| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-Finance | L1 | Accepted-Finance L1 LOWEST PRICE BIDDER | |
| 2 | L2₹26.0 L+₹60,434.95 (2.38%)Rejected-Finance | L2 | Rejected-Finance RATES ARE ON HIGHER SIDE BIDDER | |
| 3 | L3₹28.9 L+₹3.5 L (13.8%)Rejected-Finance | L3 | Rejected-Finance RATES ARE ON HIGHER SIDE BIDDER | |
| 4 | L4₹29.9 L+₹4.5 L (17.8%)Rejected-Finance NEW MADHOPUR COLONY SURAJKUND GORAKHPUR UTTAR PRADESH 273001 | GORAKHPUR | UTTAR PRADESH | 273001 | L4 | Rejected-Finance RATES ARE ON HIGHER SIDE BIDDER | |
| 5 | L5₹30.0 L+₹4.7 L (18.4%)Rejected-Finance HAFIZPUR BHAGAT SINGH CHAURAHA SADAR AZAMGARH AZAMGARH UTTAR PRADESH 276001 | AZAMGARH | UTTAR PRADESH | 276001 | L5 | Rejected-Finance RATES ARE ON HIGHER SIDE BIDDER |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
20 Jan 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING OFFICER
220 KV Sub station gidahi Basti
Work of Diversion of 02 Nos towers of 132 KV Bansi-Dumariyaganj line , Under ETD-II Basti
2022_UPTCL_674633_1
37
Open Tender
Electrical Works
Lump-sum
90 days
220 KV Sub station Gidahi Basti
As Per Tender
2 documents required · 2 mandatory
₹3,540
UPSEB ELECTRICITY TRANSMISSION DIVN
₹30,000
8 Feb 2022
15 Jan 2022
21 Jan 2022
15 Jan 2022
20 Jan 2022
15 Jan 2022
90 days
Amount
Following works are to be carried out between Tower Location No. 92 to 93 of 132 KV Bansi-Dumariyaganj Line as per technical specification with all cost of men material misc. consumable T&P Transpotation Loading /Unloading etc. for proper completion of work with due care of safety and precaution as per instruction of the superwising Engineer
Anchoring by providing of stay on cross arm of tower at Location No. 91 A+0 and 94 A+0 before removal of old conductor including suitable fixing of stay rod by making C C Foundation and removal thereof, after completion of work ( 1 Job per stay)
Safe dismentalling / Dihoisting of ACSR Panther conductor with tension fitting , Insulator hardware , Vibration damper etc of all the three phase between tower location No. 92 to 93
Safe dismentalling / Dihoisting of of earthwire between section tower location 92 to 93
Dismantling of all Two Tower ( 92B, 93C ) including necessary use of gas cutter for cutting of welded bolts & Nuts.
Survey and Profilling
Check Survey
Safe carriage of stub and other material from 220 kv s/s Barahuwa Gorakhpur to working site on private vehicle arranged by the contractor including unloading of the same on the site
cost of excavation of 132 kv SC four Nos C+0 type and one No C+10 type( Total 05 Nos.) tower including all foundation pit including all earth work back filling leveling etc
Setting of stub of 132 kv S/C tower including all foundation work , excluding the cost of concreting and excavation
Concreting of foundation with M20 grade cement concrete mixture in the ratio of 1:2:4 with 20mm stone metal for bottom pad, including cost of material Dewatering shoring ,shuttering , farming, curing etc. For 132 kv S/C tower foundation.
Installation of steel reinforcement bars in RCC foundation
Erection of supper structure of 132 kv bansi Naugarh Line and its parts including all wrok above ground level excluding hoisting of insulator, hardware and accessories but including fitting of danger plates ,phase plate , number plates and punching of bolts
Tack welding
Laying, stringing, Tensioning, clamping , jointing etc of ACSR Panther conductor including hoisting of insulator , fitting of all necesory hardware and accessories .Fitting of armour rod, vibration damper etc at newly erected tower.
Laying, stringing, Tensioning, clamping , jointing etc of Earth wire 7/10 SWG including hoisting of insulator fitting of all necesory hardware and accessories at newly erected tower.
Pipe earthing of tower including cost of pipe type earthing equipment set & associated earthing consumables
Safe carriage of dismantled /remaining material from working site to 132 kv S/S Dumariyaganj on private vehicle arranged by the contractor including unloading of the same at site.
Supply
Nut & Bolts @ 4% of tower parts
CNT & C+5 m
Number plate
Danger Plate
Phase plate
Earthing Material
Vibration damper
M S Joint
Repair sleeve and other Items
Single Tension Fitting
V.P.Associates
Rama Power construction
ARK ENGINEERING
M/S SHEKHAR ENGINEERING WORKS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .