| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.0 LAccepted-AOC | L1 | Accepted-AOC BEING L1 | |
| 2 | L2₹37.3 L+₹3.3 L (9.60%)Rejected-Finance 10 WARD NO 18 PLOT NO 34 KAMDENU FURNTIURE SIKAR RAJASTHAN 332025 | SIKAR | RAJASTHAN | 332025 | L2 | Rejected-Finance Not Being L1 | |
| 3 | L3₹38.4 L+₹4.4 L (13.0%)Rejected-Finance 1 225 5 6 SADAR BAZAR DELHI CANTT 110010 | NEW DELHI | DELHI | 110010 | L3 | Rejected-Finance Not Being L1 | |
| 4 | L4₹39.2 L+₹5.2 L (15.2%)Rejected-Finance 441 G F LIG FLATS PH 2 SEC 14 PKT 3 DWARKA NEW DELHI SECTOR 14 DWARKA DWARKA SOUTH WEST DELHI DELHI 110078 | SOUTH WEST DELHI | DELHI | 110078 | L4 | Rejected-Finance Not Being L1 | |
| 5 | L5₹39.9 L+₹5.9 L (17.5%)Rejected-Finance | L5 | Rejected-Finance Not Being L1 |
| Sl No | Description | Qty | Unit | Areca Technologies L5 | M P TYAGI ENGINEERS AND CONTRACTORS L3 | OMVIN ENTERPRISES LLP L4 | ISHWAR ENTERPRISES L6 | Ruchi enterprises L2 | ASHUTOSH BUILDERS L1 | ACR ENTERPRISES L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply, Installation, Testing and Commissioning of min 100KVA or Higher rating True - On - Line, Energy Efficient, configuration double conversion UPS with DSP (Digital Signal Processor) / Microprocessor Based Control System using IGBT Based Technology and High Switching Frequency PWM (Pulse Width Modulation) with PFC controlled IGBT Rectifier with Active Power factor Correction (APFC). The Design of the UPS shall be Modular Type with Decentralized parallel Architecture. In case of Overloading due to any reason the Total Load shall be transferable to Mains Source without affecting the working condition of equipment which are operational. Removing and Re-fixing of Modules shall be simple and must not affect the other modules. UPS must comprise of a continuous duty Bypass Static Switch. The UPS shall have internal / external Isolation Transformer of 100 KVA of same OEM Make. Input - 3ϕ & Output 3ϕ, 4 Wire system. The UPS shall abide by latest relevant IS. Power back up for 30 minutes using suitable rating of 12V SMF batteries including all accessories like SMF battery, M.S. stand (powder coated), Battery Leads Copper FRLS insulated duly Copper thimble on both ends of suitable ratings, battery shorting links & battery Charging system etc. complete in all respect as required, having following Parameters & Material: -
(a) Fully digital controlled based on (Digital Signal Processor) DSP.
(b) Input Power Factor shall > 0.99 & Output PF shall be Unity.
(c) Pure sine wave output
(d) Full time output Voltage and frequency regulation | 1 | Each | 24,78,127.68 ₹24,78,127.68 | 29,99,999 ₹29,99,999 | 23,50,000 ₹23,50,000 | 25,95,000 ₹25,95,000 | 18,00,000 ₹18,00,000 Lowest | 18,99,999 ₹18,99,999 | 26,56,000 ₹26,56,000 |
| 1.01(e) Auto regulation of battery end voltage (f) Intelligent interface with LED/ LCD screen display (g) Static bypass switch and manual bypass switch and inbuilt Phase sequence protection. (h) The UPS system must have inbuilt input & Output, bypass Isolators along with Emergency Power Off (EPO) facility. (j) Auto temperature compensation (Cooling Fan shall run Automatically) (k) Overall Efficiency >96% at 100% Load (l) Eco Mode Efficiency should up to 99% (m) Permitted Overload at Unity PF 115% for 10 Minutes and 130% for 60Seconds (n) Module Ratings 05Kw to 30Kw (m) Ratings / Capacity : 100KVA and above (o) Input voltage Range : 320 V to 460V AC 3Phase + N & PE (p) Output voltage : 380, 400, 415V, 3Ph + N + PE (q) No. of Phase : 3 ϕ, Neutral & Earth (r) THDi < 3% (s) Input Frequency 45 - 55 Hz (t) Output Frequency 50 - 60 Hz (with Automatic Selectable) (u) Input Power factor >=0.99 (v) Output Power factor : Unity (w) Static Voltage regulation : ± 1% (x) Parallel module Facility : System should run in Synchronizing mode and Module must be replaceable without effecting the working Efficiency. (y) Battery Testing : Automatic (z) Battery Circuit Breaker : As per OEM design standard and current capacity required. | ||||||||||
| 1.02(aa) Static Switch : Static bypass should be inbuilt in each power module so that there should be no single point of bypass failure. ie Static bypass should not be centralized. (ab) Max. Audible Noise at 1 Mtr. from unit : 65dBA at 100% load (ac) Environment Characteristics (Operating temperature/humidity) 0-40°C / 0 - 95% non-condensing (ad) Protections : O/L & S/C at outputs of UPS O/V at output Deep Discharge at battery terminals Over Temperature and IP 20. (ae) Monitoring of following parameters on display : (a) Voltage Mains Bypass, (b) Load with Ph to Ph & Ph to N (c) Current on each Ph - Input, Output & By Pass (d) Load % on each ph (e) Battery Current, Voltage, Remaining time & total (f) Load utilization (g) Load in KVA / KW on each Ph (h) Frequency (j) PF (af) Surge Protection: - The UPS shall be designed to withstand a surge current. (ag) UPS should be suitable to supply both Output Power and the Battery Charging current. (ah) Enclosure of UPS shall meet minimum IP 20 with Dust Free design /with Filters Protection & Footprint should not exceed 1.5 - 2.0 sq mtr (aj) BATTERY RATINGS (ak) Battery Bank : SMF Battery, 12V, Minimum VAH required, OEM to share the battery sizing for the same. (al) Battery Backup : 30 Minutes at 100 KVA Load at 0.8LPF (am) Battery Rack : Suitable size duly powder coated (an) Battery Cables / link : Suitable size, Copper Cables | ||||||||||
| 1.03Installation, testing & commissioning of 100 KVA UPS and all accessories,Detailed circuit diagram along with service manual shall be supplied in Triplicate. WARRANTY: UPS & Isolation Transformer : 1 (One) Year from the date of commissioning. (In case of fault reported shall be attended within 8Hrs & no condition more than 12hrs. Suppliers to provide the OEM Service contact and escalation Matrix along with Toll Free numbers to the client. Batteries: The batteries shall be guaranteed for the period of 2 (Two) Years from the date of commissioning | ||||||||||
| 2.00 | All as per item srl No 1.00 here-in-before but UPS Capacity 20 KVA with required accessories i.e Isolation Transformer and battery ratings etc all reqired for 20 KVA complete all as specified and directed by Engr-in-Charge. | 2 | Each | 6,13,919.04 ₹12,27,838.08 | 2,99,999 ₹5,99,998 Lowest | 6,50,000 ₹13,00,000 | 7,40,000 ₹14,80,000 | 8,10,000 ₹16,20,000 | 5,99,999 ₹11,99,998 | 7,43,750 ₹14,87,500 |
| 3.00 | Supply, installation, testing and commissioning of powder coated of approved colour compartmentalised cubicle LT Panel fabricated in 2.0 mm thick CRCA Sheet, Cable Entry will be Top & Bottom Suitable for Cable ,Lock, Rubber Gasket, hardware etc suitable for operation on 415 Volts, 50Hz, 3 Phase 4 wire AC supply . Aluminium Main Bus Bar, 250A, Load wise Sub Feeder Bus Bar Colour Coated Heat Shrink Bus Bar sleave Nut-Bolt, Washer ,Hardware etc. The panel shall be indoor free standing, floor mounting, dust and vermin proof type, adequate size cable alley with front operated rotary handles for MCCB's complete with gland plates, lifting hooks, ventilating louvers, busbars, inter connections, earthing, labelling electrical , as per specification and drawings, suitable for termination of cables as per single line diagram including accessories complete as required. A separate earth copper bus bar of size 25 mm x 5 mm to be provided throughout the length of the panel. Having CPRI test certificate breaking capacity Power & Control Wiring will be (ISI 1100V) flame smoke FRLS PVC Single Core Copper Wire, Copper Lugs, PVC Sleeve, Ferrules Numbers, Hardware & Labour etc with the following switchgears and accessories:-
(a) 125 A, 4P, 25 kA, TMD, MCCB - 02 (I/C)
(b) 125 A, 4P, ATS Switch - 01
(c) 63 A, 4P, 25 kA, TMD, MCCB - 02 (O/G)
(d) 40 A, 4P, 25 kA, TMD, MCCB - 02 (O/G)
(e) Multi dual source meter (PMX 6000 of Legrand or equivalent) incl necessary CT / PT of suitable ratio and control wiring etc | 1 | Each Job | 1,35,840 ₹1,35,840 | 1,99,999 ₹1,99,999 | 1,50,000 ₹1,50,000 | 1,50,000 ₹1,50,000 | 1,20,000 ₹1,20,000 Lowest | 1,99,999 ₹1,99,999 | 1,59,260 ₹1,59,260 |
| 3.01(f) Indicator lamp with integral circuit and cluster LED (RED, ORANGE, BLUE) -01 set Note : (a) All acccessories included in the panel cost such as MCCB, MCBs, rotary handles, and its accessories & metering etc. | ||||||||||
| 4.00 | Supply and Fix Automatic Transfer Switch, 63 Amps, 415V, 4 Pole, with sheet metal / SS enclosures and rotary handle, having auto / manual option including fixing on wall and making all necessary connections complete all as specified and directed by Engr-in-Charge. | 2 | Each | 23,641.92 ₹47,283.84 | 4,999 ₹9,998 Lowest | 30,000 ₹60,000 | 24,500 ₹49,000 | 60,000 ₹1,20,000 | 9,999 ₹19,998 | 35,000 ₹70,000 |
| 5.00 | SITC PVC insulated Copper Conductor (sheathed), flexible cable, 1100 volts grade of size 4 core 16 Sq mm including securing the cable on wall / cable tray with suitable fastners etc complete all as specified and directed by Engr-in-Charge. | 30 | RM | 1,145 ₹34,350 | 299 ₹8,970 Lowest | 680 ₹20,400 | 400 ₹12,000 | 999 ₹29,970 | 1,199 ₹35,970 | 710 ₹21,300 |
| 6.00 | SITC PVC insulated Copper Conductor (sheathed), flexible cable, 1100 volts grade of size 4 core 50 Sq mm including securing the cable on wall / cable tray with suitable fastners etc complete all as specified and directed by Engr-in-Charge. | 15 | RM | 3,705.6 ₹55,584 | 499 ₹7,485 Lowest | 1,900 ₹28,500 | 3,000 ₹45,000 | 1,500 ₹22,500 | 1,999 ₹29,985 | 2,300 ₹34,500 |
Tender Value
₹41.6 L
EMD Value
₹83,200
Closing Date
27 Jun 2025, 6:00 pmClosed
GE E/M RR HOSPITAL DELHI CANTT-10
GE E/M RR HOSPITAL DELHI CANTT-10
PROVN OF 2 X 20 KVA UPS FOR LABOUR ROOM AND BURN CENTRE AND 1 X 100 KVA UPS FOR X RAY DEPTT AT ARMY HOSP (R AND R) UNDER GE E/M RR HOSPITAL DELHI CANTT-10
2025_MES_711503_1
GE/H/T-15/2025-26
Open Tender
Electrical and Maintenance Works
Item Rate
120 days
GE E/M RR HOSPITAL DELHI CANTT-10
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
GE E/M RR HOSPITAL
₹83,200
Yes
28 Aug 2025
30 May 2025
30 Jun 2025
30 May 2025
27 Jun 2025
13 Jun 2025
Amount
Supply, Installation, Testing and Commissioning of min 100KVA or Higher rating True - On - Line, Energy Efficient, configuration double conversion UPS with DSP (Digital Signal Processor) / Microprocessor Based Control System using IGBT Based Technology and High Switching Frequency PWM (Pulse Width Modulation) with PFC controlled IGBT Rectifier with Active Power factor Correction (APFC). The Design of the UPS shall be Modular Type with Decentralized parallel Architecture. In case of Overloading due to any reason the Total Load shall be transferable to Mains Source without affecting the working condition of equipment which are operational. Removing and Re-fixing of Modules shall be simple and must not affect the other modules. UPS must comprise of a continuous duty Bypass Static Switch. The UPS shall have internal / external Isolation Transformer of 100 KVA of same OEM Make. Input - 3ϕ & Output 3ϕ, 4 Wire system. The UPS shall abide by latest relevant IS. Power back up for 30 minutes using suitable rating of 12V SMF batteries including all accessories like SMF battery, M.S. stand (powder coated), Battery Leads Copper FRLS insulated duly Copper thimble on both ends of suitable ratings, battery shorting links & battery Charging system etc. complete in all respect as required, having following Parameters & Material: - (a) Fully digital controlled based on (Digital Signal Processor) DSP. (b) Input Power Factor shall > 0.99 & Output PF shall be Unity. (c) Pure sine wave output (d) Full time output Voltage and frequency regulation
(aa) Static Switch : Static bypass should be inbuilt in each power module so that there should be no single point of bypass failure. ie Static bypass should not be centralized. (ab) Max. Audible Noise at 1 Mtr. from unit : 65dBA at 100% load (ac) Environment Characteristics (Operating temperature/humidity) 0-40°C / 0 - 95% non-condensing (ad) Protections : O/L & S/C at outputs of UPS O/V at output Deep Discharge at battery terminals Over Temperature and IP 20. (ae) Monitoring of following parameters on display : (a) Voltage Mains Bypass, (b) Load with Ph to Ph & Ph to N (c) Current on each Ph - Input, Output & By Pass (d) Load % on each ph (e) Battery Current, Voltage, Remaining time & total (f) Load utilization (g) Load in KVA / KW on each Ph (h) Frequency (j) PF (af) Surge Protection: - The UPS shall be designed to withstand a surge current. (ag) UPS should be suitable to supply both Output Power and the Battery Charging current. (ah) Enclosure of UPS shall meet minimum IP 20 with Dust Free design /with Filters Protection & Footprint should not exceed 1.5 - 2.0 sq mtr (aj) BATTERY RATINGS (ak) Battery Bank : SMF Battery, 12V, Minimum VAH required, OEM to share the battery sizing for the same. (al) Battery Backup : 30 Minutes at 100 KVA Load at 0.8LPF (am) Battery Rack : Suitable size duly powder coated (an) Battery Cables / link : Suitable size, Copper Cables
Installation, testing & commissioning of 100 KVA UPS and all accessories,Detailed circuit diagram along with service manual shall be supplied in Triplicate. WARRANTY: UPS & Isolation Transformer : 1 (One) Year from the date of commissioning. (In case of fault reported shall be attended within 8Hrs & no condition more than 12hrs. Suppliers to provide the OEM Service contact and escalation Matrix along with Toll Free numbers to the client. Batteries: The batteries shall be guaranteed for the period of 2 (Two) Years from the date of commissioning
All as per item srl No 1.00 here-in-before but UPS Capacity 20 KVA with required accessories i.e Isolation Transformer and battery ratings etc all reqired for 20 KVA complete all as specified and directed by Engr-in-Charge.
Supply, installation, testing and commissioning of powder coated of approved colour compartmentalised cubicle LT Panel fabricated in 2.0 mm thick CRCA Sheet, Cable Entry will be Top & Bottom Suitable for Cable ,Lock, Rubber Gasket, hardware etc suitable for operation on 415 Volts, 50Hz, 3 Phase 4 wire AC supply . Aluminium Main Bus Bar, 250A, Load wise Sub Feeder Bus Bar Colour Coated Heat Shrink Bus Bar sleave Nut-Bolt, Washer ,Hardware etc. The panel shall be indoor free standing, floor mounting, dust and vermin proof type, adequate size cable alley with front operated rotary handles for MCCB's complete with gland plates, lifting hooks, ventilating louvers, busbars, inter connections, earthing, labelling electrical , as per specification and drawings, suitable for termination of cables as per single line diagram including accessories complete as required. A separate earth copper bus bar of size 25 mm x 5 mm to be provided throughout the length of the panel. Having CPRI test certificate breaking capacity Power & Control Wiring will be (ISI 1100V) flame smoke FRLS PVC Single Core Copper Wire, Copper Lugs, PVC Sleeve, Ferrules Numbers, Hardware & Labour etc with the following switchgears and accessories:- (a) 125 A, 4P, 25 kA, TMD, MCCB - 02 (I/C) (b) 125 A, 4P, ATS Switch - 01 (c) 63 A, 4P, 25 kA, TMD, MCCB - 02 (O/G) (d) 40 A, 4P, 25 kA, TMD, MCCB - 02 (O/G) (e) Multi dual source meter (PMX 6000 of Legrand or equivalent) incl necessary CT / PT of suitable ratio and control wiring etc
(f) Indicator lamp with integral circuit and cluster LED (RED, ORANGE, BLUE) -01 set Note : (a) All acccessories included in the panel cost such as MCCB, MCBs, rotary handles, and its accessories & metering etc.
Supply and Fix Automatic Transfer Switch, 63 Amps, 415V, 4 Pole, with sheet metal / SS enclosures and rotary handle, having auto / manual option including fixing on wall and making all necessary connections complete all as specified and directed by Engr-in-Charge.
SITC PVC insulated Copper Conductor (sheathed), flexible cable, 1100 volts grade of size 4 core 16 Sq mm including securing the cable on wall / cable tray with suitable fastners etc complete all as specified and directed by Engr-in-Charge.
SITC PVC insulated Copper Conductor (sheathed), flexible cable, 1100 volts grade of size 4 core 50 Sq mm including securing the cable on wall / cable tray with suitable fastners etc complete all as specified and directed by Engr-in-Charge.
M & L for Earthing complete with GI earth plate electrode of size 60cm X 60cm X 6mm buried directly in ground vertically at a depth not less than 2.25 metre below normal ground level with top edge of earth plate at a depth not less than 1.5 metre below normal ground level surrounded from all sides by 15 cm thick and packed layer of charcoal dust and common salt filling in alternate layers etc and connected to and including GI strip of size 32x6 mm up to 7.5 mtr by means of bolts, nuts, check nuts and washers made of brass and protected by light grade 40mm dia upto 7.5 mtr long GI pipe connected to main control board and GI pipe light grade 20mm bore for watering and including funnel, wire mesh, RCC pit cover 50mm thick and PCC chamber pit with PCC 1:2:4 type C2 (including excavation and earth work disposal of surplus soil to a distance not exceeding 50 metre) and testing after completion all as specified and shown on plate No 3 of SSR Part-I 2009 complete all as specified and directed by the Engr-in-Charge.
Ruchi enterprises (BID ID -3330845)
M P TYAGI ENGINEERS AND CONTRACTORS (BID ID -3323643)
OMVIN ENTERPRISES LLP (BID ID -3326829)
Areca Technologies (BID ID -3338767)
ISHWAR ENTERPRISES (BID ID -3338939)
ACR ENTERPRISES (BID ID -3329991)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .