| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | ₹1.7 Cr Quoted ₹1.4 Cr | L1 | Accepted-AOC Contract Cost including 18 percent GST |
| 2 | L2₹1.6 CrRejected-AOC KHASRA NO 974 NH 24 MEHRAULI GHAZIABAD UTTAR PRADESH | MEHRAULI | GHAZIABAD | UTTAR PRADESH | ₹1.6 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹1.7 CrRejected-AOC H N 9 12 CHIRANJEEV VIHAR GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | ₹1.7 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹1.9 CrRejected-AOC 6 204 TIKONIYAN BELANGANJ AGRA | AGRA | AGRA | UTTAR PRADESH | ₹1.9 Cr | L4 | Rejected-AOC L4 |
| 5 | L5₹2.0 CrRejected-AOC KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹2.0 Cr | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | Durga Engineers and Earth Movers L5 | M/s B.B.Goyal L4 | ARTIST BRO L1 | M/S KOSHER CONSTRUCTION PVT. LTD. L2 | AJAY SHARMA L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in filling by transported good quality earth with average lead upto 5KM including all cost of material, labor, T&P etc and all taxes for proper completion of work excluding GST | 1,960 | M3 | 256 ₹5.0 L | 360 ₹7.1 L | 150 ₹2.9 L | 250 ₹4.9 L | 150 ₹2.9 L |
| 2.00 | Supply of Dry Split Stone (20-40 kg wt.) at Work Site including Loading, unloading,Stacking, Stacking of Stone,Cost of Labour T&P, Royalty and All other Taxes but Excluding GST, etc.complete. | 1,141.2 | M3 | 1,965 ₹22.4 L | 2,300 ₹26.2 L | 2,000 ₹22.8 L | 2,300 ₹26.2 L | 1,600 ₹18.3 L |
| 3.00 | Supplying GI wire crate 8 SWG GI wire of size 2.00 x 1.50 x 1.00 M and 15cmx15cm mesh double knotted i/c all cost of material, labour and T&P complete. | 213 | Nos | 1,390 ₹3.0 L | 2,000 ₹4.3 L | 1,400 ₹3.0 L | 2,300 ₹4.9 L | 2,000 ₹4.3 L |
| 4.00 | Laying and placing split stone (Lunching Apron) in GI wire crate 8 SWG GI wire of size 2.00 x 1.50x 1.00 M and 15cmx15cm mesh double knotted filled with boulder i/c all cost of material, labour and T&P complete. | 213 | Nos | 1,215 ₹2.6 L | 400 ₹85,200 | 200 ₹42,600 | 449 ₹95,637 | 400 ₹85,200 |
| 5.00 | Laying Split Stone (20-40 kg wt.) in Pitching i/c Cost of Labour T&P, Royalty and All other Taxes but Excluding Cost of Split Stone etc.complete. | 593.46 | M3 | 390 ₹2.3 L | 400 ₹2.4 L | 300 ₹1.8 L | 350 ₹2.1 L | 300 ₹1.8 L |
| 6.00 | Supply of HDPE Woven E C Bags Confirming To BIS No-11652-2014 of New Cement Bag size at site including Cost of Material, Carriage, Loding, Unloading,Stacking,T&P and Taxes etc. required for completion of Work. | 4,69,992 | Nos | 12 ₹56.4 L | 14 ₹65.8 L | 8 ₹37.6 L | 10 ₹47.0 L | 10 ₹47.0 L |
| 7.00 | Supply of HDPE Geo Bags made of 240 GSM Woven Fabric Confirming To BIS No-15351-2015 of size 1.09MX0.69 M at site including Cost of Material, Carriage, Loding, Unloading, Stacking, T&P and Taxes etc. required for completion of Work. | 4,147 | Nos | 115 ₹4.8 L | 170 ₹7.0 L | 110 ₹4.6 L | 200 ₹8.3 L | 150 ₹6.2 L |
| 8.00 | Filling of HDPE Woven E C Bags For Launcing Apron Confirming To BIS No-11652-2014 of New Cement Bag size With Fillilng Local Earth, Sewing and Placing in Position Within 60M Distance beyond 5.00 KM including all Cost of Labour,T&P, Nylone Rope Create and all other Taxes etc. Required for completion of Work. | 4,69,992 | Nos | 16.8 ₹79.0 L | 10 ₹47.0 L | 9 ₹42.3 L | 10 ₹47.0 L | 15 ₹70.5 L |
| 9.00 | Filling of HDPE Geo Bags made of 240 GSM Woven Fabric Confirming To BIS No-15351-2015 of size 1.09MX0.69M With Fillilng Local Earth, Sewing and Placing in Position Within 60M Distance beyond 5.00 KM including all Cost of Labour,T&P, Nylone Rope Create and all other Taxes etc. Required for completion of Work. | 4,147 | Nos | 40.4 ₹1.7 L | 95 ₹3.9 L | 55 ₹2.3 L | 110 ₹4.6 L | 70 ₹2.9 L |
| 10.00 | Spreading Excavated Earth in 30.00 Cm Thick Layers Over G.E.O Bags with all Cost of Labour T&P Etc Completion of Work. | 388.8 | M3 | 50 ₹19,440 | 15 ₹5,832 | 25 ₹9,720 | 15 ₹5,832 | 15 ₹5,832 |
Tender Value
₹3.0 Cr
EMD Value
₹6.0 L
Closing Date
16 Mar 2026, 5:00 pmClosed
Superintending Engineer Drainage Circle Gzb
near victoria park colony meerut
Anti-erosion work for the protection of village Kunheda situated on the left bank of Hindon river in Ghaziabad district
2026_UPIDC_1122007_8
07/SE/2025-26
Open Tender
Civil Works
90 days
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.0 L
Office of S.E.Drainage Circle gzb Meerut
30 Mar 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
16 Mar 2026
11 Mar 2026
12 Mar 2026
Earthwork in filling by transported good quality earth with average lead upto 5KM including all cost of material, labor, T&P etc and all taxes for proper completion of work excluding GST
Supply of Dry Split Stone (20-40 kg wt.) at Work Site including Loading, unloading,Stacking, Stacking of Stone,Cost of Labour T&P, Royalty and All other Taxes but Excluding GST, etc.complete.
Supplying GI wire crate 8 SWG GI wire of size 2.00 x 1.50 x 1.00 M and 15cmx15cm mesh double knotted i/c all cost of material, labour and T&P complete.
Laying and placing split stone (Lunching Apron) in GI wire crate 8 SWG GI wire of size 2.00 x 1.50x 1.00 M and 15cmx15cm mesh double knotted filled with boulder i/c all cost of material, labour and T&P complete.
Laying Split Stone (20-40 kg wt.) in Pitching i/c Cost of Labour T&P, Royalty and All other Taxes but Excluding Cost of Split Stone etc.complete.
Supply of HDPE Woven E C Bags Confirming To BIS No-11652-2014 of New Cement Bag size at site including Cost of Material, Carriage, Loding, Unloading,Stacking,T&P and Taxes etc. required for completion of Work.
Supply of HDPE Geo Bags made of 240 GSM Woven Fabric Confirming To BIS No-15351-2015 of size 1.09MX0.69 M at site including Cost of Material, Carriage, Loding, Unloading, Stacking, T&P and Taxes etc. required for completion of Work.
Filling of HDPE Woven E C Bags For Launcing Apron Confirming To BIS No-11652-2014 of New Cement Bag size With Fillilng Local Earth, Sewing and Placing in Position Within 60M Distance beyond 5.00 KM including all Cost of Labour,T&P, Nylone Rope Create and all other Taxes etc. Required for completion of Work.
Filling of HDPE Geo Bags made of 240 GSM Woven Fabric Confirming To BIS No-15351-2015 of size 1.09MX0.69M With Fillilng Local Earth, Sewing and Placing in Position Within 60M Distance beyond 5.00 KM including all Cost of Labour,T&P, Nylone Rope Create and all other Taxes etc. Required for completion of Work.
Spreading Excavated Earth in 30.00 Cm Thick Layers Over G.E.O Bags with all Cost of Labour T&P Etc Completion of Work.
Supply & Fixing of Porcupine Constructed with 1:2:4 R.C.C Having 6 Nos Member of size 3.00X0.10X0.10M Joined with Specified Bolt & Washers ll including All Cost of Material, Carriage, Loding, Unloading, Stacking, T&P and Taxes etc. required for completion of Work.
Supplying & Fixing of Bamboo Bracing 85-100 mm dia i/c all /Cost of Material, labour, T&P and Taxes Etc. Required for Completion of Work.
Supplying and Filling Jhankar or Jhau and Placing in Position Involing Carriage up to 5.00 km I/c all Cost of Material, Labour, T&P and Taxes etc. Required for Completion of Work.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BookletalldivWork.pdf
Tender Documents • 2.48 MB
BOQ_2093197.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid