJ Pole Cutting
LT-Changing of pin point to cut point
HT-Changing of pin point to cut point
Erection of service connection materials -Single phase
Erection of service connection materials -Three Phase
Erection of CFL lamp
Erection street light switch box
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,
Dismantling of poles without concrete in damaged condition including grill separation etc.,
Providing jumpering at cut point
Tree clearance in HT or LT location For ordy. Tree clearance and Throng bushes & trees Each Labour /Head/Day
Tree clearance in HT or LT location For coconut Trees and palmrah tree each Labour /Head/Day
Set right of leaning of HT pole or LT pole including X arms, TI fittings
Resagging of Conductor 7/2.59
Resagging of Conductor 7/3.35
Resagging of Conductor 7/4.09
Erection of Tapping Structure ( Double pole) complete as per TNEB standard including painting
Erection of Distribution Transformer double pole Structure complete as per TNEB standard including painting feeders arrangement colour washing of RCC poles etc fixing of poles type to be unit HT/LT LAS and jumbering 3 nos earth pits with earth trough except erection of distribution Transformer
Erection of of 11 KV Single pole Structure including erection of DT complete as per TNEB TNEB standard including painting feeders arrangement colour washing of RCC poles etc fixing of poles type to be unit HT/LT LAS and jumbering 3 nos earth pits with earth trough except erection of distribution Transformer
Erection of Guarding X arm
Dismantling of Stay Set complete including stay rod
Dismantling of Stay set complete Without Stay rod
Dismantling of conductor of 7/2.59 including transporting the conductors to the nearset road side and stocking in coils
Dismantling of conductor of 7/3.35 including transporting the conductors to the nearset road side and stocking in coils
Dismantling of conductor of 7/4.09 including transporting the conductors to the nearset road side and stocking in coils
Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side
Dismantling of V Cross arm
Dismantling of 3 Phase X Cross Arm
Dismantling of Single phase X Cross
Dismantling of HT/LT TI Fitting
Dismantling of HT /LT pin insulators
Dismantling of strain Disc
Dismantling of Tapping/Guarding channel X Arm
Hiring of JCB
Hiring of crane
Exceeding 1 hour for every Hour
Transporting of charges of DT/line materials using private vehicle upto 20 KM(up and Down)
Beyond 20 KM for every KM
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .